Summary
Management framed 2025 around ramping Inner Mongolia capacity, while leaving major project approvals and profit conversion uncertain.
- All three Inner Mongolia production lines are expected to reach design capacity in the first half of 2025.
- Xinjiang project materials are prepared, but submission to the NDRC is still being coordinated and no approval timeline was given.
- Management declined to infer 2025 net profit from 2024 margins and operating-profit relationships.
Guidance
- 4.98M4.98 million tons polyolefin production planned for 2025, including 2.27 million tons in Ningdong and 2.71 million tons in Inner Mongolia
- 220,000 tons EVA production planned for 2025
- All three Inner Mongolia production lines expected to reach design capacity in the first half of 2025
- 2M2 million tons/year planned capacity for Ningdong Phase V olefin project
What analysts pressed on
- 01Xinjiang approval timing and probability: materials are ready, but submission is being coordinated; no timeline or odds were provided.
- 02Inner Mongolia ramp-up and capacity: the three lines are expected to reach design capacity in the first half of 2025.
- 03Coal costs and olefin economics: management disclosed regional raw-coal prices, product prices, and gross profit per ton.
- 04Project costs and profitability: Inner Mongolia olefin cost is about 300 yuan/ton below Ningdong, but net profit estimates were not endorsed.
- 05New project investment and coal supply: supporting coal-resource bidding is underway, with no quantified progress or timing given.
Notable disclosures
- 30.556B30.556 billion yuan had been invested in the Inner Mongolia project by December 31, 2024.
- 47.8B47.8 billion yuan is the stated total investment for the Inner Mongolia coal-to-olefin and green-hydrogen demonstration project.
- The third Inner Mongolia production line entered trial production in March 2025, later than the first two lines.
- The company implemented an employee stock ownership plan for some middle and senior managers in 2024.
Risks raised
- Xinjiang project approval remains uncertain, with required materials still being coordinated for submission to the NDRC.
- Supporting coal resources for Inner Mongolia are still being pursued through a bidding process.
- Management would not provide a 2025 net-profit estimate based on 2024 operating-profit and net-profit relationships.
- Coal consumption varies with coal quality; management disclosed about 4.5 tons of gasified coal per ton of polyolefin.
Tone: Mildly positive 0.35
The call emphasized capacity ramp-up and lower Inner Mongolia costs, but provided limited certainty on approvals, coal supply, and profit outcomes.
Who spoke
Company
- Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
- Gao YuVice President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
- Huang AijunSecretary of Board of Directors of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Full transcript
Analyst questions are marked with a bar. Timestamps are into the recording.
Prepared remarks
ModeratorSSE Roadshow Center
Ladies and gentlemen, investors and netizens, hello! Welcome to Baofeng Energy's 2024 Annual Performance Presentation. This activity is sponsored by Ningxia Baofeng Energy Group Co., Ltd. and supported by the network platform provided by Shanghai Stock Exchange Information Network Co., Ltd. Thank you for your attention and participation. On March 12, Ningxia Baofeng Energy Group Co., Ltd. published the Annual Report of 2024. Investors can log on the website of Shanghai Stock Exchange (https://www.sse.com.cn/) or this platform (https://roadshow.sseinfo.com/). View related announcements.
In order to facilitate investors to have a more comprehensive and in-depth understanding of the company's operating results and financial situation in 2024, the company decided to hold a performance presentation of Baofeng Energy in 2024. In today's event, the main members of Baofeng Energy Management visited the Shanghai Roadshow Center and will communicate with investors. Everyone is welcome to participate actively. <br>
Questions and answers
Investor
What is the income tax rate of Inner Mongolia olefin project? Do you enjoy the tax reduction and exemption policy within three to five years after putting into operation?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The income tax rate of Inner Mongolia Olefin Project is 15%, and it will continue to enjoy preferential tax policies for the development of the western region after putting into operation. Thank you for your interest!
Investor
What is the current progress of the Xinjiang Olefin Project and when will it enter the joint approval stage of the Ministry of Environmental Protection and other five departments? What is the expected probability of approval? Compared with other olefin projects in Xinjiang, what are the advantages in approval, and whether the relevant ministries and commissions of the state support or restrict or oppose the olefin projects in Xinjiang?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The regulatory materials required to be submitted to the National Development and Reform Commission for the Xinjiang Project have been prepared, of which the materials required to be prepared by the Company have been prepared and reviewed by experts, and the relevant supporting materials required to be issued by the Xinjiang Autonomous Region Government have been completed. At present, it is coordinating to report to the National Development and Reform Commission.
After the regulatory materials are submitted to the National Development and Reform Commission, they shall be jointly reviewed by the National Development and Reform Commission, the Ministry of Ecology and Environment, the Ministry of Natural Resources, the Ministry of Water Resources, the Ministry of Emergency Management and the Ministry of Industry and Information Technology. When the project makes significant progress, the company will fulfill the obligation of information disclosure in a timely, comprehensive and accurate manner. Thank you for your interest!
Investor
What is the current progress of the Xinjiang project? Is there an estimated time for the approval to be completed?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The regulatory materials required to be submitted to the National Development and Reform Commission for the Xinjiang Project have been prepared, of which the materials required to be prepared by the Company have been prepared and reviewed by experts, and the relevant supporting materials required to be issued by the Xinjiang Autonomous Region Government have been completed. At present, it is coordinating to report to the National Development and Reform Commission.
After the regulatory materials are submitted to the National Development and Reform Commission, they shall be jointly reviewed by the National Development and Reform Commission, the Ministry of Ecology and Environment, the Ministry of Natural Resources, the Ministry of Water Resources, the Ministry of Emergency Management and the Ministry of Industry and Information Technology. When the project makes significant progress, the company will fulfill the obligation of information disclosure in a timely, comprehensive and accurate manner. Thank you for your interest!
Investor
According to the information of the shareholders' meeting released by Baofeng, this year's planned operating income is 52.6 billion yuan, the operating cost is 34.7 billion yuan, and the operating profit is 17.9 billion yuan. According to the annual report of 2024, the operating profit is 7.83 billion yuan, the net profit is 6.34 billion yuan, and the net profit/operating profit = 81.0%, this year's net profit is about 14.5 billion yuan. Can it be calculated in this way? What is the income tax rate of Inner Mongolia olefin project?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The operating profit is related to the net profit, but the profit in 2025 cannot be calculated according to the data in 2024; the income tax rate of Inner Mongolia olefin project is 15%. Thank you for your interest!
Investor
Does the company consider investing in the coal-to-olefin process in Indonesia and other countries with abundant coal resources and large demand for products?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The external investment of the Company falls within the scope of information disclosure. If there is any relevant plan, the Company will fulfill the obligation of information disclosure in accordance with the relevant provisions. Thank you for your interest!
Investor
According to the information of the 2024 annual shareholders' meeting released by Baofeng, the planned output of polyolefin this year is 4.98 million tons and EVA is 220,000 tons. How much is Ningdong and Inner Mongolia respectively?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! In 2025, the company plans to produce 4.98 million tons of polyolefin, including 2.27 million tons in Ningdong area, 2.71 million tons in Inner Mongolia olefin project and 220,000 tons in EVA. Thank you for your interest!
Investor
How many tons of olefins are planned for Ningdong Phase V, when to start project approval and when to start construction? When will the 500,000 tons/year olefin of Ningdong Phase IV be put into production? Dalian's third-generation olefin plant is 1 million tons per year, which does not match 500000 tons. How does the company consider here? When will the 500,000 tons/year olefin of Ningdong Phase IV be put into production? Dalian's third-generation olefin plant is 1 million tons per year, which does not match 500000 tons.
How does the company consider here? Will it be implemented after the fifth phase of Ningdong?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! (I) The planned production capacity of Ningdong Phase V Olefin Project is 2 million tons/year, and the preparatory work for project approval is currently under way. (2) Ningdong Phase IV Olefin Project has obtained the project approval procedures, and completed the site leveling, foundation dynamic compaction and other work. The company will optimize the production process and product scheme according to the development of coal-to-olefin technology and equipment, so as to maximize the investment benefit of the project.
Thank you for your interest!
Investor
At present, how much is the price of raw coal used in Ningdong and Inner Mongolia olefin projects? What is the selling price (ex-factory) of polyethylene and polypropylene respectively? What is the gross profit per ton of olefins in Ningdong and Inner Mongolia respectively?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! At present, the price of raw coal in Ningdong area of Baofeng Energy is about 519 yuan/ton, and the price of raw coal in Inner Mongolia area is about 487 yuan/ton. The average ex-factory price of polyethylene in Ningdong region is about 7300 yuan/ton, and the average ex-factory price of polypropylene is about 7070 yuan/ton; the average ex-factory price of polyethylene in Inner Mongolia region is about 7420 yuan/ton, and the average ex-factory price of polypropylene is about 6930 yuan/ton.
The gross profit per ton of polyolefin in Ningdong region is about 2732 yuan/ton, and the gross profit per ton of polyolefin in Inner Mongolia region is about 3018 yuan/ton. Thank you for your attention!
Investor
How much money has been invested in the Inner Mongolia project?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! As of December 31, 2024, the Inner Mongolia Olefin Project has completed an investment of 30.556 billion yuan. Thank you for your interest!
Investor
Is there any supporting coal mine for the Inner Mongolia project? What is the progress of the supporting coal mine?
Gao YuVice President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The Company is promoting the bidding for the supporting coal resources of the Inner Mongolia Project as planned. If significant progress is made, the Company will fulfill its information disclosure obligations as required. Thank you for your interest!
Investor
How much is the total investment of the green hydrogen project in Inner Mongolia? How much to invest in 25 years? What are the specific projects? Is there any advantage compared with the cost of coal? Is there any specific data?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! Baofeng Inner Mongolia Company's 2.6 million tons/year coal-to-olefin and green hydrogen 400,000 tons/year olefin carbon neutralization demonstration project has a total investment of 47.8 billion yuan, and has completed an investment of 30.556 billion yuan as of December 31, 2024. Thank you for your interest!
Investor
When will Inner Mongolia Phase II start project approval and what is the expected probability of approval?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! Inner Mongolia Phase II Olefin Project is advancing the preliminary work of the project as planned. When significant progress is made, the Company will fulfill its information disclosure obligations in accordance with the information disclosure requirements. Thank you for your interest!
Investor
What is the daily output of the first and second series of polyolefins of the Inner Mongolia Project? Has it reached the production capacity? What are the technical and economic indicators such as the ratio of alcohol to olefin? When will the third series be put into production and when is it expected to reach the production capacity?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The first production line of Inner Mongolia Olefin Project will be put into trial production in November 2024, the second production line will be put into operation in January 2025, and the third production line will be put into trial production in March 2025. According to the trial production plan, all three production lines will reach the design capacity in the first half of 2025. Thank you for your interest!
Investor
By the end of March, how many tons of polyolefin have been produced in the first and second series of Inner Mongolia this year? How many tons are produced per day at present? Has the production capacity been reached?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The first production line of Inner Mongolia Olefin Project will be put into trial production in November 2024, the second production line will be put into operation in January 2025, and the third production line will be put into trial production in March 2025. According to the trial production plan, all three production lines will reach the design capacity in the first half of 2025. Thank you for your interest!
Investor
When will the first and second series of Inner Mongolia olefins be put into production, and how many days will it take to reach production?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The first production line of Inner Mongolia Olefin Project will be put into trial production in November 2024, the second production line will be put into operation in January 2025, and the third production line will be put into trial production in March 2025. According to the trial production plan, all three production lines will reach the design capacity in the first half of 2025. Thank you for your interest!
Investor
General Manager Liu, the management of the company has been very stable. Does the company have an option or equity incentive plan for middle-level and employees?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! In 2024, the company has implemented the employee stock ownership plan for some middle and senior managers, and the follow-up company will continue to implement the employee stock ownership or equity incentive plan according to the needs of production and operation. Thank you for your interest!
Investor
What is the calorific value of the coal used in the Inner Mongolia Project and the Ningdong Project?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The source of the coal resources used in the Inner Mongolia Project and the Ningdong Project is the core business secret of the Company. Please understand that it is not convenient to tell us! Thank you for your interest!
Investor
Inner Mongolia Phase III 1 million tons of olefins, when will it reach full production?
Gao YuVice President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The third production line of Inner Mongolia Olefin Project was put into trial production in March 2025. According to the trial production plan, all three production lines will reach the design capacity in the first half of 2025. Thank you for your interest!
Investor
Company investor hot line is 09515558031, often make impassability, how is the company communicated with investor at ordinary times excuse me
Huang AijunSecretary of Board of Directors of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! First, because Ningxia Hui Autonomous Region has Eid al-Fitr and Gurban Festival every year, other places may be working days during the holidays; Second, during the period when the company holds the shareholders' meeting, the board of directors, all kinds of performance presentations, and participates in the training of the regulatory authorities, there may be no answer to the working phone. If no one answers the phone, you can contact again at another time, or leave a message online through the E interaction of the Shanghai Stock Exchange, and the company will reply in time.
Thank you for your understanding and concern!
Investor
How much has the cost of olefin products of Inner Mongolia Project decreased compared with Ningdong Project?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! At present, the cost per ton of olefin products of Inner Mongolia Project is about 300 yuan/ton lower than that of Ningdong Project. Thank you for your interest!
Investor
What is the net profit of polyethylene and polypropylene in 2024? How many tons of refined products will be produced in 2024?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! In 2024, the company's gross profit per ton of polyolefin was 2350 yuan/ton, and the output of major fine chemical products was 321400 tons. Thank you for your interest!
Investor
How much gasification coal and steam coal does the company need to produce 1 ton of olefin? Is the coking coal produced by the company used to produce coke now? How much clean coal do we need to mine outside?
Liu yuanguanDirector and President of Ningxia Baofeng Energy Group Co., Ltd., Ningxia Baofeng Energy Group Limited by Share Ltd
Dear investors, hello! The coal consumption for the production of 1 ton of polyolefin products is closely related to the coal quality. According to the coal ratio currently implemented by the Company, about 4.5 tons of gasified coal are needed for the production of 1 ton of polyolefin products. All the refined coal produced by the Company is used for the production of coke, and the proportion of the refined coking coal mined outside accounts for about 50% of the coal used for the production of coke.
Thank you for your interest!
ModeratorSSE Roadshow Center
This is the successful conclusion of the annual performance presentation of Baofeng Energy in 2024. Thank you for the active participation of investors and netizens. If you have further questions, you can keep communicating with the company through the e interactive platform of Shanghai Stock Exchange. Thank you!
Other Ningxia Baofeng Energy Group earnings calls
- written Q&A, November 3, 2026
Management framed near-term earnings as improving after October’s stronger polyolefin prices, while emphasizing project execution, cost control and shareholder-return balance.
Nov 03, 2026Positive0.55 - written Q&A, September 16, 2026
Management framed Baofeng as a cost-advantaged coal-to-olefin producer investing in green hydrogen, product differentiation and capacity growth.