China Energy Engineering (601868:SSE) Q3 2026 earnings call transcript

Transcript, summary, guidance, and what analysts pressed on from the China Energy Engineering Corporation call on November 4, 2026.

FreeSee China Energy Engineering's financials in GloomOpen in browser →Jump to the transcript
Held
November 4, 2026
Tone
Mildly positive0.15
Words
3,586
Data-center IT load under construction
about 200 MWdeployment tied to market demand
Compressed-air storage operating projects
one
Compressed-air storage projects under construction
three
Compressed-air design capability
60-350 MWfull-capacity level
2026 bond financing rates
1.34%-2.04%vs 1.49%-2.35% in 2025
2026 nuclear approvals
4 projects and 8 units
2025 nuclear approvals
5 projects and 10 units

Summary

Management framed the quarter as structurally improving despite pressure on operating indicators, emphasizing energy, water and overseas opportunities alongside balance-sheet discipline.

  • One compressed-air storage project is operating and three are under construction, with plans to extend into equipment and lifecycle services.
  • About 200 MW of data-center IT load is under construction; deployment will follow market absorption and reserved customer demand.
  • Management attributed higher financial expenses mainly to expanding interest-bearing liabilities, while citing lower bond financing rates than in 2025.

What analysts pressed on

  • 01Asset-liability control: management said it would keep the ratio within the annual budget target but gave no numerical target.
  • 02Data-center utilization: management cited about 200 MW under construction and said rollout would follow market demand and pre-arranged users.
  • 03New-energy returns: management acknowledged income pressure after Document No. 136 and emphasized cost control and power-trading capabilities.
  • 04Dividends and buybacks: management reiterated shareholder-return priorities but gave no payout increase, interim dividend, or repurchase plans.
  • 05Nuclear project pipeline: management said it is tracking approved-project tenders but declined to identify specific projects.
  • 06New-energy order conversion: management said wind-and-solar base orders convert faster, while offshore wind has a longer planning cycle.

Notable disclosures

  • 1.34%1.34%-2.04% was the 2026 bond financing rate range, below 1.49%-2.35% in 2025, despite higher total financial expenses.
  • One compressed-air storage project is operating and three are under construction; management cited 60-350 MW full-capacity design capability.
  • About 200 MW of data-center IT load is under construction, with staged deployment tied to market consumption and on-shelf rates.
  • Management said the dividend policy does not distinguish between A shares and H shares.

Risks raised

  • New-energy projects face income pressure as electricity sales enter the market under Document No. 136.
  • Expanding interest-bearing liabilities and heavy-asset investment in new energy, storage and water conservancy are raising financial expenses.
  • Management said greater overseas revenue could increase short-term financial-cost volatility from exchange-rate movements.
  • Data-center projects face utilization risk from periodic excess computing-power supply; management gave no expected on-shelf rate.
  • Offshore wind projects have longer planning cycles and longer order-conversion timelines as development moves into deeper waters.

Tone: Mildly positive 0.15

Management emphasized strategic opportunities and operating resilience, but acknowledged pressure on indicators, new-energy returns, financing costs and utilization.

Who spoke

Company

  • Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Full transcript

Analyst questions are marked with a bar. Timestamps are into the recording.

Prepared remarks

ModeratorSSE Roadshow Center

Ladies and gentlemen, investors and netizens, hello! Welcome to the third quarter performance presentation of China Nengjian 2026. This activity is sponsored by China Energy Engineering Co., Ltd. and supported by the network platform provided by Shanghai Stock Exchange Information Network Co., Ltd. Thank you for your attention and participation. On October 30, China Energy Engineering Co., Ltd. published the Third Quarter Report of 2026. Investors can log on the website of Shanghai Stock Exchange (https://www.sse.com.cn/) or this platform (https://roadshow.sseinfo.com/).

View related announcements. In order to facilitate investors to have a more comprehensive and in-depth understanding of the company's operating results and financial situation in the third quarter of 2026, the company decided to hold the third quarter performance presentation of China Nengjian in 2026. In today's event, the main members of the management of China Nengjian will visit the Shanghai Roadshow Center and communicate with investors. Everyone is welcome to participate actively. First of all, let's welcome guests from listed companies to make opening speeches.

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Dear investors, good afternoon! Welcome to the third quarter performance presentation of China Nengjian 2026. In the first three quarters of 2026, facing the complex and severe external environment, the company gave full play to the advantages of the integration of the whole industry chain of energy, power and water resources, took the initiative to seize the historical opportunity of energy transformation and the construction of "six networks", expanded the market space in the implementation of the national strategy, and activated the endogenous power in deepening reform and innovation.

In the first three quarters of 2026, the company achieved a new contract value of RMB 662.269 billion, an operating income of RMB 309.237 billion and a net profit of RMB 2.616 billion.

The main operating indicators are under pressure at different stages, but the effect of structural adjustment is gradually emerging, the concentration of the main industries responsible for energy, power and water resources is further improved, the demonstration projects of new technologies in the fields of new energy storage, hydrogen energy and power coordination are accelerated to enter commercial operation, the overseas business operation is stable, and the core competitiveness, anti-cyclical resilience and industry of the company are stable. The overall operation continues to maintain the trend of "total adjustment, structural optimization, kinetic energy conversion and resilience enhancement".

Questions and answers

Investor

Is there a clear year-end control target for the company's asset-liability ratio?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The Company attached great importance to the management and control of asset-liability ratio. At the beginning of the year, it formulated the overall control target of asset-liability ratio, and issued the control target of asset-liability ratio to its affiliated enterprises to consolidate the main responsibilities at all levels.

In the fourth quarter, the Company will continue to push forward the reduction of asset-liability ratio in a down-to-earth manner, make concerted efforts from the aspects of legal person, assets, liabilities, equity, capital, investment, cost and security, and take various measures to control the asset-liability ratio within the annual budget target.

Firstly, strengthen dynamic monitoring, strictly control the whole life cycle management of projects, promote the dynamic balance of assets and liabilities, and promote the return to a reasonable level; secondly, strengthen the centralized management of funds and the overall planning of financial resources, and enhance the resilience and stability of cash flow; thirdly, scientifically optimize equity financing, and continuously improve the efficiency of asset value management and capital allocation; Fourthly, through systematic management and structural optimization, we can continuously improve the quality and efficiency of operation and the ability to resist risks, and consolidate the foundation of sustainable operation and value creation.

Investor

How many projects does the company have in hand in the field of compressed air energy storage? How about the expansion of extended business such as equipment manufacturing and technology export?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The Company has conducted a comprehensive survey of the potential compressed air energy storage resources across the country, forming an echelon project reserve, and differentiated the layout according to the resource endowment and local conditions. At present, one project has been put into operation and three projects are under construction.

Focusing on gas storage, high-pressure sealing and heat storage and exchange systems, we will continue to tackle key problems, promote the self-control of key equipment and materials, explore the integrated supply mode of "design + process package + equipment set", and steadily promote industrial iterative R & D and large-scale production.

It has 60-350 MW full-capacity level design capability, forming differentiated construction capabilities such as chamber excavation and sealing, main engine installation, integrated commissioning of heat storage and exchange; at the same time, it develops full life cycle value-added services such as geological assessment, reservoir site optimization, feasibility study consultation, scheme review, power station operation and maintenance, gas storage status monitoring, and realizes comprehensive extension from project delivery to comprehensive technical services.

Investor

What is the total IT load of the data center currently under construction? Under the background of periodic excess supply of computing power in some areas, how can company avoid the shelf rate falling short of expectations?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The company's IT load under construction is about 200 MW. Relevant projects will arrange follow-up operation plans in an orderly manner according to market consumption and on-shelf rate. In the stage of project demonstration and site selection, the location is optimized, and the eight national backbone nodes of the national integrated computing power network are laid out.

In the implementation stage, the principle of production based on sales is strictly followed step by step, and the computing power user resources such as public cloud and private cloud are reserved through multiple channels to expand the market development path.

Investor

What arrangements does the company take to hedge the impact of RMB exchange rate fluctuations?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The Company adheres to the principle of neutral exchange rate management. Firstly, natural hedging is given priority, and foreign currency assets, liabilities and cash flows are coordinated, so that foreign currency income and foreign currency expenditure can form internal hedging in terms of currency and term as far as possible.

Secondly, hedging instruments are used as a supplement, and financial instruments such as forwards and swaps are used to hedge large exposures in compliance with regulations; Thirdly, it will strengthen exposure management, improve risk identification, exposure measurement and stress testing, and enhance foreign exchange management; fourthly, it will adhere to source control, promote the use of RMB from the source of business, and reduce currency mismatch.

Investor

In the first three quarters of 2026, the company's overseas business income and gross profit increased year on year. What are the landmark projects in the new contract?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

The company insists on paying equal attention to global layout and territorial deep cultivation, focusing on the core business of energy, power and water resources to expand overseas markets, actively seizing strategic opportunities such as global energy transformation, high-quality co-construction of "the Belt and Road" and "global South" market expansion, and expanding overseas market space, with the amount of new contracts signed abroad in the first three quarters of 2026.

Successfully signed contracts with Guodian Investment for Kazakhstan Pavlodar 1GW Wind Power and 300 MW Energy Storage Project, Saudi Arabia Dawangdemi 1.5G W Wind Power EPC Project, South Africa Nuoxi 475 MW Photovoltaic Power Station Project, Egypt Nefer titi 500 MW/1000 MWh Energy Storage EPC Project, etc.

Investor

How does the company guarantee the timely settlement of the project funds of the spot exchange project?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The company focuses on four aspects to ensure the timely settlement of cash business project funds: First, at the stage of contract signing, the starting point of payment, payment method, process settlement time limit and the longest payment period are clearly defined, and vague clauses are reduced. The second is to strictly implement the process settlement, and settle the undisputed quantities with the owner in full and on time.

The third is to implement the owner's project payment guarantee, fund account management and dynamic monitoring, and strengthen the early warning of repayment and overdue collection. Fourthly, the situation of repayment should be included in the project assessment, the responsibility of project manager, business and financial coordination should be consolidated, and measures to safeguard rights should be taken according to law when necessary.

Investor

Is the rate of return on capital of new energy projects affected after the implementation of "Document 136"?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! Document No.136 promotes the new energy on-grid electricity to enter the electricity market in an all-round way, and the new energy industry is generally facing the situation of income pressure. By strengthening the cost control of projects under construction, the company strengthens the overall planning of the group's integrated power trading system, improves the trading capacity, and comprehensively implements measures to enhance the profitability of projects.

At the same time, we should give full play to the advantages of the company's planning and design, strengthen the front-end planning of the project, actively lay out the new energy integration development model, and enhance the competitiveness of the project from the source.

Investor

In the third quarter, domestic water conservancy business contracts increased by 331% over the same period last year. What projects did the growth mainly come from? How can company consolidate its competitive advantage in the market of large-scale water conservancy and hydropower projects?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! In the third quarter, the company's domestic water conservancy business contracts mainly focused on water sources and water supply, river and lake management and flood control, including some bidding sections of the Three Gorges New Water Transport Channel Project and the Xiaoshuihe River Basin EOD Project in Chencang District, Baoji.

Based on serving the overall situation of the national water security strategy, the company gives full play to the advantages of planning consultation, survey and design, investment and construction, engineering construction, operation and maintenance, high-end equipment manufacturing, digital science and technology "seven in one" industry chain platform, and adheres to the principle of "policy feasibility, future predictability, technology controllability, economic feasibility, market capacity and capacity". Flood control and disaster reduction, water diversion projects, water supply and irrigation, water ecological restoration, and digital and intelligent water conservancy.

To coordinate the stable scale of public welfare projects, improve the efficiency of market projects, expand the space for stock transformation, and strengthen the barriers of digital empowerment, comprehensively implement the four core measures of "grasping major strategic projects, grasping policy and capital channels, grasping business model innovation, and grasping the deep cultivation of the whole region", and systematically strengthen the comprehensive service capability of the whole industry chain of water resources of the group.

We will continue to consolidate and enhance the leading position of the Group in the construction of the national modern water network, and build a leading and industry-leading integrated service provider for the whole life cycle of water resources in China.

Investor

Does the growth of the company's financial expenses mainly come from the expansion of the scale of interest-bearing liabilities, or from the changes of interest rates and exchange rates?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The increase in financial expenses of the Company was mainly due to the fact that the base of interest-bearing liabilities continued to expand with the distribution of investment, construction and operation assets, and heavy asset projects such as new energy, energy storage and water conservancy were in the period of centralized investment, which was the growth of financing scale associated with strategic investment.

From the perspective of financing interest rate, the financing interest rate range of bonds issued by companies in the open market in 2026 (including corporate bonds, corporate bonds and debt financing instruments of non-financial enterprises) is 1.34%-2.04%, which is much lower than 1.49%-2.35% in 2025. From the exchange rate point of view, with the growth of overseas revenue and the increase of proportion, the fluctuation of financial costs will increase in the short term.

Investor

How does the company plan to seize the construction opportunity of six nets and increase its performance?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The company actively implements the national "six networks" construction strategy, based on the company's development foundation and reality, intends to focus on the four areas of national water network, new power grid, computing power network and urban underground pipeline network for key business layout, and is currently carrying out top-level design work in related fields, which will give full play to its inherent advantages, strengthen overall coordination, optimize business layout and strengthen innovation.

On the basis of steadily expanding the basic business of water network and power grid, we should cultivate new core competitiveness in the field of computing power network and urban underground pipeline network, and contribute to the construction of "six networks".

Investor

Hello, Secretary Qin Dong! As an investor who focuses on the relevant fields of your industry, the recent market generally expects that the approval and bidding of nuclear power projects will be gradually released during the "15th Five-Year Plan" period. China Nengjian has a higher share in the field of nuclear power conventional island design and construction in China. Is it convenient to disclose which key projects the company is tracking? Thank you!

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! In the field of nuclear power, the technical barriers are high and the competition pattern is relatively stable. In 2025, 5 projects and 10 units will be approved, and in 2026, 4 projects and 8 units will be approved. It is expected that the development trend of the 14th Five-Year Plan will continue during the 15th Five-Year Plan period. The company has strong advantages in the field of nuclear power conventional island design and construction, and has made great breakthroughs in the field of nuclear island construction.

At present, it actively tracks the design and construction bidding of approved projects.

Investor

The controlling shareholder has a record of increasing its holdings of a shares before, does the group have any plans to increase its holdings of Hong Kong 03996? Will H shares be included in the range of options?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The company attaches great importance to the management of market value, continuously focuses on the core business of energy, electricity and water conservancy to improve the quality and efficiency of operation, promotes the implementation of the special action of "improving quality, increasing efficiency and emphasizing returns", and strives to promote the dynamic balance between the intrinsic value of enterprises and the price of capital market.

The company will take relevant measures according to the fluctuation of the capital market, and if there are any arrangements such as increasing holdings, the company will make timely announcements in accordance with the requirements of the information disclosure rules.

Investor

Hello, leader! I come from the big decision of Sichuan. I would like to ask that the company has the ability to integrate energy planning, design, investment and construction, and new energy, energy storage and hydrogen energy are the key growth sectors. I would like to ask about the transformation rhythm of new contracts signed by Fengguang Base, Offshore Wind Power, Energy Storage and Hydrogen Energy, and the changing trend of profitability?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! In terms of the transformation rhythm of newly signed orders, the EPC contract of energy storage business, from signing to confirming revenue, mainly includes one-time confirmation after completion and acceptance and step-by-step confirmation according to the progress of the project. The EPC contract of hydrogen energy business is divided into two parts: power supply and chemical industry, which are mutually restricted and related in construction sequence. After the contract is signed, the commencement time of sub-projects varies according to the project situation.

After entering the bidding process, the wind and solar base project is still a large-scale wind and solar new energy project in essence. After the contract is signed, the order conversion rate is higher and the project repayment is better. Offshore wind power projects are in the stage of development from offshore to deep sea, the overall project planning cycle is longer, the technical threshold is constantly improving, and the conversion cycle is correspondingly longer.

Investor

At present, the company's dividend is an annual dividend, and H shareholders expect a stable return. Does the management consider introducing interim dividends or further raising the dividend ratio to stabilize the dividend expectations of Hong Kong stocks? Will the dividend policy distinguish between a shares and H shares?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company. The Company attaches great importance to the return to investors, and will continue to optimize the shareholder return mechanism, balance the current return and long-term development, and share the company's development achievements with all shareholders. The dividend policy does not distinguish between a shares and H shares.

Investor

In the first three quarters, the amount of new energy and integrated smart energy contracts signed by your company decreased by about 28% compared with the same period last year, but the energy storage and power computing collaborative demonstration projects are accelerating commercialization. To expand related business in the future, the company will focus more on independent integration, or strengthen cooperation with energy storage technology and computing power operation enterprises.

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! In the future, the company will expand energy storage, power computing and other businesses, and will adhere to scenario traction, focus on the main business, and open cooperation. Firstly, we should adhere to scenario integration, strengthen cooperation with leading enterprises in energy storage and computing power operation in the field of subdivision, enhance the adaptability of schemes and promote commercialization.

Second, based on the core advantages of power computing synergy and energy storage technology, leading the strong chain to complement the chain, extending the upstream and downstream business, expanding related business, and expanding market share. Thirdly, in view of the frontier technology, we should strengthen cooperation with relevant enterprises and follow up the introduction of new technologies.

Investor

1. Based on the operation of the Company in the early stage of the project, please explain whether there is a clear new project or investment plan in the future; if so, please introduce the project type, estimated investment, implementation rhythm, and the potential improvement path for ROE and shareholder returns. 2. The management is requested to explain whether there is a plan to increase the dividend ratio in the company's future cash dividend policy, and to introduce the medium and long-term dividend considerations, room for improvement and major constraints.

3. Will the company consider implementing repurchase and cancellation in the Hong Kong stock market? If so, please describe the trigger conditions, authorization arrangements, funding sources, and the impact on earnings per share and shareholder returns.

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company. For details of the Company's investment plan for 2026, please refer to the Company's annual report for 2025. The Company attaches great importance to the return to investors, and will continue to optimize the shareholder return mechanism, balance the current return and long-term development, and share the company's development achievements with all shareholders.

The company attaches great importance to the management of market value, continuously focuses on the core business of energy, electricity and water conservancy to improve the quality and efficiency of operation, promotes the implementation of the special action of "improving quality, increasing efficiency and emphasizing returns", and strives to promote the dynamic balance between the intrinsic value of enterprises and the price of capital market. The company will take relevant measures according to the fluctuation of the capital market.

If there are arrangements such as repurchase, the company will make timely announcements in accordance with the requirements of the information disclosure rules.

Investor

The company speeds up the cultivation and expansion of new businesses, and the second growth curve is also taking shape. How to plan company's main business pattern in the future and what kind of picture will it present?

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Thank you for your interest in the company! The company is speeding up the promotion of the "Fifteenth Five-Year Plan" and will clarify the business layout during the "Fifteenth Five-Year Plan" period in the plan.

Qin TianmingBoard Secretary, CHINA ENERGY ENGINEERING CORPORATION

Dear investors, Due to time constraints, that's all for today's presentation. Thank you for your concern and support for the company! I wish you all success in your work and prosperity!

ModeratorSSE Roadshow Center

Dear investors and netizens, the third quarter performance presentation of China Nengjian 2026 is drawing to a close. We invite guests from listed companies to make concluding remarks.

ModeratorSSE Roadshow Center

This is the successful conclusion of the third quarter performance presentation of China Nengjian 2026. Thank you for the active participation of investors and netizens. If you have further questions, you can keep communicating with the company through the e interactive platform of Shanghai Stock Exchange. Thank you!

Other China Energy Engineering earnings calls

  • Q2 2026 earnings call

    Management framed H1 as temporarily pressured by construction-sector contraction but emphasized structural optimization and long-term energy infrastructure demand.

    Sep 22, 2026Mildly positive0.25
  • written Q&A, April 15, 2026

    Management framed the year as a deliberate shift toward higher-quality energy, power and water-conservancy work, with strategic growth opportunities but no quantified outlook.

    Apr 15, 2026Mildly positive0.35
  • Q3 2025 earnings call

    Management framed the quarter as steady, structurally improving growth and said results support the 2025 annual target.

    Nov 26, 2025Positive0.55
  • Q2 2025 earnings call

    Management framed the half as steady progress in its energy-construction strategy, with overseas energy contracts and civil blasting growth singled out as bright spots.