Management framed the quarter as evidence that its shift toward higher-margin work is gaining traction, while legacy projects and delayed starts still cloud results.
- $340M$340M+ in delayed western water projects have started and are expected to ramp through year-end.
- $7M$7M unfavorable legacy bridge adjustment showed that old projects can still disrupt transportation margins.
- Management expects demand to remain strong into 2026 and prioritized margin improvement over revenue growth.
Guidance
- $9.5M~$9.5 million per quarter interest expense going forward
- 20%20%–24% effective tax rate, subject to tax credits and state and local adjustments
- Mid-teens civil margins over the longer term
- Low-teens transportation margins expected in the near future
- 41%Approximately 41% of backlog expected to burn over the next 12 months
- M&P projects substantially complete by end of 2025, with three projects finishing in first half 2026
- Operating cash flow expected to pick up in Q3 and Q4
What analysts pressed on
- 01Project timing: management sees opportunities in both the second half and 2026, but will prioritize margins and fit over revenue growth.
- 02Civil margins: management expects mid-teens margins longer term, with delayed projects ramping in the second half.
- 03Cash flow: management expects a normal seasonal pickup in Q3 and Q4 but did not quantify operating cash flow.
- 04Legacy claims: management reported small settlement progress, no major updates on larger claims, and expects positive cash flow in coming quarters.
- 05IIJA funding: management said less than 50% has been spent and expects reauthorization, but gave no company-specific exposure breakdown.
- 06Revenue recovery: management expects normalization in the second half but declined to break out weather impacts by segment.
Notable disclosures
- 50%Less than 50% of IIJA funding has been spent, with management citing design and permitting lags before construction awards.
- 80%Approximately 80% of critical-path work is self-performed, and Southland manufactures some tunnel boring machine components.
- Civil backlog conversion was described as consistent, with an expected slight uptick as delayed projects ramp.
- Management said performance over the next five years should differ significantly from the preceding few years.
Risks raised
- A $7 million unfavorable adjustment on a legacy Midwest bridge project weighed on transportation results; completion is expected later this year.
- Large unresolved legacy claims remain unsettled, with no major update on larger claims this quarter.
- Wet weather in the South affected operations, and delayed starts reduced quarterly revenue.
- Interest expense rose due to real estate-related costs, higher borrowing rates, and deferred financing costs.
Tone: Positive 0.55
Management was optimistic about margin recovery and infrastructure demand, but acknowledged lingering legacy claims, project timing delays, and weather-related pressure.
Who spoke
Company
- Alex MurrayVice President of Corporate Development and Investor Relations
- Frank RendaPresident and Chief Executive Officer
- Keith BassanoChief Financial Officer
Analysts
- Unidentified AnalystAnalyst, Thompson Davis
- Julio RomeroAnalyst, Sidoti
Full transcript
Analyst questions are marked with a bar. Timestamps are into the recording.
Prepared remarks
Good morning, my name is Tina and I will be a conference operator today. At this time I would like to welcome everyone to the Southland Second Quarter 2025 earnings conference call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and add to session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press the pound key.
Alex MurrayVice President of Corporate Development and Investor Relations
Thank you, Alex. You might begin your conference. Good morning, everyone, and welcome to the Southland Second Quarter 2025 conference call. This is Alex Murray, Vice President of Corporate Development and Investor Relations.
Joining me today are Frank Brenda, President and Chief Executive Officer, and Keith Bassano, Chief Financial Officer. Before I begin, I'd like to remind everyone that this conference call may contain board-looking statements within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934, and the Private Securities Litigation Reform Act of 1995.
Forward-looking statements are neither historical facts nor assurances of future performance. Forward-looking statements are uncertain and outside of Southland's control.
Southland's actual results and financial conditions may differ materially from those projected in forward-looking statements. Therefore, you should not rely on any of these forward-looking statements, but we do not undertake any duty to update these statements.
For discussion of some of the risks that could affect results, we see the risk factor exception of Form 10K for the year end of December 31st, 2024, that was filed with the SEC on March 5th, 2025, and discussion on Form 10Q for the quarter end of June 30th, 2025, that was filed with the SEC last night.
We also refer to non-GAP financial measures, and you will find reconciliation in the press release relating to this conference call, which can be found on the investor relations page of our website.
With that, I will now turn the call over to Frank.
Frank RendaPresident and Chief Executive Officer
Thank you, Alex. Good morning, and thank you for joining Southland's second-quarter 2025 conference call. I want to take a moment to acknowledge some recent operational accomplishments across North America. In Florida, we celebrated a significant milestone with the opening of the U. S. One Jupiter Federal Bridge, a project that will improve transportation for the region. We also successfully started driving the first 60-inch piles for the Shen's Bridge project, a critical step forward on the new bridge over the St. John's River.
In Toronto, our team successfully flooded the Ash Bridges Bay Outfall Tunnel, a major achievement that marks the nearing completion of this multi-year large-scale project.
Finally, our work with the Army Corps of Engineers continues to progress, as our teams have now installed the first gates on the center hill and Woof Creek Dam Gate replacement projects in Tennessee and Kentucky.
These achievements are a testament to the hard work and dedication of our employees, who are the driving force of our company. Thank you to all our teams for their unwavering commitment to safety and operational excellence.
Now to discuss our quarterly results. We reported second quarter revenue of $215 million and gross profit at $13.4 million. Consolidated gross profit margin was 6.2%, an increase from negative 15.9% in the prior year period. The improvement was driven by strong performance in our new core work and less impacts from legacy projects in this quarter versus the same quarter last year.
Our teams performed well this quarter despite unfavorable conditions, including adverse weather. It is encouraging to see the strong consistent results in our core business, as evidenced by our civil segment, which delivered a gross profit margin of 18%. This is a direct result of our discipline bidding strategy and our teams expertise in executing complex high value projects. Revenue for the quarter was lower than anticipated due to impacts from weather and timing on new project starts.
We had two water resource projects in the West, totaling over $340 million in combined contract value. That experienced delayed starts that were outside of our control. Both projects have now started and we expect them to ramp as we progress through the end of the year.
During the quarter, we added approximately $67 million in new awards. This was led by the McNeil Tunnel Project in Austin, Texas, bringing our total backlog to approximately $2.32 billion.
We are excited about the success we are having in converting high margin, short duration projects to backlog. We continue to be excited about the opportunities bidding in both segments and the back half of this year. So far in the third quarter, we have executed a $77 million contract and our transportation segment for a bridge rehab project for a private client in the Pacific Northwest.
We also have been awarded or are the low bidder on an additional $65 million of new projects that we are finalizing contracts on which we expect to convert to backlog in the third quarter.
Our outlook on the market remains unchanged. We're confident that sustained investment and robust demand for infrastructure, especially from federal and state governments will serve as a powerful tailwind for our business for years to come.
The IIJA is in full swing and continues to be a major catalyst for our industry. We're seeing robust demand driven by this federal funding. The current federal infrastructure cycle will expire in 2026, but we believe this funding will provide a strong tailwind for our business for several more years as it takes time for projects to work through design, permitting, and ultimately construction.
We're also optimistic that there will be bipartisan support to reauthorize spending to address the nation's critical infrastructure needs. State and local spending is strong in our key markets across the Sun Belt. We're also seeing state and local governments developing long-term plans to meet the demand caused by population shifts and aging infrastructure. In May, the Texas Senate passed House Joint Resolution 7, which has passed in November by voters will unleash $20 billion for water infrastructure development projects across the state over the next two decades.
This is a significant investment in one of our core markets. We are well positioned to help rebuild and expand Texas's water resources. This is just one of the many examples of the strong demand for our services, which we expect to continue for the foreseeable future. With the strong pipeline of opportunities from private and public clients, we have excellent visibility into future demands.
We continue to be selective in our approach focusing on improving profitability over top-line growth. We are excited about upcoming opportunities and have pending proposals, including the Pier 31 extension at the Naval Submarine Base in Groton, Connecticut, for the Naval Facilities Engineering Command. We also expect to propose on the Eleuthera Glass Window Bridge in the Bahamas in Phase 3 of the Winnipeg North End Sewage Treatment Plant.
We are currently constructing Phase 1 of the program, and are in the pre-construction phase of Phase 2 of the program. We also expect to propose on the Alcassan, Ohio River Tunnel, and numerous water resource projects across the Sun Belt.
In closing, our teams performed well in the quarter, despite some challenging conditions. We continue to make good progress winding down legacy work and are excited about the opportunities in all our end markets.
While we are operating in an environment of strong market tailwinds, we are also aware of the challenges in our business. Our strategy is clear. Focus on high quality, high margin work, proactively manage our cost structure, and maintain strong financial discipline. Our improved margins this year are a clear sign that this strategy is working. We are confident in our ability to continue to convert our new core backlog into profitable results and create long-term value for our stakeholders.
We remain excited about our future and the strong market position we have built. With that, I'll now turn the call over to Keith for a financial update.
Keith BassanoChief Financial Officer
Thank you, Frank. Good morning, everyone. I'll discuss an overview of our financial performance during the second quarter for 2025. You can find additional details and information in the financial statements, footnotes, and management's discussion and analysis that were filed on Form 10Q last night.
Revenue for the quarter was 215 million down 36 million from the same period in 2024. Rose profit was 13.4 million and increase of 53 million from the same period in 2024. Rose profit margin in the quarter was 6.2% compared to negative 15.9% in the prior year.
Selling general and administrative costs in the second quarter were 13.6 million, a decrease of 2.1 million compared to the same period in 2024. The decrease was primarily due to lower pre-construction expenses compared to the same period in 2024.
Interest expense for the quarter totaled 10 million, up 3.3 million from the prior year. This increase was primarily driven by an increase in interest expense related to a real estate transaction that closed in the second half of last year. Increased interest rates on borrowings and increased deferred financing costs.
We anticipate interest expense to average approximately 9.5 million per quarter going forward. Income tax benefit was 0.1 million for the quarter or an effective tax rate of 0.6% compared to income tax benefit of 16 million in the same period last year. We expect our effective tax rate to be in the 20 to 24% range subject to the impact of tax credits on the doctoral expenses and state and local tax adjustments.
We reported a net loss of 10.3 million or a net loss of 19 cents per share in the quarter compared to a net loss of 46 million or a net loss of 96 cents per share in the same period last year.
In the second quarter, we produced EBITDA of 4.2 million compared to EBITDA of negative 49.9 million for the same period in 2024.
Now the touch on segment performance for the quarter. Our civil segment had revenues of 81.5 million compared to revenue of 79.4 million in the same period in 2024. Our civil segment gross profit was 14.6 million an increase of 5.4 million from the same period in the prior year.
As a percentage of revenue for the quarter, our civil segment had gross profit margin of 17.9% compared to 11.5% in the same period in 2024.
For the quarter, our transportation segment had revenues of 133.9 million to decrease of 38.3 million from the same period in 2024. Our transportation segment had a gross loss of 1.2 million an increase from a gross loss of 49.2 million in the same period in the prior year.
As a percentage of revenue for the quarter, our transportation segment had a negative gross profit margin of 0.9% compared to a negative gross profit margin of 28.6% for the same period in 2024.
The materials and paving business line contributed 21.7 million to revenue and 3.8 million in gross loss in the second quarter. At the end of the quarter, we had approximately 99 million of remaining MMP backlog. This is down from 139 million at the end of last quarter. We anticipate to be substantially complete with these projects by the end of 2025 with three projects final completion tailing into 2026.
Our transportation segment margin was negatively impacted in the quarter by an unfavorable adjustment of $7 million on a legacy bridge project in the Midwest. This legacy project had significantly impacted our results over the past several years, and we are now down to the final remaining contract items on the project. The new bridge opened earlier this year and demolition of the old bridge is well underway.
This project is expected to be completed later this year. Our remaining non-MMP legacy backlog is now 40 million down from 59 million last quarter, excluding the impacts of MMP and unfavorable adjustments in our non-MMP legacy backlog. Gross profit in the quarter and both transportation and civil segments produce double-digit margins. We expect legacy projects to have less of an impact on the overall results as we continue to wind down these projects.
This ongoing transition to a more profitable backlog is a key part of our long-term strategy and a major driver of our improved margin profile. We finished the quarter with approximately 2.3 billion of backlog, of which we expect to burn approximately 41% over the next 12 months. Thank you for your time and interest in Southland. I'll now pass the call back to the operator for questions.
Questions and answers
As a reminder, to ask a question, simply press star one on your telephone keypad. And our first question comes from the line of Karen Kevin Ganey with Thompson Davis. Please go ahead.
Unidentified AnalystAnalyst, Thompson Davis
Good morning, Frank. Keith, Alex, it's Kevin on for Alex, or Kevin on for Adam.
Frank RendaPresident and Chief Executive Officer
Hey, good morning, Kevin.
Unidentified AnalystAnalyst, Thompson Davis
Good morning. Frank, I know you kind of highlighted two words that you guys closed in starting Q3 and then you rattle off a list of some opportunities in the future. I was wondering, with those opportunities, are they more second half-weighted or are they likely to come maybe 2026?
Frank RendaPresident and Chief Executive Officer
Yeah, we're excited about the second half. So there is a lot coming in the second half, but also in 2026. You know, overall the pipeline remains strong. We expect demand to remain strong, and while confident we can secure new projects across all of our markets, our main focus is on increasing margins, not just increasing revenue. We've really been focusing on cleaning up the legacy work and taking a measured approach to adding new work. So we want to make sure these projects fit us perfectly with all the right resources.
Unidentified AnalystAnalyst, Thompson Davis
That sounds good. And then civil margins, if you guys can maybe touch on how you feel that matron in the second half of the year, given the strong first half.
Frank RendaPresident and Chief Executive Officer
So civil margins have been strong, and we're excited about how our teams are performing here. The teams did well this quarter and longer term might expect civil margins to be in the mid-teens. We have a great deal of confidence in both civil and transportation segments. We see internally on a job-by-job basis how our new core projects are performing in the strong margins in our backlog.
Some large unexpected swings from disputes and older projects have overshadowed these results, and it's take a little bit more time, Kevin, for these new projects to have a meaningful impact. But we're excited about the long-term potential of both businesses.
Unidentified AnalystAnalyst, Thompson Davis
I'd like to sound of that. And then just a quick one on cash flow. What are you guys thinking for operating cash flow in the back half? And is there any chance that could swing positive P3, Q4?
Frank RendaPresident and Chief Executive Officer
Yes. So speaking of cash flow, so we had a use of operating cash flow here in the quarter, but we do expect that to pick up in Q3 and Q4, just normal cadence and we're in construction season right now.
Unidentified AnalystAnalyst, Thompson Davis
Perfect. I'm good, guys. I'll hop back in the queue.
Frank RendaPresident and Chief Executive Officer
Thanks, Kevin.
Thank you. And your next question comes from Beline of Christian's Walk with Craig Hallam. Please go ahead.
Unidentified AnalystAnalyst, Craig-Hallum
Thanks for taking my question. So my first question has to do with the commentary regarding the higher margin short duration work. Can you just elaborate on that a little bit further?
The increased opportunities that you're seeing there? And is that something that you expect to continue on a multi-year basis? Or are you just being opportunistic in the short term?
Frank RendaPresident and Chief Executive Officer
So we see a lot of opportunity in the civil market right now, Christian. There's tons of projects that are out there for us in core markets for owners that we've worked for in the past have great relationships with also on the CMR side. There are so many opportunities. So we see it as a near term opportunity.
We're going to continue to focus on those higher margin short duration and we also see this market, you know, this strong civil market continuing into next year and in years down the road as well.
Unidentified AnalystAnalyst, Craig-Hallum
Great. And then as far as, you know, we haven't discussed this in a while at least on conference calls, but now that we're getting finally near the done of the MMPI work and completion of that and a lot of business to win and the focus, as you said, on the greasy margins, not necessarily focused on driving substantial revenue growth.
You know, as we look to, you know, maybe beyond 26 as, you know, the three projects that trail off and, you know, what is a target, you know, operating margin range as large as you want to make it that you think the company can, you know, operate at that time frame.
Frank RendaPresident and Chief Executive Officer
You know, we haven't been in the public market for an extended period of time, Christian, but, you know, we've been doing this for a couple of decades now and we couldn't be excited about, more excited about the long term opportunities. You know, we look at some of the programs that are out there and the infrastructure need, you know, here and here in North America. And there's just so many opportunities for us to pick up really meaningful projects that will increase our margin. So we're going to stay, we're going to stay disciplined. What we've done and gone through the past couple of years really should set us up and is going to set us up for long-term success.
So we have the right crews available. We have, you know, tailwinds in our business and really expect to increase our margins, you know, and hopefully those mid-team civil margins and, you know, low-team transportation margins will be out there in the near future for us.
Unidentified AnalystAnalyst, Craig-Hallum
Fantastic. And then my last question, you know, can you give us an update and, you know, potential timing or resolution in some form or fashion, you know, of, you know, the massive amount of unresolved contracts that are at dispute?
Frank RendaPresident and Chief Executive Officer
Yeah, so we continue to work through and make small progress on settling legacy claims. No major updates this quarter on larger claims. We continue to work vigorously to collect every dollar that we are owed and expect positive cash flow from these claims in the coming quarters. You know, it's important that we remember most of this work, you know, was picked up in that 2017-18-19 time frame. So, you know, we're a year closer now than we were at last quarter at this time and, you know, getting some of the, getting some of the owners to the table so it can't, yeah, can't go on, go on forever and we're going to continue to fight for every dollar that we've earned and had to finance, you know, so many of these these projects, self-financed so many of these projects that the owners are reaping the benefit from.
Unidentified AnalystAnalyst, Craig-Hallum
Great. Thank you.
No other questions.
Frank RendaPresident and Chief Executive Officer
Thanks, Ricky.
Unidentified AnalystAnalyst
Yeah.
And your next question comes from the line of a Julio Romero with Cidodian Company.
Julio RomeroAnalyst, Sidoti
Thanks. Morning, Frank. Keith.
Frank RendaPresident and Chief Executive Officer
Good morning, Julio.
Julio RomeroAnalyst, Sidoti
Hey, Frank. My ears parked up a little bit when I heard you mention civil, civil segments, expertise on executing complex, high value projects. Can you give us a refresher of Southland's value problem with regards to complexity and handling complexity and what you guys bring to the table?
Frank RendaPresident and Chief Executive Officer
Absolutely. You know, I think we're a very unique company, you know, in the civil market. We can do all aspects really of heavy civil work. We do the underground, we do the tunnels, water and wastewater treatment plants, all types of the rainworks and, you know, we pride ourselves on cross training, you know, our employees. So we have an expertise that not many people do of our size, where we self-perform about 80% of the critical path work and take on some really challenging projects. Another thing that we do is, you know, we'll manufacture some of our own 2D ends, and there's not a lot of companies around that have the manufacturing capabilities that we do, so it gives us some real competitive advantages.
And I think that's why you see us in so many one or two-bit situations on these civil projects. And those are tunnel boring machines.
Julio RomeroAnalyst, Sidoti
Helpful, and thanks for the clarification on the acronym there. Historically, you guys have been about 80% tied to public spending in terms of the projects you target. You know, have you seen any change in the pace of awards on the public side? And you mentioned IIJ funding. How much runway do you think is left for projects you would target that would have IIJ funding and kind of help us think about Southland's exposure to federal versus state and local and other funding sources?
Frank RendaPresident and Chief Executive Officer
Yeah, so, so first on the IIJ question, you know, I think we've seen less than 50% of the IIJ money has been spent to this point. You know, we kind of mentioned the prepared remarks. It really takes some time for these projects to work through the design and permitting before people like us, you know, the contractors get involved. We're optimistic that this funding will be reauthorized next year. We mentioned the resolution in Texas, which would deploy another $20 billion to address just the state's water needs.
So we're seeing states trying to prepare for this spend in addition to the federal money. Our country has neglected our infrastructure, you know, a bit for decades. You can look at the different end markets we're in and the stats are just incredible. Roughly 7% of the nation's 623 bridges are more conditioned. The dams in our country have an average of close to 60 years old and nearly 17,000 dams in the country are considered high hazard potential. Maybe there's a likelihood of harm to residents if the dams were to fail.
You can see stats like this across different infrastructure in markets and they're really hard to believe. So the bottom line is we believe it's critical to the country's success that we improve the aging infrastructure. So we feel there will be sustained long term demand for what we do. And, you know, what we do is historically been 80 plus percent in the public market. We are going to continue to focus on the public market, but if, you know, private opportunities arise in the same type of work that we do, that could shift over time. So pretty good demand on the private side and really good demand on the public side right now in our market.
Julio RomeroAnalyst, Sidoti
Great context. The last one for me, if I may, is just on the civil segment. Given the shorter duration project focus of civil, should we still be looking at kind of a quarterly high single-digit backlog conversion run rate going forward?
Frank RendaPresident and Chief Executive Officer
So, you know, with the civil, I would, I guess, let me ask you this. Can you just clarify the backlog conversion?
Julio RomeroAnalyst, Sidoti
Yeah, I'm just dividing your sales figure by the backlog and back it into about nine percent for this quarter, eight and a half for the last quarter.
Frank RendaPresident and Chief Executive Officer
Oh, I'm looking at eight percent this quarter, eleven last quarter. Yeah, I think we're going to be pretty consistent there.
We're going to be pretty consistent there for civil. We did have a couple projects that encountered some impacts during the quarter, you know, outside of our control. We expect those to ramp up a little bit more as we get into the second half of the year. So, we could see a little bit of an uptick, but nothing too too significant.
Julio RomeroAnalyst, Sidoti
Really helpful. Thanks very much.
Thank you. And our final question comes from the line of John Belize with David Davidson.
Unidentified AnalystAnalyst, Davidson
Good morning. Thank you for the time.
Frank RendaPresident and Chief Executive Officer
Good morning. Good morning.
Unidentified AnalystAnalyst, Davidson
Could you perhaps provide more color on what the revenue impact was to each segment due to weather and just as a follow-up, are you expecting to revenue, catch up revenue more, have you more weighted on third quarter or do you expect it to just carry on more or less evenly to the second half?
Frank RendaPresident and Chief Executive Officer
Yeah, so let me speak to the revenue decrease here to store. So, as I mentioned, we did have those couple of delays, you know, not necessarily whether driven by those two, but those both have been since resolved. You know, we do anticipate revenue to normalize in the back half of the year. You know, again, we're in peak construction season, so we anticipate, you know, certainly a pickup over where we were in Q2. You know, we really don't disclose as far as weather impacts, you know, by segment.
You know, that said, you know, weather in the south has been, you know, wet for us and we did see some impacts there to the business.
Unidentified AnalystAnalyst, Davidson
A problem, thank you. And then just following on the questions on several, so just basically commentary we should continue to suspect at least about mid-teens, margin for full year 2025. Is that how my range is right?
Frank RendaPresident and Chief Executive Officer
Yeah, so we see, so we've demonstrated, you know, there's mid-teen markets or mid-teen margins here over the last couple of quarters and as did any impacts from the legacy civil work, we expect to see that going forward.
Unidentified AnalystAnalyst, Davidson
No problem. And then just, well, the last one for me. Just focusing now just on transportation, you were regarding the materials and, I guess just focusing on materials and taping.
Is there a possibility of just catching up in the second half of 2025 a little faster or do expect to just stick to the guidance of what you provide early on?
Frank RendaPresident and Chief Executive Officer
So on, you know, on M&P, we're down to just a handful of M&P projects left, which we expect to be substantially complete by the end of the year. Add some projects, final completion, state, slip, just a bit, and expect three projects to completely wrap up in the first half of the next year. But the impact overall results continue to get smaller each quarter. You know, if you look at, you know, legacy burns, the end of last year, we had 246 million total legacy backlog.
And we're down to 139 million at the end of this quarter. So we worked down approximately 107 million. So far through the first two quarters. We're making good progress, but it will just take some time before this is completely behind us and we'll get it closer every day. We expect most of this to burn off again in the next two quarters with a couple tailing in the next year.
Unidentified AnalystAnalyst, Davidson
Yeah, I appreciate that commentary. Thank you so much for your time.
Frank RendaPresident and Chief Executive Officer
Thank you, John.
Thank you. And with no further questions in queue, I will hand the call back to Frank Rinda for closing remarks.
Frank RendaPresident and Chief Executive Officer
I appreciate everybody joining, you know, the last couple of years have been challenging and we're doing the right things to set the company up for success in the long term. We haven't been a public company for very long, but we have been doing construction for a long time. Things are trending in the right direction and we believe the company's performance over the next five years will be significantly different from what we've seen in the past few. Appreciate your support and look forward to talking to you next quarter. Thanks, everyone.
Thank you again for joining us today. This does conclude today's conference call. You may now disconnect.
Other Southland Holdings earnings calls
- Q2 2026 earnings call
Management framed the completed surety and credit agreements as the runway to finish bonded work, resume bidding and shrink the legacy portfolio.
Aug 13, 2026Mildly positive0.35 - Q1 2026 earnings call
Management framed the quarter as a transition: surety support is funding execution while legacy work winds down and financing details remain unfinished.
May 13, 2026Mildly positive0.25 - Q4 2025 earnings call
Management framed 2025 as a legacy-project reset, emphasizing surety-backed liquidity and asset sales while acknowledging disappointing results and a shift toward core work.
Mar 27, 2026Cautious-0.35 - Q3 2025 earnings call
Management framed 2025 as a reset year, with core work performing well but legacy projects still weighing on margins and cash conversion.
Nov 13, 2025Mildly positive0.22 - Q1 2025 earnings call
Management framed the quarter as evidence of stronger core execution while legacy paving work and uncertain claim timing continue to cloud reported results.
May 14, 2025Positive0.55 - Q4 2024 earnings call
Management framed 2024 as a legacy-work reset, with core projects performing well and awards expected to pick up later in 2025.
Mar 05, 2025Mildly positive0.35 - Q3 2024 earnings call
Management framed the quarter as legacy-driven and largely non-cash, while emphasizing new-core execution, stronger liquidity, and a return to profitability in 2025.
Nov 13, 2024Mildly positive0.20
Done reading? Open Southland Holdings with the chart, filings, and estimates next to this call.
About this transcript
The summary, guidance, analyst focus, and tone are automated and should be checked against the call before being relied on. Names and figures can be misheard. Listen to the replay.