Sterling Infrastructure (STRL) Q3 2026 earnings call transcript

Transcript, summary, guidance, and what analysts pressed on from the Sterling Infrastructure, Inc. call on October 29, 2026.

FreeSee Sterling Infrastructure's financials in GloomOpen in browser →Jump to the transcript
Held
October 29, 2026
Length
1 h
Tone
Confident0.88
Analysts
5
Words
8,732
2026 revenue guidance
$4.63 billion to $4.73 billionraised
2026 diluted EPS guidance
$19.16 to $19.42raised
2026 CapEx
approximately $140 million
Total scoped work
nearly $8 billionup approximately 90% year over year
E-infrastructure scoped work
approaches $7 billionup more than 130% year over year
CEC 2026 margin drag
approximately 160 basis pointslegacy non-core operations
Annual organic profitability growth
20% to 30%over the next several years
Annual earnings growth aspiration
approximately 50%with acquisitions

Summary

Management framed the quarter as evidence of a multi-year infrastructure investment cycle, with capacity—not demand—the central constraint.

  • $8BNearly $8 billion of scoped work includes signed backlog, unsigned awards, and designed next phases, but excludes more than five years of campus development potential.
  • 150 bpsCEC growth exceeded initial expectations; management said core margins have improved over 150 basis points and remain ahead of the 300-to-500-basis-point commitment.
  • Management expects 2027 to beat or exceed its organic profitability growth framework, while describing acquisition-driven growth as less certain.

Guidance

  • $4.63B2026 revenue $4.63 billion to $4.73 billion
  • $19.162026 diluted EPS $19.16 to $19.42
  • $140M2026 CapEx approximately $140 million
  • 20%Annual organic profitability growth 20% to 30% over the next several years
  • 50%Annual earnings growth approximately 50% with acquisitions
  • 20%2027 organic growth expected to beat or exceed the 20% to 30% framework

What analysts pressed on

  • 01Margin trajectory: management cited Q4 seasonality and conservative weather assumptions, while expecting site civil and electrical margins to improve individually.
  • 02Unsigned awards: projects remain on schedule for Q4 and Q1 awards, but management cautioned timing depends on permitting and final negotiations.
  • 03Power and permitting: management said active campuses are powered and permitted, while acknowledging uncertainty around some Texas water permits.
  • 04Capacity: roughly 80 electricians are being hired weekly in Texas, with acquisitions, prefab modules, leasing, and rentals supporting expansion.
  • 05Geographic margins: new regions are below established-market margins, but management expects vertical integration over a 24 to 36-month runway.
  • 06CEC growth: management expects strong 2027 growth but declined to quantify a growth rate, citing capacity and labor availability.

Notable disclosures

  • 150 bpsMore than 150 basis points of CEC core margin improvement has already been achieved, ahead of the original 300-to-500-basis-point target timeline.
  • $8BNearly $8 billion of scoped work excludes permitted and powered campus land representing more than five years of additional work.
  • 160 bpsRoughly 160 basis points of CEC's full-year 2026 margin is expected to be obscured by legacy non-core operations.
  • Management said early campus phases carry lower margins, with later phases and vertical integration creating separate margin expansion opportunities.

Risks raised

  • Q4 weather and holiday-related crew reductions could constrain activity compared with unusually mild winter conditions in 2025.
  • Texas water-permit review uncertainty could delay project starts, although management reported no customer cancellations or strategy changes.
  • Electrician availability and limited operating capacity may prevent Sterling from capturing all available Texas opportunities.
  • Residential softness is expected to persist through the balance of 2026 and into 2027.
  • Legacy CEC operations are expected to remain a margin drag until their planned wind-down is complete by year-end 2027.

Tone: Confident 0.88

Management emphasized accelerating demand, expanding project visibility, margin improvement, and confidence in another record year, while acknowledging capacity and execution constraints.

Who spoke

Company

  • Noelle DillsVice President, Investor Relations and Corporate Strategy
  • Joseph CutilloChief Executive Officer
  • Daniel GovinChief Operating Officer
  • Nicholas GrindstaffChief Financial Officer

Analysts

  • Manish SomaiyaAnalyst, Cantor Fitzgerald
  • Brent Edward ThielmanAnalyst, Oppenheimer
  • Unidentified AnalystAnalyst, D. A. Davidson & Co.
  • Adam ThalhimerAnalyst, Thompson Davis
  • Julio RomeroAnalyst, CDT Company

Full transcript

Analyst questions are marked with a bar. Timestamps are into the recording.

Prepared remarks

00:00

Good morning, ladies and gentlemen, and welcome to the Sterling Infrastructure Third Quarter Webcast and Conference Call. At this time, online is in a listen-only mode. Following the presentation, we will conduct a question-and-answer session. If at any time you're in this call to require immediate assistance, please press star zero for the operator. As a reminder, this call is being recorded on Thursday, October 29, 2026.

00:25

Noelle DillsVice President, Investor Relations and Corporate Strategy

I would like to turn the conference over to Noelle Dills, Vice President, Investor Relations and Corporate Strategy. Please go ahead.

Good morning, and welcome to Sterling Infrastructure's third quarter, 2026 earnings conference call and webcast. I'm pleased to be here today to discuss our results with Joe Cotillo, Sterling's Chief Executive Officer, Nick Grindstaff, Sterling's Chief Financial Officer, and Dan Govan, Sterling's Chief Operating Officer. As a reminder, accompanying slides are available in the Investor Relations section of our website and include additional information regarding our full year 2026 financial guidance.

Our discussion today may include forward-looking statements. Actual results could differ materially from the statements made today. Please refer to Sterling's most recent 10-K and 10-Q filings for a more complete description of risk factors that could affect these projections and assumptions. The company assumes no obligation to update forward-looking statements as a result of new information, future events, or otherwise.

Please note that management may reference certain historical forward-looking and non-GAAP financial measures. Reconciliations of these non-GAAP financial measures to their most directly comparable GAAP financial measures are included in our earnings release and posted in the Investor Relations section of our website. Please refer to the press release for additional information regarding our forward-looking statements and non-GAAP financial measures.

Throughout today's discussion, all third quarter 2026 comparisons are to the third quarter of 2025, unless otherwise noted. I'll now turn the call over to our CEO, Joe Cotillo.

02:04

Joseph CutilloChief Executive Officer

Thanks, Noel, and good morning, everyone. Sterling delivered another outstanding quarter. His adjusted diluted EPS grew 118% to reach $7.58. Revenue increased 127%, and adjusted EBITDA more than doubled. On top of this, our visibility continues to expand. Our total scoped work, which includes signed backlog, unsigned awards, and the next phases being designed on our current projects, now totals nearly $8 billion, up approximately 90% year over year.

These results demonstrate the strength of our market, the great execution of our teams, and the continued success of our strategy. While the quarterly performance was exceptional, what's even more important is what these results tell us about the opportunity ahead. Throughout 2026, it has become increasingly clear to us that we are in the early stages of significant multi-year investment in large-scale mission-critical infrastructure across the U. S. Data centers remain a powerful growth driver, but the opportunity is much broader, spanning semiconductors, advanced manufacturing, energy infrastructure, and the broader build-out supporting the next generation of U. S. industrial growth.

The magnitude of this opportunity is driving us to think even bigger about how we position Sterling for long-term growth. We are focused on building the capacity, services, geographic reach, and customer relationships required to capture more share of this investment. Importantly, the $8 billion of scope work does not capture the full development potential of the campuses we are already working on today.

Many of these projects span hundreds or even thousands of acres and are being developed in multiple phases over several years. These are tangible opportunities backed by land, permits, and power commitments. and is on top of what we already have scoped. In total, these opportunities provide more than five years of additional work.

Sterling has never been in a better position. We have significant visibility into future growth, deep relationships with our customers, and the financial and operational resources to capitalize on the opportunities ahead. We are excited about Sterling's future and confident in our ability to compound strong, profitable growth for years to come. Now, I'd like to hand the call over to Dan to discuss our segment results in more detail. Dan?

05:16

Daniel GovinChief Operating Officer

Thanks, Joe. I'll begin with e-infrastructure solutions, where mission-critical demand, accelerating project activity, and outstanding execution drove another excellent quarter. Revenue increased 212% year-over-year, led by continued strength across data center and semiconductor campus projects. Within e-infrastructure, site development operations more than doubled revenue organically, with strong growth across each of our geographies. In the Southeast, customer demand remains robust, and projects continue to expand in acreage, number of phases, and complexity.

This trend plays directly to our strengths, allowing us to leverage our broad, self-performed capabilities and proven execution model. In the Northeast, we continue to make excellent progress on our large semiconductor campus and remain ahead of schedule. Our execution on this large-scale project is strengthening our position and reputation in the semiconductor market. Momentum is building in the Rocky Mountain region, where accelerating activity on recently awarded large projects fueled another quarter of exceptional growth.

Our teams are delivering strong execution and are successfully redeploying transportation resources to capitalize on the expanding mission-critical opportunities. Key customers are increasingly engaging us to support their capital plans in Texas, driving significant demand for our site development capabilities. Based on the opportunities we see today, we expect Texas to be a meaningful driver of growth over the next several years.

Turning to CEC, the electrical business delivered $426 million of revenue in the quarter, more than quadrupling its pro-forma full-quarter revenue in the third quarter of 2025. Accelerating work on major hyperscaler and large co-location projects drove growth. CEC is scaling rapidly and maintaining strong execution. Year-to-date growth has significantly exceeded our initial expectations, and we now believe full-year revenue could exceed $1 billion. This momentum is extending beyond 2026 as CEC continues to build high-quality, longer-duration backlog with established customers positioning the business for continued growth in 2027.

The strong demand and execution across both CEC and site development are translating to significant profit growth for the segment. In the quarter, e-infrastructure solutions adjusted operating income increased 171%, with adjusted operating margins of 23%. Margins declined year over year, reflecting the significantly higher revenue contribution from CEC, as it represented a third of the segment revenue in the quarter versus 10% in the prior year period.

Within the segment, site development operating margins remain strong at first half 2026 levels, even though several of our large mission-critical projects are still in the early stages of construction. Margins typically expand as these multi-phase campuses move into later construction phases over the coming months and years. CEC operating margins improve both year over year and sequentially, and we are encouraged by the margin improvement we are seeing in the core business.

As we have previously discussed, we are in the process of winding down some non-core business lines identified during diligence, a process we expect to complete by year-end 2027. We estimate that these non-core operations will be a drag of approximately 160 basis points on full-year 2026 CEC margins, masking the roughly equivalent improvement in the core business. At the time of the CEC acquisition, we committed to achieving 300 to 500 basis points of run rate margin improvement at CEC over 18 to 24 months. Progress in the core business and our planned exit from non-core work gives us confidence that we can deliver on this commitment.

Looking ahead, the opportunity in front of e-infrastructure continues to strengthen. In aggregate, our scoped work now approaches $7 billion, an increase of more than 130% year over year. The vast majority of these opportunities are tied to mission-critical work, providing substantial visibility into continued growth.

Turning to transportation solutions, revenue declined 3%, percent, reflecting the redeployment of resources from transportation into higher margin e-infrastructure work. This transition continues to accelerate as e-infrastructure activity builds in the Rocky Mountain and Texas regions. This was the second consecutive quarter in which our Rocky Mountain operation generated more revenue from e-infrastructure than transportation. Despite the lower revenue, Transportation Solutions' adjusted operating income grew 22%, and adjusted operating margins reached 19.7%. This demonstrates the discipline we are applying to project selection.

Transportation Solutions' backlog ended the quarter at $964 million, up 31% year-over-year, largely driven by the conversion of unsigned backlog to signed. On the combined backlog basis, the segment declined 22%, again reflecting the shift in resource allocation.

In building solutions, segment revenue declined 5% as home builder activity slowed and adjusted operating margin was 8%. We expect residential market conditions to remain under pressure through the balance of 2026 and into 2027. We are managing the business carefully through the current environment while positioning the business to capture more market share when conditions improve.

Stepping back, the quarter provides clear evidence of Sterling's strategy in action. We are benefiting from exceptional demand in our highest return markets, becoming more selective about where we are deploying our resources, and building the foundation for multi-year growth.

With that, I'd like to turn it over to Nick to give you more details on some of our financial metrics and 2026 guidance. Nick?

12:00

Nicholas GrindstaffChief Financial Officer

Thanks, Dan, and good morning. I'll begin with our cash flow and balance sheet. For the first nine months of 2026, cash flow from operating activities was $427 million, an increase of 68% compared with the prior year period. One item to note is the increase in accounts receivable at the end of the quarter.

Receivables were higher at the end of the quarter due to substantial growth in e-infrastructure activity combined with the timing of collections. However, we have already secured a major portion of these outstanding funds in early October, setting us up for robust operating cash flow in the fourth quarter. Investing activities resulted in a $276 million outflow, including $115 million of capital expenditures.

We now anticipate full-year CapEx of approximately $140 million. Financing activities resulted in a $325 million outflow year-to-date. On July 2nd, we closed on the extension and expansion of our revolving credit facilities to $1.5 billion and extended the maturity to July 2031. We used this facility in cash on hand to pay off our existing term loan. The expanded facility further strengthens our financial flexibility and provides additional capacity to support both organic growth and M&A.

Financing activities included share repurchases of $107 million. At quarter end, $267 million remained available under our existing repurchase authorization. We will continue to take an opportunistic and disciplined approach to share repurchases as part of our broader capital allocation strategy.

Turning to the balance sheet, we ended the quarter with $217 million of cash and debt of $95 million for a cash net of debt balance of $122 million.

Combined with our expanded revolving credit facility and strong cash generation, our balance sheet provides significant capacity to continue investing in the business and pursuing acquisitions. Moving to guidance, our performance through the first nine months and improved visibility into the fourth quarter give us greater confidence in our full-year outlook. We're raising our 2026 guidance ranges as follows. Revenue of $4.63 billion to $4.73 billion.

Diluted EPS of $19.16 to $19.42. adjusted diluted EPS of to EBITDA of million to million adjusted EBITDA of million to $981 million. Now, I will turn the call back to Joe.

15:22

Joseph CutilloChief Executive Officer

Thanks, Nick. The trends we've highlighted over the past several quarters have not only continued, they have accelerated. Projects are becoming larger, more technically complex, and longer in duration. Our execution continues to build trust and loyalty with our customers, and that is creating opportunities for Sterling to enter new markets, take on more responsibility, and have greater participation in our customers' long-term capital planning. The opportunity in front of us is larger than ever. Increasingly, the question is not whether the opportunity is there, but how quickly we can add capacity to capture.

We are investing in our people, equipment, and our capabilities while maintaining the execution discipline and focus on returns that have driven our success. As we look to the remainder of 2026, we are confident that we will deliver another record year. The midpoints of our revised guidance ranges would represent 88% revenue growth year-over-year, 101% adjusted EPS growth, and 94% adjusted EBITDA growth. Our guidance continues to assume a more pronounced weather impact in the fourth quarter than we experienced in 2025.

Stepping back, our multi-year growth strategy is built around two complementary drivers, strong organic growth and disciplined strategic acquisitions. We are targeting annual organic profitability growth of 20% to 30% over the next several years, with M&A providing an additional opportunity to accelerate that growth. Together, these drivers support an aspiration to grow earnings by approximately 50% per year. We believe 2027 is shaping up to be another year that beats or exceeds this organic framework.

On the acquisition front, we remain very active and encouraged by the quality of opportunities in the market. We will continue to pursue acquisitions that expand our capacity and geographic presence and enhance the value we can bring to our customers. Our strong balance sheet, significant cash generation, and disciplined approach to capital allocation give us the flexibility to fund organic growth and pursue strategic acquisitions, supporting our multi-year growth ambition. We're confident in Sterling's ability to deliver sustained, profitable growth and long-term value to our shareholders.

With that, I'd like to turn it over for questions.

Questions and answers

18:24

Thank you, sir. Ladies and gentlemen, we now begin the question and answer session. If you'd like to ask a question, please press star for number one on your telephone keypad. If your question has been answered, you'd like to withdraw from the queue, please press star for number two. And if you're using a speakerphone, please lift your hands up before pressing any keys. One moment, please, on the compiled raster. Your first question comes from Manish Sommeya with Cantor. Please go ahead.

18:51

Manish SomaiyaAnalyst, Cantor Fitzgerald

Good morning, gentlemen. Good morning, Noel. Joe, when I look at the margin guidance for the full year, it implies 19% or so in the fourth quarter. and clearly that's down from 21.6 that you had in 3Q. So I was just hoping if you can just help us bridge that. I know you talked about the CEC shedding of non-core businesses. That's going to impact the margins.

And then just staying on this topic more specifically, would fourth quarter represent the trough in margins and how should we sort of think about 2027 as we enter 2027 with a strong backlog and obviously to your point, you know, 20 to 30% organic growth?

19:47

Joseph CutilloChief Executive Officer

Yeah, appreciate it, Manish. Yeah, so we have in the fourth quarter, we have a couple dynamics. We have the natural seasonality that we go through, and we've done that every year. As we've said, we're being a little conservative on weather for the quarter compared to 2025. Just to remind everybody, 2025 was about the easiest, softest winter we've had since I've been here. We basically didn't shut down anything and were able to run through the entire winter.

We don't anticipate that happening again. If it does happen again, that's good. We'll have upside. We'll all be happy. So we have margin erosion just from the seasonality in that. But we also have the growth of CEC, which I want to step back and talk about for a second here, because everybody's looking at this as a negative. And it's really baffling to me. And some people have called it mix, and I wouldn't call it mix.

We have an electrical business, which is very different than our site civil business. It requires a heck of a lot less capital, and we've been able to grow it significantly faster than we ever imagined. That is a great thing. We've more than doubled the business, yet everybody is looking at it as a negative because it's bringing down the total margins. We have invested almost very little to zero capital in the business to double it. We've been much more successful at hiring electricians than we ever anticipated, which is a great sign. We've got the next phases and next levels of projects from our customers, so we've been successful in executing and delivering, yet we're beat up for it.

It makes no sense to me. So as we grow that business, look, we've had great growth in our site civil business. But as we grow that at a much greater rate, the bottom line is those margins are less. They will always be less. A significant piece of their business is material. And you're not going to be able to get the margins on material that you get in executing the work. Now, another positive thing is we've made great progress. And what we said early on is we were going to improve margins in that business 300 to 500 basis points in 18 to 24 months. I will tell you we're a long way on that path. We're ahead of schedule.

And if you remove the legacy business, which we know we have until the end of 27, and hopefully we're able to do some things to get out of that a little quicker. If you remove that, we're on track and we've seen over 150 basis points of improvement in CEC already. So I just want to use this opportunity to talk a little bit about that because I think people are really confusing kind of the goodness that's come out of this position and as a result are penalizing us for really no reason whatsoever.

The second question, just repeat that, let me. Yeah. I'm sorry. Yeah. No, Joe, the second question I had was just on, you know, the trajectory of margins. You know, would 4Q sort of represent a trough in margins? And, you know, how should we sort of think about margin trajectory as we enter 2027? And I guess while I have the mic, if you could also just touch on, you know, backlog, how much of that unsigned backlog that you have, which is quite significant, can move into signed backlog? You know, what's sort of the cadence for that? Thank you. Yeah, so let me start with the trough. We certainly have seasonality in our margins. That will continue.

Now, as we grow the business and we grow in other regions, could that soften it a little bit or change it? Sure, but we will have seasonality, so we don't have a flat margin across four quarters. I will also say we have pretty high expectations for the site civil growth in 2027. But we also think electrical has the opportunity to continue some of these growth rates.

And if that happens, again, the blended margin will be the blended margin. I can't predict it because I don't know what the revenue is going to be. But theoretically, and I say theoretically, in reality, the margins of site will continue to improve and the margins of electrical will continue to improve. Now, whatever those revenues come out will determine the end margin. But we're very positive on the margin trajectory in each piece of our infrastructure segment.

On the backlog, I wish somehow we could get out of backlog altogether because it's really a meaningless number for us. We have to look at what we have in backlog. That's jobs that we're actively working on. We have what we call unsigned awarded contracts. That's predominantly in transportation and some in electrical.

And what those are is those are jobs that we have been given. We're negotiating final pricing or negotiating final terms and contracts. So those will roll in the backlog. They could roll in the quarter. If there's some design work involved, it may take a couple quarters. But we have won those jobs. We're in the final negotiation. So those will happen. We have what we're calling the next phase or phases in design, I guess, is what we're calling it. I apologize. But that's work that's really in the site civil side. That is work that we are in the design phase or in the pricing phase to customers that we know is coming right after these existing phases end.

But there's another piece that everybody's missing. And for those that were on the tour and they're on the call, we literally have thousands of acres of land that is permitted, powered, and ready to go. And when the existing phases end, they will design, build out those next phases. Those represent over five years of work for us. So when we talk about backlog, backlog represents a very small piece of work that we have sitting in front of us. And as we're talking about building capacity, I'm sure somebody's saying, well, your backlog's not growing at the rate that your capacity build needs are saying. It's because of that future land and that longevity of these projects that we know we're required to build this capacity to handle these new projects that are coming.

I hope that helps, Manish.

26:31

Manish SomaiyaAnalyst, Cantor Fitzgerald

Thanks, Joe. Thank you so much.

26:36

Thank you. Your next question comes from Brent Tillman with Oppenheimer. Please go ahead.

26:42

Brent Edward ThielmanAnalyst, Oppenheimer

Hey, thanks. Good morning. Great quarter. Hey, Joe, maybe just to follow up on that last point on e-infrastructure, maybe to address some of the other concerns out there. I mean, you've got all these campuses with phases going on for years. Presumably those have power. When you look at everything else out there, I guess just in terms of new campuses that could be potentially in your pipeline to work on? Do those have power connections figured out as well? Just trying to address that concern.

27:14

Joseph CutilloChief Executive Officer

Yeah, yeah. I'm not aware that we've ever started a campus that didn't already have power on it. So these are all permitted, all powered, all ready to go. So, and, you know, as we're looking at the ones coming, they are obviously working on the permitting, the power. And as soon as that's released, they generally turn it over to us and we start working. The incremental land that we're talking about is part of that package. And what we've seen in a lot of cases where they were able to get more power associated with a project, they're buying up incremental land around that area. So a lot of these jobs are actually continuing to get bigger than they originally started when we started on the project.

So that's not uncommon at all.

28:08

Brent Edward ThielmanAnalyst, Oppenheimer

Okay. And then maybe on BEC, obviously massive growth here this year. Or, you know, Joe, given some of the constraints up there, kind of help us think about how you get more out of this business, whether it's capacity investments, et cetera. And I think ultimately what I'm trying to get to is, you know, what sort of a realistic growth assumption when you think about that 20 to 30 you threw out there for a business like this, just given the demand and supply side constraints?

28:44

Joseph CutilloChief Executive Officer

I'll tell you a couple things, Brian. We've been very happy with the ability of CEC to obtain electricians. The last number I saw, we were hiring roughly 80 a week just in the state of Texas. We think we can continue to be successful at that into 2027. I will tell you, we have some pretty aggressive growth opportunities with CEC in 27. But in addition, we're looking for small to mid-size, and if we find a large, that would be great, acquisitions that we can convert their labor force, what they're working on existently, and maybe working on small commercial projects or small industrial projects, where we can convert those labor forces to our end mission-critical customers at capacity there.

In addition, you know, we talked about triple the size. We're building out our IMS facility, which does prefab and modules. Every time we can do prefabs or modules, it takes a significant amount of the work required out of the project, which in turn turns into capacity for us. So those are the things that we really focused on We happy with the progress I think CBC will have great growth numbers in 27 Okay Last quick one just on site development I think you mentioned maybe you didn't see the step up in margin and the 3Q from preceding quarters, just kind of given project timing, early stage projects.

30:28

Brent Edward ThielmanAnalyst, Oppenheimer

Could you talk about maybe the other elements like new geographies you're ramping up on? Are those a margin drag? Are they approaching kind of core legacy margins? Just talk through that.

30:42

Joseph CutilloChief Executive Officer

So the new geographies, we're certainly not near what I'll call our most established geographies margins, but we're seeing nice improvement in them. The other thing to keep in mind, we talked about the Micron project and the high burn in the quarter. And I don't know, Brad, if we've talked about this specifically with you, but one of the uniquenesses of that particular project is the first $600 million or so at 4 million cubic yards of rock that we had to buy and put on that. So it was a large material purchase, and the margins are lower on the material side.

So their margins on that job are not at the levels of our traditional job. Now, as we get into future phases, that turns into a more traditional job for us. So that definitely was lower as a blended margin. But we're very happy with the progress of all the margins because we were able, even with that, even with the new geographies, to keep the site civil margins flat quarter over quarter. So it says we're making a lot of progress in a lot of areas. We would have thought, based on that burn of micron, that the margins could have gone down for the quarter.

32:04

Brent Edward ThielmanAnalyst, Oppenheimer

Okay. Very good. I'll pass it on. Thank you.

32:09

Thank you. Your next question comes from Noel Evans with William Laird. Go ahead.

32:16

Unidentified AnalystAnalyst

Great. Good morning, Joe, Dan, Nick, and Noel. Thanks for taking my questions. And to start off, last quarter you alluded to the softness in Q3 bookings and then kind of a resurgence in Q4 in early 2027. And I'm sorry if I missed it, but can you give us some color on those potential bookings? Are they still expected to occur this quarter or early next year?

And then given that different winners award phases and sizes, Are you confident that these potential expected bookings are going to be as large, or is it just more confidence that they will occur in this timeframe? Thanks.

32:59

Joseph CutilloChief Executive Officer

Well, here's what I'll tell you, and this is, again, why we don't like backlog. I could theoretically book a billion-dollar project and put $10 million in backlog, and you wouldn't see the 900-whatever billion dollars left. left. Okay. What I can tell you is all the projects that we've talked about coming out in the fourth quarter and first quarter are still there. They're still coming out. We will see timing. I always hate timing because if something moves one week, it can miss a quarter and be in the next quarter, but those projects are still progressing and moving forward. Those projects are bigger than projects that we've seen in the past and will last longer than projects have in the past.

We're extremely optimistic that they will be contributors in 2027. How fast they start and everything, it's the same typical thing, right? They're working through permits. They're working through all that. And as soon as they get everything done, they're going to pull the trigger and get us going as fast as possible. So nothing's changed on the outlook there. Nothing changed on the project types or size. and we're still moving forward. So we feel very good about the prospects that are in front of us and the impact that's going to have on 27.

34:21

Unidentified AnalystAnalyst

Great. Thanks. That makes a ton of sense. I mean, can you give us just like drill down on the geographic expansion? Specifically, like how has your penetration of Texas been going in light of the ERCOT audit and then like differentiate between West Texas exposure with your Rocky Mountains business, as well as I guess Stone Ridge has exposure there, and then your East Texas exposure with Plateau. And then also, like, have you already started to expand into the Pacific Northwest, or is that more of a 2027 event? You've talked about customers dragging you into that geography as well as other geographies. So just an update on specifically Texas and then the Pacific Northwest and then other ancillary geographies.

Thanks.

35:09

Joseph CutilloChief Executive Officer

Yeah, well, you know, Texas is going to be the biggest data center state in the next five years. So the magnitude of projects coming out are huge.

They're in what I'll call the early, early phases of a lot of these projects. And that's what we see coming out, essentially fourth quarter, first quarter next year, some of those, both in West Texas and what we call East Texas, which is really North Central Texas. and we've made great progress on the ones we're on. The CEC business has got the second phases. We continue with the site developments. We've got the total packages on those and we continue to get asked by our customers to do more.

So we're very bullish on Texas. Our bigger challenge right now is how do we grow capacity fast enough to capture as much of Texas as being thrown at us, right? So we've got more, I guess a simple way to put it is we've got more opportunity than we have capacity right now. We're trying to figure out how to get more capacity to take that.

The upper northwest or Pacific northwest, you know, we're up. We're doing work. You know, one of the first jobs we're doing work on happens to be a micron chip plant up there. We got pulled into the micron chip plant because of the work we've done in New York. We see that as the beginning. The data centers we're talking about haven't come out yet. We think that's going to be late 27 or 28 before we start seeing that activity.

But the good news is we're positioned with Stone Ridge, positioned with our RW business and the work we're doing up in Idaho, and we'll be ready for that when it comes.

36:57

Unidentified AnalystAnalyst

Great. Thanks. And then just a final quick question. you guided to CapEx of 140 million for 2026, which implies 20 million sequential step down. Given we're having a lot of conversations today about capacity, and then in the past, you've alluded to some of the heavy machinery providers having some supply tightness. Is that kind of the attributor to why CapEx is stepping down sequentially? Or how are you kind of looking at growth CapEx and kind of your ability to build capacity to meet all of this tremendous demand. Thanks.

37:31

Joseph CutilloChief Executive Officer

Yeah, I'll let Nick give you some color on it, but it's just timing. You know, I wouldn't look at it as stepping down, I think, because we go to next year, you know, we'll need more CapEx to help with our growth rates.

37:42

Nicholas GrindstaffChief Financial Officer

But Nick, you want to give some? Yeah. So, look, we have other things in our toolbox here, too, as far as procuring equipment. We've got a leasing program. Obviously, we've got rentals, too. But even, you know, so it's just not all capturing the CapEx number. And so we'll supplement that CapEx with our leasing program.

38:10

Unidentified AnalystAnalyst

Great. Thank you.

38:13

Thank you. Your next question comes from Kurt Jinger with DA Davidson. Please go ahead.

38:19

Unidentified AnalystAnalyst, D. A. Davidson & Co.

Great. Thank you. And good morning, everyone. Just quickly on CEC, I think kind of year to date, that's a little bit over $800 million in revenue. I know you have kind of that $1 billion number out there. I guess, is there any reason to believe that Q3 kind of burn is maybe something that couldn't be repeated? Or is that maybe just a little bit of conservatism thinking about kind of the end of the year?

38:48

Joseph CutilloChief Executive Officer

Yeah, as we said, no, there's no reason that we can't do QT free and other quarters. We have factored in some conservativeness on weather. The other thing that people tend to forget is Q4. We have a couple big holidays called Thanksgiving and Christmas, and our guys work all year long and don't get vacation. and we try to force schedule vacations around those holidays, it's a lot easier for us to manage. So part of the seasonality is just labor management and resource management.

It's a lot easier, frankly, for us to say we're going to shut down these two weeks or reduce crews these two weeks and reduce crews these two weeks so everybody gets their vacation in and can hit the ground running in the next year. So nothing unique about Q3. What you're seeing is, you know, CECs continue to have very strong bookings and grow.

They've got the next buildings of several projects within Texas, and you're just seeing that revenue kick in.

40:06

Unidentified AnalystAnalyst, D. A. Davidson & Co.

Understood. Okay. And then second, on just kind of the competitive environment more broadly in the site development side, And, you know, you've talked about, you know, the desire to plant the flag on those projects, you know, that are longer in duration, you know, making sure that you're aligned with the right customers. I guess, is there any trade-off you have to make from a margin perspective to extend that visibility and ensure you're partnered with those right customers? Or is the service, speed, execution, all of those things still showing up in terms of the margin profile of the work that you're bidding or new work, so to speak?

40:48

Joseph CutilloChief Executive Officer

A couple things to keep in mind. First of all, our first phase is always our lowest margin phase. And as these projects advance and we get further in phases, our margins go up over time.

In a lot of that, everybody thinks it's pricing. It's really about productivity and things we can do along the line in earlier phases, which either help us or eliminates things we have to do in future phases. That's one. The other piece of it is if we plant a flag in Texas where we're not 100% vertically integrated, those initial margins will be lower than in the southeast where we're vertically integrated and we perform everything. However, we've talked strategically that once we get enough critical mass and we're getting there very quickly, we will begin vertical integration in Texas or in new geographies that we are and continue to ramp up that margin profile. So you get a double ramp.

You've got the natural progression of the phases over that five-year period or seven years, whatever that project takes. And then you've got an incremental ramp, which is around as we continue to vertically integrate the other ancillary services and stuff required on that project, you get another pickup. So, if you look at it, this is the best way for us to have not only long-term growth, but also long-term margin expansion opportunities, because the margins will go up on those projects over time.

42:29

Unidentified AnalystAnalyst, D. A. Davidson & Co.

Got it. And maybe just one quick follow-up on that. I mean, you've talked about, you know, a lot of these new geographies in Texas in particular. Like, when you think about the timeline for kind of vertically integrating some of those new areas, is that something that you would kind of think about as a 2027 type timing or, you know, probably think further out in terms of when that happens?

42:57

Joseph CutilloChief Executive Officer

Yeah, unfortunately, it's not a toggle switch. It's kind of a duration time. It took us, well, I will tell you, we're still not finished in Southeast Wars. We continue to look at other services we can add that are parts of the project. But it's really a 24 to 36-month kind of runway, if I was going to give kind of a ballpark average.

What we have to do, just to kind of understand it, is we've got a non-critical mass that when we buy a company, we can keep them busy 100% of the time on our projects. Otherwise, we'll have underutilization, negative productivity, and it'll actually drag down the margin. So what we like to do, which makes it take a little more time, but it's a much more successful model, is we like to partner with subcontractors in test run.

And the ones that we think are the best, We then continue to grow until the point that they can't keep up with us. And then it's a logical time to buy them, right? And it's good for them and it's good for us. And we have great success rate not only on acquiring them, but we double or triple them in 12 to 18 months by putting more revenue and volume on them. So it's worked out really well.

So as soon as we get enough critical mass, whether that's in blasting or soil stabilization, or I can name 10 other things, we'll start looking at how to vertically integrate that. Or, you know, in some cases, we may organically try to put a small business together to support that.

44:36

Unidentified AnalystAnalyst, D. A. Davidson & Co.

Okay. That makes sense. Thank you very much for the color.

44:41

Thank you. Your next question comes from Brian Brophy with Stifle. Please go ahead.

44:46

Unidentified AnalystAnalyst, Stifel

Hi, this is Quentin Helmer on for Brian Brophy. So StoneRidge outperformed quite meaningfully, it seems. You touched a bit on the drivers already. Is this kind of a one-off because of the large project that you mentioned earlier? What's kind of the trajectory you should be thinking about as you continue to execute and tuck-ins on the site development side? What are some things you're seeing there? Any color would be appreciated I sorry what was the question around StoneRidge you mentioned Yeah and just kind of how it outperformed Obviously the micron plan is part of it I kind of trying to see what's the trajectory we should be thinking about as you kind of continue to execute on these tuck-ins.

And yeah, any color there would be appreciated.

45:30

Joseph CutilloChief Executive Officer

Yeah, yeah. So the micron job really isn't related to Stone Ridge. The micron job is related to the reason we got that, how we got that, is the performance that we have on the New York job. And if you guys remember, we delivered the September package in July, and we delivered the January, February package back in September. So we're several months ahead on that project. Not only was Mike Brown impressed, but the GCs on there were so impressed on how far ahead we were. We were asked to go take a look at the job that's taking place in Idaho.

And SANS have started doing some work on that job. We're actually using our ROW business on that. They were doing another data center up in that region and area. So we just moved them over there.

46:25

Unidentified AnalystAnalyst, Stifel

What was the next question? No, that was pretty much it. Thank you for the clarification. That's very helpful. I'll pass it on.

46:33

Joseph CutilloChief Executive Officer

Yeah, I think the important takeaway of that is exactly what we did in data centers. we're doing in semiconductors. And the semiconductor tidal wave hits around 2030. So for us, to have this much work today in semiconductors is a huge bonus, but more of a credit to our teams on the value they can bring to customers. And we believe we will be the go-to company on the big semiconductor jobs when they come.

47:09

Thank you. Your next question comes from Sanjit Ajain with Kiba. Capital Markets, please go ahead.

47:16

Unidentified AnalystAnalyst, Kiba Capital Markets

Chris, thanks for taking my question. Joe, can I ask you a bigger picture question on the dynamics that you're seeing in the market right now with reference to the pushback to rural data center activity? And if that is changing in any way how you manage risks as you consider terms and conditions for these large bookings?

47:35

Joseph CutilloChief Executive Officer

yeah so a couple things there there is so much noise out there and i can't wait for next week to be over um on uh permitting and everything else and in fairness to our customers you know they we've got these projects they've got them sitting there they're ready to get going but they're trying to figure out like is something going to change right and my answer is i don't know and they don't know. Right now, in some instances, I'll give you a perfect example. In Texas, there is all the buzz around permitting and having to go back through everything.

And one of the things that was happening is TCEQ, who hands out all the water permits for the state of Texas, has an automated process for permits. Well, guess what? Data centers were still submitting applications for permits through the automated system, and they were getting permits. Some group stepped in and said, wait a second, this isn't what the governor said. You have to manually review the permits.

And TCEQ said, well, we don't really have a process to manually review. The customer said, I got permits. Are they valid or not valid? I will tell you they're debating back and forth right now on whether they are, So it's a little bit of limbo. So are those projects going to go? Absolutely are they going to go. Is there confusion in the system right now for things like that? Absolutely there is. I think after the election, a lot of this goes away and it'll become very clear. But we're not seeing anybody backing off projects. We're not seeing anybody change strategies or anything else. But let's just say we're all wrong. Worst case scenario, something like that happens.

Here's what's going to happen as a result. That thousand acres that I have left on the job that has power and permitting, they are going to figure out how to either build that out faster or buy more land around it until they get the other stuff worked out. So we are sitting here looking at it with five plus years of work in our grasp on projects we're working on, saying, could there be some noise? Probably. Do we hear anything about the work slowing down or getting smaller? The answer is absolutely not.

So we'll get through it, and it'll be fine.

50:11

Unidentified AnalystAnalyst, Kiba Capital Markets

All right. Thanks. And then if I can ask one on the entire margin discussion that has happened so far, you spoke about site prep margins, the puts and takes. You know, you're in early stages on several jobs, and those stages tend to be a little bit margin diluted. You're also moving into new geographies. So can you tell us how you're thinking about which one goes first, whether the existing jobs go into advanced stages and show more margin, or whether the geographic expansion takes over and we continue to see margins in this flattish range for a while?

50:50

Joseph CutilloChief Executive Officer

Well, I'd have to do a pretty deep analysis on it. Here's what I would tell you is in the quarter, you would have thought our margins would have gone down on site, and they didn't, which says the combination of the advancements in margins in the new geographic expansions are improving very nicely. We're in the early phases of a lot of projects. I would have thought that would have brought it down in the Micron project, which is a unique one. We know that shifts into a different set of phases as we get into 2027, probably around the second quarter.

We know we'll continue to make advancements. So I don't see us having site margins going backwards. The question is how fast do they go forward, right? And as those kick in, they're all positive tailwinds, not negative tailwinds as we go forward.

51:46

Unidentified AnalystAnalyst, Kiba Capital Markets

Understood. Thank you so much.

51:49

Thank you. Your next question comes from Adam Thalheimer with Thompson Davis. Please go ahead.

51:57

Adam ThalhimerAnalyst, Thompson Davis

Hey, good morning, guys. Hey, Jay, you talked about growing earnings 50% plus with acquisitions. Was that a multi-year comment or a 2027 comment?

52:08

Joseph CutilloChief Executive Officer

Well, Adam, over the last six years, we've grown at 48% on the bottom. I don't like to go backwards. And I think we have a multi-year opportunity here to continue to grow based on what we're seeing coming out of the marketplace. Yeah, everybody talks about data centers. We feel very bullish on what we're seeing over the next three to five years coming out of data centers. We feel like we are positioning ourselves extremely well for the semiconductor wave that starts coming out around 2030.

So you start putting those together, plus all the, you know, nobody's talking about the one-off manufacturing plants here and there. We've got the Rivian plant. They just announced an Audi plant. They just announced, you know, four or five others. We don't have those, but we'll see where they fall and if we do them. We're passing on the pharma plants right now just because we don't have the capacity to go after them.

So we have plenty of opportunity to do that. The biggest wild card is the acquisition. I feel very good about our organic side.

The acquisitions are always a wild card. Can we find the right ones in the right place at the right price? I feel very good about the market today. You know, we've seen some high-quality businesses out there. both in site and electrical, and excited about 2027. So it's not 27. This is what we think we can do over a multi-year.

53:44

Adam ThalhimerAnalyst, Thompson Davis

Okay. Good color. And then to what extent were margins negatively impacted in Q3 by diesel or other inflation?

53:56

Joseph CutilloChief Executive Officer

Yeah, you know, it's really interesting. I mean, nobody's heard us talk about diesel. Nobody's heard us talk about inflation.

And the reality is what we love about our contract structure and the way these things are phased is that really mitigates a big part of that risk. If we want a billion, you know, a seven-year, billion-dollar project and we put that all in backlog, we'd be whining and crying at every one of these calls about diesel prices, about concrete prices, about something else.

So it's a negative in the outside world because no one believes we have a billion dollars, but we know we do.

It's a positive because the contract structure really mitigates the risk on that stuff. So I won't tell you that we've had zero impact. That would be false. But we're not going to talk about it because our job is to overcome it. And it's such a small impact. We're moving forward.

54:53

Adam ThalhimerAnalyst, Thompson Davis

Perfect. Thanks, guys.

54:57

Thank you. Your next question comes from Julie Romero with CDT Company. Please go ahead.

55:05

Julio RomeroAnalyst, CDT Company

Hey, good morning. Thanks for taking my questions. Joe, Nick, Dan Noel. A lot of good questions about capacity today. Just over the next four to five years, how would you have us think about the pace of capacity ads and what kind of visibility you have to that pace? Joe, you said that you've been very successful at hiring and adding electricians.

You said CEC is a great returns business. Relatively less fleet needed, more about adding headcounts. So clearly with the demand outlook being very strong and multi-year, it sounds more and more like the pace of capacity ads is increasingly important to the growth runway in, say, 28, 29 and the next decade. So if you could speak to the pace and visibility of that.

55:44

Joseph CutilloChief Executive Officer

Yeah, yeah, really. It's a good question. You know, the question no one's asked, and I'm glad because it's kind of a delusional question, is we've grown at much. We've said over the next several years we can grow 20 to 30 percent organically and feel comfortable with that. We've grown a hell of a lot more than that organically over the last couple of years.

Now, you can only keep that sort of pace for so long. We feel good on the 20% to 30% organic pace over the next several years. Certainly internally, we're going to try to do a hell of a lot more than that. But you really start getting stretched on some of the internal resources, some of the capabilities. To beat that pace, it's really going to require us to do more on the acquisition front and really add more capacity, whether that's in new geographies or within geographies that we're in. For us to even come close to keeping up with the pace of stuff coming out in Texas, we're going to have to make those acquisitions. Now, as we talked about in the site tour a couple weeks ago, there are things we can do with acquisitions that are not even in Texas that can help us with capacity in Texas.

What I mean by that is we have two types of crews. We have traveling crews and we have local crews. And for us, a traveling crew, it doesn't matter if they're in Virginia or Texas or Ohio or wherever you want to pick.

They travel and they do work. So one of the things we're looking at is if we have a concentration of either a traveling crew that's on a mega project and is going to be there for a long period of time or multiple traveling crews in a geography, does it make sense for us to make an acquisition within that geography of which we can then lever to do the work of the traveling crew and grow that business quite substantially very quickly?

And that then frees up the capacity of that traveling crew. So I can make an acquisition in an area, grow the business very rapidly, double it probably three years, free up a traveling crew that now frees up $500 plus million in capacity for me, and put them in a new job. So those are some of the things we're looking at to increase the pace of growth beyond that 20% to 30% of them.

58:11

Julio RomeroAnalyst, CDT Company

Very helpful. Thank you. And then have you seen any changes in how customers are financing or committing to future phases or negotiating payment terms? And just talk about more broadly how customer financial quality influences your customer selection process.

58:26

Joseph CutilloChief Executive Officer

Yeah, no, we haven't seen anything. You know, the lion's share of our customers are the top tier guys, one tier down, that are all financially very stable. I know everybody panics when, you know, a Meta or Amazon or somebody goes and gets financing. I look at that as that's more money they're going to spend on us to build more stuff, right? That's the greatest thing that can happen every time I see that happen. So we have not seen anything along those lines.

The step up in receivables in the quarter really is more timing and starting the first phase of a lot of these projects. And, you know, as you can imagine, you start a project, you get going, even if you have a 30 day building cycle, By the time you get everything done, build it in, it's 60 days minimum before you're going to get your first payment.

So unless you start those right at the beginning of the quarter, you're not going to see them. And we had a pretty strong first couple weeks in October. So just kind of way out with what we've seen in the past.

59:40

Julio RomeroAnalyst, CDT Company

Great. Thank you.

59:44

Thank you, Julio. There are enough other questions on the phone line. I'll turn it back to Joe for some closing comments.

59:51

Joseph CutilloChief Executive Officer

Great. Thanks, Bob. I want to thank everybody again for joining the call today. If you have any follow-up questions, please contact Noelle Dims. Her contact information is in the press release. I hope everybody has a great day.

We'll be talking to a lot of you this afternoon. Thanks.

1:00:12

Ladies and gentlemen, this concludes your conference call for today. We thank you for participating and ask that you please disconnect your lines. Have a great day.

Other Sterling Infrastructure earnings calls

  • Q2 2026 earnings call

    Management framed demand as accelerating beyond reported visibility, while emphasizing capacity-building and conservative near-term assumptions over maximizing current awards.

    Aug 04, 2026Confident0.82
  • Q1 2026 earnings call

    Management framed demand as accelerating beyond expectations, with growth increasingly driven by larger, longer projects and execution productivity rather than pricing.

    May 05, 2026Confident0.91
  • Q4 2025 earnings call

    Management framed 2026 as another strong growth year, with expanding mission-critical work and Texas momentum outweighing residential weakness.

    Feb 26, 2026Confident0.82
  • Q3 2025 earnings call

    Management framed the quarter around durable infrastructure demand, expanding project complexity, and growing visibility, while acknowledging persistent residential weakness.

    Nov 04, 2025Confident0.82

All Sterling Infrastructure transcripts

About this transcript

The summary, guidance, analyst focus, and tone are automated and should be checked against the call before being relied on. Names and figures can be misheard. Listen to the replay.