Management framed execution, backlog visibility and rising margins as supporting sustained growth, while saying 2027 growth is largely covered by awarded work.
- More than three-fourths of expected 2027 revenue is already in backlog, but management declined to provide an exact percentage.
- 12%Civil margins may rise above the current 12%–15% range; management wants another quarter before revising its guidance.
- Current backlog burn is expected to peak in late 2028, with additional awards expected to sustain growth afterward.
Guidance
- $5.902026 adjusted EPS $5.90 to $6.10 per share
- 2027 revenue growth double-digit
- 2027 earnings growth double-digit
- 12%Civil segment operating margin 12% to 15%; management sees upward pressure
- 3%Building segment operating margin 3% to 6%
- 5%Specialty segment operating margin 5% to 8% eventually; management expects the range sometime in 2027
What analysts pressed on
- 01Data centers: about $70 million booked and 0.2% of backlog; management said they are not a focus.
- 022027 revenue visibility: more than three-fourths is already in backlog; management declined to give an exact percentage.
- 03Segment margins: management sees potential improvement, but deferred a civil-range change pending another quarter.
- 04Black Construction capacity: current capacity is roughly $3 billion to $3.5 billion of the $4.6 billion opportunity pipeline.
- 05Award timing and funding: environmental reviews are delaying some Indo-Pacific awards; management said transportation work is proceeding without funding-related delays.
- 06Backlog burn: the current backlog may peak in late 2028; management expects new awards to replace work as it burns off.
Notable disclosures
- More than three-fourths of expected 2027 revenue is already covered by Q3 backlog, which management called unusually high visibility.
- $750MAbout $750 million of building pre-construction work is expected to enter backlog over roughly 12 to 18 months.
- 5%Newer specialty work meets or exceeds the 5% to 8% target margin; legacy items still depress reported margins.
- $1.1BManagement said it would prefer sole-sourcing large projects, citing $1.1 billion of cash at quarter-end.
Risks raised
- Environmental reviews are delaying decisions on major Indo-Pacific opportunities, including bids that have been pending for months.
- Expected winter conditions and seasonality may pressure Q4 margins; management said results could tick up or down from Q3.
- Specialty margins remain below the 5% to 8% target while legacy work continues to settle.
- Management cited localized electrician shortages, though it reported no current capacity constraints or expected labor issues.
Tone: Confident 0.90
Management expressed strong confidence in continued growth and margin expansion, while acknowledging award delays, seasonal pressure and lingering legacy work.
Who spoke
Company
- Jorge ExatoSenior Vice President of Investor Relations
- Gary SmalleyCEO and President
- Ryan SorokaExecutive Vice President and Chief Financial Officer
Analysts
- Adam ThalhimerAnalyst, Anson & Davidson Company
- Unidentified AnalystAnalyst, Texas Capital Securities
- Michael DudasAnalyst, Vertical Research Partners
- Liam BurkeAnalyst, Riley Securities
- Steven FisherAnalyst, UBS
Full transcript
Analyst questions are marked with a bar. Timestamps are into the recording.
Prepared remarks
Good day, ladies and gentlemen. And welcome to the Tutor Perini Corporation third quarter, 2026 earnings conference call. My name is Mike and I will be your coordinator for today. All participants are currently in a listen-only mode. Following management's prepared remarks, we will be opening the call for a question and answer session. As a reminder, this conference call is being recorded for replay purposes. I'll now turn the conference over to your host for today, Mr. Jorge Exato, senior vice president of investor relations, please proceed.
Jorge ExatoSenior Vice President of Investor Relations
Hello and thank you all for joining us. With us today are Gary Smalley, CEO and president, and Ryan Soroka, executive vice president and CFO. Before we discuss our results, I will remind everyone that during this call, we will be making forward-looking statements, which are based on management, turn assessment of existing trends and information. There is an inherent risk that our actual results could differ materially.
You can find our disclosures about risk factors that could contribute to such differences in our Form 10Q, which we are filing today, and in our Form 10K, which was filed on February 26th, 2026.
Company assumes no obligation to update forward-looking statements, whether due to new information, future events, or otherwise, other than as required by law.
In addition, during today's call, management will be referring to certain non-gapped financial measures. You can find information and a reconciliation of these non-gapped financial measures in our earnings release and in our Form 10Q, both of which can be found in the Investors section of our website. Thank you, and with that, I will turn the call over to Gary Smolley.
Gary SmalleyCEO and President
Thanks, Jorge. Hello, everyone, and thank you for spending time with us today. We delivered another quarter of outstanding results that featured record operating cash flow, revenue operating income, and earnings. Our consistent execution and continued backlog growth give us tremendous confidence and visibility into our ability to continue creating value for shareholders over the near and long term. This marked our seventh consecutive quarter reporting outstanding results.
Our operating cash flow from the third quarter in the first nine months of 2026 was up 14% and 16% year over year, respectively, each setting new all-time records, with the third quarter result of $331 million representing the largest of any quarter ever.
Our record cash flow this year has been driven by higher volume, strong execution, record earnings, and collections on various large projects that are very profitable.
Our third quarter revenue was a record $1.7 billion, up 22% year over year, driven by contributions from various projects, most of which are in the early stages with significant scope of work remaining.
As a result of our strong revenue growth and project execution, we generated record operating income of $125 million, which more than tripled compared to the same quarter last year, and we produced 39 cents of gap earnings per share and $1.83 of adjusted earnings per share, a 457% and 59% respectively, compared to the third quarter last year.
Brian will delve into the details of our financial results shortly. Our operating margins were also outstanding. Our civil segments, third quarter operating margin, was a solid 14%. Our building segments operating margin was also strong at 5%, with operating income that was nearly double that of the third quarter of last year.
Our specialty contractors operating margin was 3.5% for the third quarter, up 130 basis points compared to the prior quarter margin, and reflecting the continued margin expansion we have anticipated this year.
We believe that the specialty segments margin will continue to improve as its electrical mechanical work ramps up on several of our large civil and building segment projects.
Overall, we are extremely pleased with the continued upper trajectory of our business and the substantial revenue, earnings, margins, and cash we are generating from our growing and profitable backlog.
Let's turn to the details of our third quarter new awards and backlog. We booked an impressive $2.2 billion of new awards in contract adjustments, a solid book to burn of $1.3x, and finished the quarter with a near record backlog of $20.4 billion, the largest additions to backlog included.
A billion dollars of additional work for a civil segment project that includes a substantial amount of electrical and mechanical work to be performed by the specialty contractor segment, $577 million of new awards for several federal government projects for pretty management services, $145 million of new awards in additional funding for various military facility projects and the Indo-Pacific region for black construction, $126 million for various bridge projects in the Midwest for London construction, $108 million of additional funding for the Choctaw Casino Resort, Pacola, renovation, and expansion project in Oklahoma, and $89 million of additional funding for several mass transit projects in California.
As a reminder, our strong backlog, which includes nine mega projects totaling $16 billion of awarded value, was significantly improved contractual terms that we have won over the past few years, continues to provide us with excellent visibility for future revenue, earnings, and cash flow over the next several years. We expect that our backlog will continue to drive impressive revenue and earnings growth, solid profitability, and strong cash flow in 2027 and beyond.
We continue to have numerous significant project bidding opportunities, particularly in the Indo-Pacific region, as well as in California, the Midwest, the Northeast, and the Mid-Atlantic. Our massive pipeline of more than $200 billion in potential project opportunities over the next three to four years is broad geographically and diverse across end markets, and about three times larger than the pipeline we had just a couple of years ago.
We expect that many of these opportunities will bid over the next year or two in our confidence that we are well positioned to win our fair share of them.
We remain highly selective and disciplined in our approach to bidding and winning new projects. With our key objective being to maximize shareholder value, our focus remains on bidding projects conservatively, so that our project budgets reflect safe costs, adequate contingency, higher margins, and favorable contractual terms that balance risks between us and our customers.
We continue to see limited competition across the markets for the larger six-price projects, which should help us win important and profitable contracts that will enable us to further grow our revenue and earnings and expand our margins.
Now I'll review some of the specific bidding opportunities we are targeting this year in over the next couple of years.
In the Indo-Pacific region, black construction continues to pursue more than $4.6 billion of federal opportunities, including major wharf, harbor, military, and aviation projects across Guam, Palau, Yap, Wake Island, and Pinion. In fact, we have submitted bids for three large projects in the region's value at nearly $1 billion for which we are awaiting the customer's decision.
In the U. S. , we plan to bid on several multi-billion dollar infrastructure projects, including the initial contract for the Sepulveda Transit Corridor program in Southern California, a program believed to be valued at approximately $12 billion, and expect to be awarded under multiple contracts, as well as the Merced Madeira segment of the California High Speed Rail project.
We also have in Southern California the $4 billion Southeast Gateway, the $2 billion East Side Transit Corridor Phase II, and the $1.5 billion Sea Lion Extension to Torrance projects.
On the East Coast, we will pursue the $3 billion Hudson Tunnel Systems and Fit Out project in New York, the $3 billion Newark Liberty International Airport Terminal B project in New Jersey, and the $1.2 billion Newark Bay Bridge project.
Late next year or the following year, we expect to bid on the second phase of the multi-billion dollar Midtown bus terminal replacement project in New York, the phase that will demolish the existing bus terminal and build this permanent replacement. Around the same time, we also plan to pursue a multi-billion dollar opportunity in Maryland, for which we previously bid and had been selected in 2022, but the project did not move forward at that time.
We're also targeting various new, large healthcare hospitality and gaming opportunities, mostly in California and the Southwest. In addition to these numerous sizable pursuits, we continue to have certain building segment projects currently in the pre-construction phase that are anticipated to advance to the construction phase later this year and over the next two years.
Our massive pipeline of prospective opportunities together with our experience and other competitive strengths give us confidence in our ability to drive backlog growth over the medium to longer term as we continue to focus on earnings growth, margin expansion, strong, free cash generation, quality and safety. We are confident that these opportunities along with our existing backlog will provide the catalyst for continued enhancement of shareholder value.
Finally, let's turn to our outlook and guidance. As I mentioned earlier, we are extremely pleased with the financial results we have delivered thus far this year, results that were well ahead of our expectations.
We continue to benefit from strong customer demand and favorable macroeconomic tailments. Our business is resilient through economic cycles and changes in the political environment, and we remain confident that our future is bright with expectation for continued strong revenue and earnings growth.
Because of the favorable outlook in our record financial results to date, driven by stronger than expected execution of our backlog and mitigation of previously identified project risks. We are raising our 2026 adjusted EPS guidance to the range of $5.90 to $6.10 per share up from the previous range of $5.15 to $5.45.
Importantly, our guidance continues to factor in contingency for unknown or unexpected outcomes in developments this year. We also continue to expect strong operating cash generation for the remainder of 2026 and beyond due to increasing project execution activities on our newer mega projects and the anticipated resolution of remaining legacy disputes.
Looking to 2027 and based on our outlook and assessment of the current market, we continue to anticipate double-digit revenue and earnings growth as construction activities advance on many of our newer, large projects and backlog. Thank you and with that, I will turn the call over to Ryan to discuss the details of our financial results.
Ryan SorokaExecutive Vice President and Chief Financial Officer
Thanks, Gary. Good day, everyone. Our reviewer results for the third quarter then provide commentary on our balance sheet and assumptions related to our increased 2026 guidance. All comparative references will be against the third quarter of last year unless otherwise stated.
Gary mentioned, we generated $331 million of operating cash in the third quarter, up 14%, which set a new record as the highest result of any quarter ever. For the first nine months of 2026, operating cash flow was $665 million, up 16% compared to the first nine months of 2025, and the highest of any first nine months ever.
The record cash flow was driven by higher revenue, outstanding project execution, record earnings and collections on various large projects that are very profitable, as well as effective working capital management with only a negligible amount of attributable to collections from legacy dispute resolutions.
We expect to continue generating solid cash flow this year and beyond, with most of our cash to be sourced from organic operations and occasionally enhanced by cash collected from dispute resolutions.
Revenue for the third quarter of 2026 was a record $1.7 billion, up 22% in the highest of any quarter ever, with the growth primarily due to increased project execution activities on certain higher margin projects, including in the northeast, California, Texas, and the Indo-Pacific region.
Civil segment revenue was $894 million. The segment's highest quarterly revenue ever, and up 16% with the growth driven by increased project execution activities on the Midtown bus terminal phase one project, the Manhattan Tunnel, the Manhattan Jail, the Pensico Eastview Connection Tunnel, the Honolulu Rail Project, and the Opera Harbor Waterfront Repairs Project in Guam, all of which have substantial scope over remaining.
Building segment revenue was $541 billion, up 29%, primarily due to increased activities on the Brooklyn and Manhattan Jail projects in New York, as well as on three large healthcare projects in a hospitality and gaming project in California. All of our major civil and building segment projects continue to run very smoothly. Specialty segment revenue was $286 million, up 26%, with the segment's growth continuing to be primarily driven by increased activities on various electrical and mechanical projects in New York and Texas.
The strong revenue growth helped to drive a third-quarter operating income to a record $125 million, up 213% year over year. Civil segment operating income was $125 million, up 26% compared to $99 million. The civil segment continues to execute well, and once again, delivered a healthy segment operating margin of 14%, up from 12.9% in the third quarter of last year, and running well within the 12% to 15% range, we expect for the segment.
Building segment operating income was $27 million, up 88% compared to $14 million, with the strong increase driven by contributions from certain newer, higher margin projects in New York and California with substantial scope of work remaining.
Segments operating margin was 5%, up nicely compared to 3.4% in the third quarter of last year, and also running well within the 3% to 6% margin range we expect for the segment.
Specialty contractor segment operating income was $10 million for the third quarter, up 64% compared to $6 million for the same quarter last year. The specialty segment's operating margin was 3.5% this quarter, up from 2.7% in the third quarter last year. We are pleased with the specialty segment's continued margin expansion this year, which has been primarily driven by contributions related to the increased volume on the New York and Texas electrical mechanical projects that I mentioned earlier.
We expect to see further margin expansion as we continue toward our goal of eventually sustaining specialty margins in the 5% to 8% range.
Corporate G&A expense for the third quarter of 2026 was $37 million compared to $80 million last year, with a decrease largely due to a $40 million reduction in shared-based compensation expense this year, as some of the liability classified awards that previously caused elevated share-based compensation expense vested at the end of 2025. As a reminder, most, but not all of the remaining liability classified awards will vest at the end of this year, so next year we expect that our share-based compensation expense will be significantly reduced compared to this year.
Other income was $16 million for the third quarter of 2026 compared to $7 million last year, with the increase primarily due to higher interest income earned on larger cash balances this year compared to last year. Interest expense for the third quarter was $7 million compared to $14 million last year, primarily due to the successful refinancing of our senior notes that we completed in July, which reduced the coupon rate of our senior notes from 11.875% to 6.625%, and will save us $21 million in interest expense annually. We are now in a net interest income position and expect this trend to continue. We recorded two significant non-operating adjustments in the third quarter of 2026 that we previously signaled would occur in the second half of this year.
First, a $51 million loss on the establishment of debt tied to the recent successful refinancing we completed in early July, of which $16 million was non-cash, and second, a non-cash $34 million charge associated with the settlement of our former pension plan obligations. We terminated our pension plan because we wanted to eliminate future cash contributions and ongoing administrative expenses.
Income tax expense for the quarter was $11 million, but the corresponding effective tax rate of 22.7% for the period compared to $15 million last year was a corresponding effective tax rate of 44.6% in that period. The lower effective tax rate this year is mostly attributable to the lower non-deductible shared-based compensation expenses estimated for 2026 relative to 2025.
Ed income attributable to Tudor Perini for the third quarter of 2026 was $21 million, or $0.39 of gap earnings per share up more than five times compared to $4 million, or $0.07 of gap earnings per share in the third quarter of last year. Excluding the impacts of share-based compensation expense, the loss on extinguishment of debt and a pension settlement charge that of all the associated tax benefits adjusted net income attributable to Tudor Perini for the third quarter of 2026 was $98 million, or $1.83 of adjusted earnings per share compared to $62 million, or $1.15 of adjusted earnings per share in the same quarter last year.
This was a 59% improvement in our adjusted EPS compared to last year's third quarter, reflecting the high margin contributions and operational excellence we continue to see as we execute our project's backlog.
Now, I'll address the balance sheet. Our total debt stood at $404 million at the end of the third quarter. We ended the quarter with cash and cash equivalents exceeding total debt by $707 million, a very robust net cash position, and $425 million better than we were one year ago.
Our cash available for general corporate purposes was $504 million at the end of the third quarter of 2026, up 150% compared to the year ago level.
In addition, our cost and estimated earnings in excess of billings, or CIE, as of September 30th, 2026, was $767 million. The lowest balance since the end of 2014 and a decline of 9% compared to $848 million as of September 30th, 2025, reflecting our significant continued progress and resolving and collecting on reduced number of disputed matters.
Our balance sheet has continued to strengthen throughout this year, and our sizable net cash position provides us with tremendous flexibility to allocate our capital efficiently and strategically.
Lastly, let me update you on our latest assumptions related to our increased 2026 guidance. GNA expense for 2026 is expected to be between $380 million and $400 million.
Depreciation and amortization expense is anticipated to be approximately $45 million in 2026, with depreciation at $43 million and amortization at $2 million.
Interest expense for 2026 is now expected to be between $40 million and $42 million, of which about $3 million will be non-cash.
Our effective income tax rate for 2026 is expected to be approximately 26% to 29%. We now anticipate non-controlling interest to be between $65 million and $75 million. We expect approximately 54 million weighted average diluted shares outstanding for 2026, and capital expenditures are anticipated to be approximately $125 million to $135 million, with the majority of the CAPX in 2026, or approximately $75 million to $85 million, being owner-funded for large equipment items on certain large new projects.
Thank you, and with that, I'll turn the call back over to Gary.
Gary SmalleyCEO and President
Thanks, Ryan. To summarize, we delivered record financial results for the third quarter and through the first nine months of 2026, highlighted by the largest quarterly and first nine months of operating cash flow ever, record revenue that reflected strong double-digit growth, record operating income that was more than triple last year's third quarter results, solid segment operating margins, very strong earnings, and continued backlog growth.
As I mentioned earlier, this was the seventh consecutive quarter that we have reported extraordinary financial results. Our near-record backlog, together with the $200 billion-plus pipeline of project opportunities, provides us with great confidence in our ability to deliver double-digit revenue and earnings growth to continued strong cash flow in 2027 and beyond.
Our business trajectory has been and continues to be fantastic, and our results this year reflect strong operational performance and the excellent revenue earnings and cash flow potential embedded in our backlog.
Given our country's multi-decade history of under-investing in its infrastructure, a trend that has finally begun to reverse in recent years, we expect that strong customer demand, favorable macroeconomic tailwinds, and solid public and private customer funding will persist and continue to support and abundance of bidding opportunities well into the future.
We firmly believe that Tutor Perini offers a compelling value proposition for investors, especially when you consider our record financial and operating performance to date, our near-record backlog, the massive pipeline of bidding opportunities over the next several years that should sustain our long-term success, and the recent significant pullback evaluations across the stock market. We are confident in our future trajectory, which we believe will be propelled by the outstanding earnings and cash flow potential embedded in our backlog, and we expect to continue benefiting from generational investment opportunities to refresh and modernize the US infrastructure.
Thank you. With that, I will turn the call over to the operator for your questions.
Questions and answers
Thank you. We will now be conducting a question and answer session. If you would like to ask a question, please press star 1 on your telephone keypad. A confirmation tone will indicate your line is in the question queue. You may press star 2 if you would like to remove your question from the queue. For participants using speaker equipment, it may be necessary to pick up your handset before pressing the star keys. One moment, please pull for questions. Our first question is from Adam Thalheimer with Anson & Davidson Company. Please proceed with your question.
Adam ThalhimerAnalyst, Anson & Davidson Company
Hey, guys. Congrats on the strong Q3.
Gary SmalleyCEO and President
Thank you, Adam. Thank you. I want to start off with data centers. I know you won two small jobs earlier this year. I'm just curious how much of a focus is that area for you going forward?
Yeah, thank you, Adam. Look, you're right. We booked a couple of projects, about $70 million. If you look at the backlog that we have, that status center related, and that is not, it's . 2% of our backlog as of the end of September. So very negligible. However, having said that, you know, we'll continue to look for selectives and opportunistic opportunities. We have talented resources. There's a shortage of electricians to do the data center work.
And, you know, the demand sometimes comes our ways that did with these projects, and there are a few more that appear that they might be in the pipeline. But, look, with the, just immense pipeline, you know, I mentioned the $200 billion plus of opportunities and, you know, the traditional infrastructure opportunities that we're used to pursuing and that we excel in. Data centers is not going to be focused for us. Can we do the work? Sure, we can do the work. But, you know, why should we with all the opportunities we have in front of us in the more traditional work?
Adam ThalhimerAnalyst, Anson & Davidson Company
Got it. Okay. And then you said double digit revenue growth next year. I'm curious as you look at the revenue next year, how much of that sales is already in your Q3 ending backlog?
Gary SmalleyCEO and President
Really a lot. I won't give you the exact percentage, but we'll say more than three-fourths. You know, that's a very high percentage in our industry. In fact, I would say that if I look back at 2026, when we put the budget together for 2026, that was probably the highest, you know, level of certainty that I had seen in backlog in my career. And I've been doing this for, you know, 35 years in the industry.
And in 2027 is going to be similar in that we're going to have a very strong opportunity just to execute the work that we have and can have this double digit growth. You know, just a matter of how high of double digit growth we have from our opinion, because we think it's, you know, we have this visibility because of these huge awards that we booked in recent years.
And that's going to go on for some, some time still. And some of that work has not fully kicked in, you know, has it fully ramped up. So as that continues to ramp up and the work that is already ramped up continues to produce, you know, revenue margins and cash, then it's only going to improve from here.
Last one for me, operating segment level operating margins have been great this year, particularly in civil and in building.
Curious if you think that there is additional improvement possible over the next couple of years. Yes, there absolutely is. In fact, there could be improvement. I'm looking for improvement for 2027, really. You know, we've talked internally. We've guided in the past, you know, certain margin ranges for the various segments. And giving example with with civil segment, you know, we've been guiding 12 to 15% for the last few years. You know, going back a few more years ago, it was eight to 10%. But we lifted that up as we saw the change of landscape where we were getting work with better terms. And the competition was diminishing.
As I look forward, you know, we're what 14%. I think you're today right now in civil. I think that as we go forward, I see upward pressure on that. So, you know, we've talked recently about maybe we shift that margin up a little bit, but I'd really rather wait a quarter or so just to make sure. But I see a very good chance that in the short term, as well as a medium term, that we're going to see margin elevation, not just for civil, but for the others as well. Building really depends more on a mix of things.
Specialty, you can see that we really improve the margins. Again, this quarter, you know, what about three and a half percent and, you know, up what 50% or something like that from the second quarter. And that is a little short still where we want to be in the five to eight percent range. I will tell you that the work that we're executing specialty right now, the newer work exceeds or at least meets that range. So, we're very comfortable with the new work that we're generating.
The reason the margins are not quite where we need them to be is because we still have some legacy things, you know, really more minor on the specialty side that come trickling through that we continue to settle. And sometimes, you know, where we settle that, sometimes it's at a profit, sometimes it's not, it's never material. But it does have, it does put a little bit downward pressure on the margins. So as those legacy items continue to rotate off, you know, we'll continue to see margin expansion and specialty and get into that five to eight percent range sometime in 2027.
Adam ThalhimerAnalyst, Anson & Davidson Company
Oh, good color. Go ahead.
Thank you. Our next question is from Min Cho with Texas capital securities. Please proceed with your question.
Unidentified AnalystAnalyst, Texas Capital Securities
Great. Thank you so much. Congratulations on a really good quarter here. My first question has to do with the value of your bids outstanding that are awaiting awards. I think Gary mentioned about a billion for black construction, but just curious how much you have out there across all of your businesses.
Gary SmalleyCEO and President
Yeah. Yeah. So I mentioned black. I said it was, as you mentioned, almost a billion just to put it in perspective. We have two in the region that we think we're well positioned for, and they're about $200 million each. And then we have another one that's just a little short of $600 million that also we feel that we're well positioned for. In addition to that, you know, we've talked for some sometime a couple of years now about work that we have in pre construction on the building side and that that work. Usually there's about a ninety seven to ninety nine percent likelihood that it manifests itself in the backlog, you know, going forward.
We have over the next call it 12 to 15 months. We have another three quarters of a billion dollars roughly in that type work that we would expect. To make its way to backlog. And then there are others other things here and there. And some of the other business units, but, but not to that magnitude. So, you know, somewhere around two billion dollars of things that at any point in time could. Could result in backlog, especially the black work because that's been outstanding for some months and we're hoping by now that we would. We'd hear positive news on those things, but we'll continue to be patient.
You know, things are moving in the right direction and this will just make things even better when it hopefully comes our way.
Unidentified AnalystAnalyst, Texas Capital Securities
Excellent. I know that black construction is a very important part of your business tends to be smaller, but very high margin. Can you talk a little bit about the capacity that you have there? If you do win these awards, are you able to kind of schedule work? I know that you were talking about growing this business. Just any update on the progress in terms of adding head count there.
Gary SmalleyCEO and President
Yes. You know, we're in a constant recruiting mode in along with a variety of fronts, including there. Right now we have capacity of the four point six billion dollars of opportunity that we've talked about coming up the next couple years or so with a billion of that pending. You know, we could probably hold right now three billion dollars of that work or three and a half billion, maybe.
But, you know, we are looking at putting more talent in black. We have some things in the works. In some cases, it's internal talent that would be moving there. So we're real excited about what what black offers. It is just a phenomenal operation. You know, the four point six billion. That's only going to grow. The only reason it might not, you know, when we report in the future, maybe you won't hear it growing because things will be.
You know, going into backlog and it will be coming out of the pursuits, but they're going to be more and more pursuits.
Unidentified AnalystAnalyst, Texas Capital Securities
Excellent. And then just a quick question for Ryan. Obviously, again, you're operating margins have been very strong across all of your segments. When you look at just even the fourth quarter, should we expect margins, especially on the civil side to come down a little bit due to seasonality or could we actually see it maintain kind of third quarter levels or even be up just based on the timing of the project laughing.
Ryan SorokaExecutive Vice President and Chief Financial Officer
Yeah, I mean, look from a from a forecast perspective, obviously, there's seasonality. And then you think about the, you know, particularly strong winter that's expected with with El Nino. So I think there's a little bit of headwind there. But at the same time, I think there's, you know, there's still opportunity to continue to perform. So, you know, if I'm trying to look at it sequentially, I think two, three is a good barometer.
For for Q four, and that could pick up or tick down just based on some of the, some of the impacts that we talked about.
Unidentified AnalystAnalyst, Texas Capital Securities
Thank you. Thank you.
Thank you, man. Our next question is from Michael Dutas with vertical research partners. He's pursued it through question.
Michael DudasAnalyst, Vertical Research Partners
Good afternoon. Well done, gentlemen.
Gary SmalleyCEO and President
Thank you, Mike. Thank you, Mike.
Michael DudasAnalyst, Vertical Research Partners
So, Gary, you've booked $16 billion in ordinary, large projects in an environment where pipeline was much, much lower than this today. As you look out the next three to four years, can you get a sense of how to how we can scope that, give it a limited competition and how confident selective you are. Some of these major things that you have, you cited this month, I'm sure going to come out over the next six months.
Gary SmalleyCEO and President
Mike, we're confident we're going to get our share of what's out there. You know, we think more than our share, you know, there was a stretch where when we booked at 16 billion, that's made up of nine projects. And I think it was something like we won nine out of 12. I don't expect the same type of hit rate, but, you know, when you when you start to become, when you when you start to get the work, you can be a little bit more greedy and how you approach things. We we did this work at high margins and then as time went on higher margins and still higher margins and that's really our approach. So we expect not, you know, that we won't win every one of them, but look, we're well positioned for a few very large programs that are coming out and some are accelerating beyond what we had expected.
So we feel really good about, you know, building the backlog from here and building it in a profitable way.
Michael DudasAnalyst, Vertical Research Partners
Very helpful. And then, you know, Ryan, you can generate a cash flow machine that you got, you're driving over there. How is that going to help bid? I assume like you're going to be soul sourcing many of these big projects with security support, et cetera, given your very strong financial profile. So many of these larger projects, I guess, scarier talk about that you'll be needing to invest your partners unless there's some technical aspects that you may want to assume.
Ryan SorokaExecutive Vice President and Chief Financial Officer
Yeah, that's certainly the intent, obviously, you know, with the cash balance. But at $1.1 billion as we sit here as of the end of September, that was certainly the intent is having that strength going into those bids and certainly approaching it to, you know, to the extent we came from from a soul source perspective. From, from our perspective, that's a pretty good return, you know, keeping that, that not controlling interest in house.
Michael DudasAnalyst, Vertical Research Partners
Well, thanks, gentlemen.
Thank you, Mike. Our next question is from Liam Burke with the Riley securities. Please proceed to the question.
Liam BurkeAnalyst, Riley Securities
Thank you. Good evening, Gary, Ryan, or aye.
Gary SmalleyCEO and President
Hi, Liam. How are you doing? Good. Thank you.
Liam BurkeAnalyst, Riley Securities
Could we get some color on pre construction activity? You talked about it in previous quarter to be pretty elevated. Has that past pre construction activity rolled in the backlog, or is that something we could anticipate for the for 2027?
Gary SmalleyCEO and President
Yeah, Liam, the pre construction activity, if you go back to maybe two and a half years, something like that. During over that period of time, you know, when we first started talking about pre construction activities, we put about $3 billion of, of, you know, that that work into backlog. And I'll say that every prospect that was in pre construction turned into backlog other than those that are still pending. And as a comment, a few minutes ago, we still expect probably about three quarters of a billion, so $750 million roughly over the next year to 15 months.
And that will, and maybe, you know, year, 15 months, 18 months, something like that, that should come into backlog as well from pre construction activities. Now, what we're, we're seeing also is now start to see more opportunities of things going into pre construction. So we'll start to replenish that a little bit. We've been working down a four billion, four and a half billion dollar amount for some time with little, you know, dribs and drabs going into pre construction. I think we'll see more going into pre construction. So after this, you know, 12, 15, 18 month period, we'll, we'll still have things that will be going into backlog from pre construction.
So the pipeline continues there too.
Liam BurkeAnalyst, Riley Securities
Great. Thank you. And getting back to specialty contracting. You have a little, you talked about a little bit of external work, but very profitable work that you're doing for projects for civil. Is there a capacity challenge that you see based on your opportunity pipeline?
Gary SmalleyCEO and President
No, we're, look, you know, there are some shortages of electricians around the country in certain pockets, but we are very good with that right now. We are not facing any shortages there. And we don't anticipate having those issues, but at the same time, we're always trying to manage to make sure that we stay ahead of the curve.
And with the work that we have, you're right, it's very profitable. The work that we have in house that is supporting, you know, primarily civil projects, but also building projects. And then in some cases, it's third parties as well. Everything that is, is, you know, has been awarded in the last, you know, two, three years is performing extremely well.
Liam BurkeAnalyst, Riley Securities
Great. Thank you. Thank you.
Thank you. Our next question is from Steven Fisher with UBS. Please proceed through question.
Steven FisherAnalyst, UBS
Thanks. Good afternoon. Just wanted to ask you about the, the black construction work. Sounds like some of that activity has been sort of in process for a while. Any particular uncertainties that perhaps federal budget or anything that that's holding that up. And then I guess similarly on the, the civil side.
Curious what you're hearing from transportation agencies about funding situation and whether uncertainties there about policy may be kind of holding up any or elongating the awards process.
Gary SmalleyCEO and President
Yeah. First part of your question, you know, we're not anticipating. Well, there's a lot of work there. The, you know, the biggest amount of the work that's pending right now. There's some environmental reviews that need to be completed. And then that will, you know, allow those projects or this, you know, large, particular project to be, be awarded.
You know, it's, you know, that, that region, the Indo-Pacific region is a very important part of our company and a growing part as, as you know, following us over the past few years. But it's even more important to the, to the country, to the United States. The, the feds, you know, Pacific deterrence initiative and working with, you know, the, the federal government and this, this part of the world. These programs are not going to be derailed. They won't be, you know, defunded in any way. And it is something that both sides of the aisle agree upon the importance of it. So, you know, there may be some delays, what we're seeing, you know, from time to time.
And, you know, sometimes it takes a government a while to make a decision. But, but this work is, is going to proceed. And as I mentioned, just a few minutes ago, there's going to be more of it than the 4.6 billion we're tracking right now.
Steven FisherAnalyst, UBS
And then on the, you know, the second part of your, your question could repeat that again. Just on the, the civil side, what you're hearing from transportation agencies in terms of any particular uncertainties around funding and highway policy, et cetera, that may be holding up a word.
Gary SmalleyCEO and President
Yeah, there's, there's nothing holding up a word right now. You know, most of what, what we're doing, most of the funding is coming from the state level and that's full steam ahead on the federal side of things. What we have read and what we've heard is that there appears to be some momentum and maybe that momentum will increase based on the results of the, of the midterms for a new transportation bill and additional funding. So, you know, we, we are in great shape if there is no more federal funding, but expecting that there will be some more.
It's going to really just add to the, the outstanding position we have in the backlog that we, we currently have. We have not factored that into guidance and consideration of when we talked about 20, 7 and a whole digit growth. You know, we're not assuming any additional funding coming from the, from the feds, but I would expect that to be quite honest with you and that should be, you know, should be another positive. As we look at 20, 27 and beyond.
Steven FisherAnalyst, UBS
Great. And then just, you know, with the, the backlog that you have today, you mentioned earlier that you're still ramping up on some of these programs. Curious if there's any way to frame, I don't know, when you think you'd hit a peak level of burn just to kind of gauge when we might be able to start thinking about having some visibility to taking in some of the contingencies that you have. Do you think, you know, you'd still be ramping through all of 20, 27 and maybe you're not even going to hit kind of a full burn rate on these in 20, 28. I'm just curious how to kind of frame the duration of this ramp.
Gary SmalleyCEO and President
Yeah, I think if you look at what we currently have in backlog, then I would say that the peak is probably somewhere in 20, 28, maybe the latter part of 20, 28, something like that. But keep in mind that when you come off the peak, it's not, you just don't follow the nothing for the peak. It starts to wind down after the peak. If we were not to book anything else after the peak is still going to be, you know, very good times for us. But, you know, certainly between now and then we're going to be booking other work and that work is going to be profitable and it's going to replace some of the work that burns off as well.
So I wouldn't say that 28 would be a peak for the company that we would never be able to grow from. I'm just saying that based on the work that we have right now, but I would say we're going to continue to grow beyond 28 also.
There's just too many opportunities and we're well positioned, so well positioned on too many of them for us not to continue to grow.
Steven FisherAnalyst, UBS
Thanks, Gary.
Thank you, Steve. We've reached the end of the question and answer session. I would like to turn the floor back over to Gary Smalley for Colleen Convin.
Gary SmalleyCEO and President
Thank you, everyone, for your interest in participation today. We look forward to continuing to deliver shareholder value, strong shareholder value, and also reporting an eight consecutive quarter about standard results we speak to you again next time. Really excited about where this company is. We've come a long way over the last few years. A lot of you have been with us for a long time and waited for this story to develop. We appreciate your patience and you can see the good things coming together now.
I keep saying that this is just the tip of the iceberg or make comments. There are a lot more good quarters to come. I really believe that as we continue to have this wonderful visibility into our future of work and we continue to even surpass our high expectations. So we hope to continue to create value and to demonstrate that your faith confidence and patience with us was the right thing. So thank you again and we'll talk to you soon.
This concludes today's teleconference. You may disconnect your lines at this time. Thank you for your participation.
Other Tutor Perini earnings calls
- Q2 2026 earnings call
Management framed the quarter as evidence that newer mega-projects are lifting margins and cash generation, with disciplined bidding supporting longer-term growth.
Aug 05, 2026Confident0.88