Management framed Q3 as evidence that Zgounda is at cruising speed, with costs improving and Boumadine development accelerating.
- 435,000 tonnes of stockpile provides about 100 days of mill feed ahead of planned 2027 mine sequencing.
- The company raised Zgounda’s lower production-guidance bound but left Boumadine guidance and cost guidance unchanged.
- $30MA 383,000-ounce shipment timing difference shifted roughly $30 million of earnings from Q3 into Q4.
Guidance
- 5.8M5.6–5.8 million ounces Zgounda production for 2026
- 1M1 million ounces Boumadine production for 2026
- 6.8M6.6–6.8 million ounces consolidated production for 2026
- $17$17–$20 per ounce Zgounda cash costs expected in 2027
What analysts pressed on
- 012027 stockpile use: management expects it to remain broadly stable despite a temporary decline during a three-month pit pushback.
- 022027 production sequencing: management does not foresee a production drop and expects execution to track the published mine plan.
- 03Q4 unit costs: higher stripping, around 14 versus roughly 11, could lift costs slightly but not significantly.
- 04Zgounda cost trajectory: management expects 2027 stripping around 16 or 17 and costs near the $17–$20 bracket.
Notable disclosures
- 383,000 ounces of finished silver inventory had not been recognized as revenue at quarter-end and was shipped immediately afterward.
- $30MRoughly $30 million of earnings sat in inventory and was expected to affect Q4 results.
- The feasibility study is being designed around 10,000 tonnes per day, versus 8,000 tonnes per day in the PEA.
- Management expects to drill close to 220,000 metres at Boumadine by year-end after completing the 180,000-metre program early.
Risks raised
- Zgounda’s planned Q4 stripping increase to around 14 could raise unit costs slightly.
- 2027 stripping at Zgounda is expected to rise to around 16 or 17, pressuring costs toward the $17–$20 bracket.
- A three-month open-pit pushback in 2027 will temporarily reduce ore mining and draw down the stockpile.
Tone: Confident 0.82
Management emphasized record operations, a raised production floor, strong liquidity and accelerating Boumadine development, while acknowledging cost and shipment-timing effects.
Who spoke
Company
- Elizabeth HamouiInvestor Relations
- Benoit LassallePresident and CEO
- Raphael BeaudoinExecutive Vice President of Operations
- Unidentified Management
Analysts
- Don DeMarcoAnalyst, National Bank
- Unidentified AnalystAnalyst, SCP Resource Finance
Full transcript
Analyst questions are marked with a bar. Timestamps are into the recording.
Prepared remarks
Good morning, everyone.
Elizabeth HamouiInvestor Relations
I'll now turn the call over to Elizabeth Hamoui, Aya Gold Silver's Director of Corporate and Financial Communications. Please go ahead.
Thank you, Operator, and welcome to AYA's third quarter 2026 earnings conference call. Joining us today are Benoit Lassalle, President and CEO, Hugo Landry-Tolstchak, Chief Financial Officer, Elias Elias, Chief Legal and Sustainability Officer, Raphael Beaudoin, Executive Vice President of Operations, and David Allon, Executive Vice President of Exploration. We will refer to a presentation available via the webcast and on our website. As we will be making forward-looking statements during the call, please refer to the cautionary notes in the presentation, news release and NDNA, as well as the risk factors in our annual information form. Technical information in the presentation has been reviewed and approved by Raphael Baudoin, IAS Executive Vice President of Operations, and David Lalonde, IAS Executive Vice President of Exploration, both qualified persons as defined under National Instrument 43101, Standards of Disclosure for Mineral Projects.
And following the presentation, we will have a Q&A session. I would now like to turn the call over to Benoit Lassalle. Benoit?
Benoit LassallePresident and CEO
Elisabeth, thank you. Welcome everybody to our Q3 2026 call. Q3 was another record quarter for AYA, with the secondaire and the Boumadzin reclaim operation each achieving the highest production to date. Our operation initiatives are paying off, delivering more scale, lower cash costs, and solid cash flow. In the quarter, we've also provided you with an updated PEA on our Boumadzin project, which was showing stronger economics and a longer mine life. Further, we also presented two acquisitions where we've added new permits to the portfolio.
So let me take you to the PowerPoint presentation that you have, slide number five, as we do every quarter, just to review quickly the KPIs and the operation for the third quarter. So if you go to slide number five, you see that we had an excellent quarter where revenues are up 90% year over year from $54 million, achieving this quarter in 2026 $103 million.
Net income went from $12 million last year to $35 million, an increase of 182%. operating cash flow went from 22 million last year up to 48 million this year an increase of 115 percent on the right hand side you see the production profile q3 last year we were at 1.3 million q2 of 2026 we were at 1.7 million and in q3 previously announced we are at 2.0 three million ounces for the quarter. So the production is up 51% year-over-year or 11% at secondaire and 21% on a consolidated production profile. So very strong quarter financially and we will come to that but where and I indicated at the beginning where we are managing costs and costs are coming down regardless of the increase in oil currently our costs for Q3 were lower than our costs in Q2 moving to slide page six this is the following slide two KPIs that we've been following from the beginning from the ramp up of the mine in 2025 we've been following the mining tonnage and we've also been following the milling rate.
So mining tonnage were steady currently, as you can see, at 4,700 ton a day and coming from the open pit. The open pit had a record performance this quarter with 3,500 ton per day. That is really a record performance for the quarter. And we do have a lot of leeway because we now have stockpile of run of mine stockpile of 435,000 tons. So that is 100 days of processing. Because on the right hand side, you see the milling rate in Q3 was 4,100 tons a day. You know that our objective is to go towards 4,000 to 4,003 a ton per day, but for Q3 of 2026, we were at 4,100 ton a day average. So when you have a stockpile of 435 tons, that says that we have 100 days of milling feed already mined beside the crusher and ready to be processed.
So this is a beautiful inventory that is there, which is a security buffer. Not that we expect anything, but we know that next year we'll have to do some underground development. There's a pushback to be done for the open pit. But that being said, we have a full supply of ore available that's already been pre-mined. On top of that, we have 1 million tons of lower-grade material, which is just on standby.
Going to slide number seven, always very interesting, is the average selling price. So at the Gunder, where we produce, you know, 1.5 million, you see that the average selling price for Q3 was in line with Q2 at 69.32. we all know that towards the end of Q3 it was a little bit lower it was better at the beginning of Q3 but we did average first wound there an average selling price of 69 32 and we were able to reduce our costs to $17.46 cash cost you know to that for an ASIC you had about $3 and but we are extremely pleased with all the initiatives of cost reduction and and really you know as we are as I always say at cruising speed now as good there if you go back to the 43 101 report it's good there will be producing approximately 6 million ounces of silver per year for the next 11 years and the life of mine cash cost is $16.26 and 26 cents.
So, you know, we're still above life of mine cash costs. We expected that because we know that the life of mine cash costs, that the cash costs will be reducing towards the later years. So we have a strong operation at Gundere. It's running extremely well. We are working on cost management and cost reduction while we know that on a going forward basis, we are at 6 million ounces per year of silver production. Going to slide 8, the Boumadzin pyrite reclaim operation. You recall that we were looking at about 2 million ounces of production over two years. Last quarter of 2025, all of 2026, and probably three quarters in 2027. We had to move 240,000 ton of ore that was mineralized.
And Q3 was an excellent quarter. Q1, Q2 were a little bit lower because of weather-related incidents. But Q3 was an excellent quarter. And we did move 50,000 ton up 191% quarter over quarter. This is kind of now a run rate, assuming good weather, obviously. we also have utilized a bulk shipment to ship the tailings to Asia, and that worked very, very well.
And so we are on track to meet our guidance. On the right-hand side, you see that the silver equivalent production for the quarter was 536,000 ounces. Sale are at 492,000 ounces. So, of course, there's always a little bit of lag between the shipment and the sale, but an extremely profitable operation. The realized price per ounce of silver equivalent is $34 because we do get a payability of 50%. Don't forget those are tailings with nasty elements, and we're shipping them to Asia to a smelter. So the payability is 50%. you recall that the payability at Boumadine when we will be in the full operation with the pyrite is more like 83 But But for the tailings the payability is 50 percent and the cost the cash cost per round is around ten dollars So extremely profitable operation as we're cleaning the site because these tailings are right over one of the structure that that we will be mining starting in 2030.
On slide number nine, you see over the year of 2026, how cash has changed. We started the year with the cash position of 136 million. We're finishing the quarter, because it's the third quarter, with a cash position of 184 million. And that does not take into account the restricted cash that we have with EBRD of $16 million.
But you see the waterfall of where the money came from. We generated $163 million of cash flow, which also included $54 from Q3. Then we had some working capital changes. We have investment, which we all know is in expiration. a little bit of sustaining capex, but mainly expiration of Boumadine and of Zgunda. Financing is the repayment of EBRD, which we are accelerating the repayment of EBRD. We have paid down $15 million in Q2, 2026.
And so we have now a net position of $184 million. We have a very strong balance sheet. We have very strong ratios. When you look at our balance sheet, a total asset of about 700 million and an equity of 500 million. So it's a very pristine balance sheet, strong to be positioned to develop Boumadine with our own liquidity. The year today on slide number 10 is very interesting. You see the operational performance. So we have a consolidated production of 5.2 million ounces and a consolidated cash cost of 1682, which is excellent. Production is completely aligned on our guidance. Cash cost is a little bit lower than our guidance. So we are aligned with what was presented to you at the beginning of the year.
Zgunder is at $4.3 million currently and $17.97 on its cash cost. And Boumadzin is at $0.9. You know that our guidance was $1 million. So we're at $0.9 of $1 million. So we're very close with a cash cost of $10.56. So year-to-date revenue, we're looking at $317 million. where you have a net income after tax of $119 million.
So it's an extremely good business when your net income after tax is one-third, I mean, plus or minus. So it's 33% net profit margin, extremely, extremely good business, and operating cash flow for the first nine months at $167 million. So it's extremely strong. And I need to point out to you something, which you saw when you read the press release, is at the end of the quarter, we had in inventory 383,000 ounces of silver that was ready to be shipped, that was not yet shipped for processing in Switzerland. It just got shipped immediately thereafter.
And so it's a very small time difference, but that $383,000 of finished goods have not been accounted for in revenue. They're at cost on the balance sheet. So it's something that was sold immediately thereafter. It was not that we were holding on. It was a matter of shipment and some changes in the procedures. And so it's something that got done at the beginning of Q3. So obviously, you can now imagine that the revenue for Q3 were excellent, but now it was sold in Q4. So you can't expect Q4 to be a regular quarter and 300,000 ounces of revenue.
production that came from Q3 that is now or was sold in Q4. And coming to the guidance, well, we know where we are today. We know what we're going to be doing in the fourth quarter. So we've upgraded our guidance, and we are increasing the lower end of the guidance. at Zgundan. At the beginning of the year, we told you that the guidance should be between 5.2 and 5.8.
Today, we're extremely comfortable to say that now the guidance is between 5.6 and 5.8. We are really progressing very well to be right in the upper part of our guidance, and that's why we've made a change to the guidance at Zgundan. At Boumadzin, we're leaving it at 1 million, though we're currently at 900,000 ounces, we're leaving it at 1 million. And we're not, same thing with the cash cost, we're not upgrading that, though we are right on guidance for Bumazin and a little bit below guidance for Segunda, but we're not upgrading that. The sustaining growth is similar and the exploration expenditure program is similar. So you have now a new guidance, which is a little bit tighter due to the fact that we're in the 11th month of production.
So we have a much tighter guidance between 6.6 and 6.8 million ounces for the year 2026. So coming to slide number 10, what are our strategic priorities at the moment? Well, in the recent press release, we indicated to you that we have completed the 2026 drill program at Bumazin. We've drilled in 10 months and I have to say congratulations to the team that has done this. We've drilled 181,000 meters of a 180,000 meter program and we've done that in less than 10 months because you know we didn't start in January precisely on on day one so it's been a fantastic accomplishment now we're not slowing down the drilling we're keeping the 16 drills I think there's even another one coming so we're keeping the drills turning and we will probably finish the year approaching 220,000 meters of drilling at boom I think you know that the boom I didn't program was planned over two years at 360,000 meters which is all the infill drilling of the three main zones that we know that are included in the PEA and so those three main zones are being infill drilled so that we can move the resource from inferred to MNI so that in the feasibility study that we're working on we do have M&I in the feasibility study so that is ongoing furthermore in the feasibility study things are progressing extremely well the water pipeline the where it's going to go is all done we're working now on finishing the detail same thing with the power line that's done and we are working with the government on the construction of this power line we have to finish the detail engineering same thing with the water pipeline the the power line is ongoing we have secured the land for the village and the building that we're going to be building so all of that is is done and progressing we have identified where the tailing dam is going to be so that's also something that's being done and at the beginning of next year we will be updating you on you know detail engineering a selection of contractor for open pit mining selection of EPC contractor and all of that so it is ongoing the feasibility study every chapter is ongoing and it's progressing as quickly as we can I know often in meetings when we present to you shareholders or to our analysts say how can you accelerate can you go faster when can you start ordering the long lead item though we are at maximum speed there's a sequence of finishing each chapter in the feasibility study getting you know detail engineering done so we have the proper sizing of the equipment.
You know that the PEA was done on 8,000 ton per day The feasibility is being done on 10 ton per day So we will be increasing the capacity of the plant And as we did at Gunders when we did a nameplate of 2 you know that today we're operating at 4,100, hopefully going to 4,300. Our philosophy, our construction philosophy is going to be the same. It's a much bigger project, but we're always building, thinking that we could get bigger. At Gundam, the priorities is executing the plan. We have the 42-101 plan that's been filed and you know it's just now increasing the throughput with a tertiary crusher that is being installed and will be finished by Q1 of next year.
The open pit development, the pushback, the underground development, all of that is being done. We've completed the work on our tailings dam to increase its capacity. So Zgunder is an aircraft at 35,000 feet. It's cruising. It's minimizing its cost. It's optimizing production and going extremely, extremely well. We're also adding a lot of ground at Zgunder. We're using also AI on geological interpretation, and we're also adding a lot of ground at Boumadzin. So all of that is the two main items that, you know, where we're working currently is really the optimization of Zgondé and the development of Boumadzin. Now, talking of Boumadzin, we updated the PEA.
We've presented that to you over and over. Again, slide 13 summarizes it. It's a tier one asset. The PA takes into account only three years of drilling. Yes, we have drilled 180,000 meters, but that's not in the PA. The drilling that we've done so far is going to come next year when we do the feasibility study. So the PA is done on three years of drilling. It's a tier one asset. it's got fantastic economics because it's a low capex we can build this project for less than 500 million it has a payback which is extremely quick it's low risk because it's very simple three payable concentrate one zinc one lead and one pyrite you recall it's got 43% sulfur in the in the ore, which is what is needed for sulfuric acid.
So it's a low-risk, standalone model. We can fund this ourselves through equity that we have, or through cash flow, I should say. So we can fund this through cash flow. And we do have debt that is available with our bank, EBRD, with our offtakers. so money is available to complete the funding if there is a funding gap it's it and that is based on the price of silver going forward over the next three years proven track record in the region we build good there on time and on budget we've done it you know and good and good there is a showcase it's a beautiful success and the last item which we all know it can be crucial is permitting and we have the permit in hand for this project this is why the investment decision is made this is why before the feasibility is done because we have the permit we have the money we have the geology we have the mine plan now we're heading into detail engineering but we are going ahead with this project.
On slide 14 you have the key financial elements with an after-tax NPV at 5% discount rate of 3.5 billion and an after-tax IRR of 93% which is extremely rare in our industry knowing that this is only three years of drilling. This is the beginning. This is three years of drilling. You know the average age a time to start the construction of a project is like normally it's like 15 years in a poly metallic project this after three years we're starting construction after seven years it will be an operation which normally is 20 years so you have very strong economic very low initial capex fantastic capital efficiency ratio of 7.6 and that is at the base case it will produce for the first five years 350,000 ounces of gold equivalent and it has a 14-year mine life and will generate close to five billion of free cash when you look at slide 15 you have it as you know different scenario the break even of that project is $1,700 gold and $24 silver that has kind of a you know break-even point if the base case we saw the results it's extremely strong and even if you go down 25% to $2,600 gold and $38 silver you still have 57% IRR and if you go up 25% to $4,400 gold and $67 silver then your IRR is 128% that was the spot price at the time when we did the study so you see it's a very unique very robust project with fantastic economics to be built in an area that that on an ESG a front is extremely hospitable easy to build no population to move so it's it's it's quite straightforward we are permitted and in-country you have the manpower to do this and we're going to be using many of the same subcontractors that we use for a secondaire and and one thing we've been saying on page 16 is we will be expanding our footprint in Morocco we believe and I believe that Morocco is a tier one jurisdiction for mining it's extremely hospitable then you know the mining code is very good the the government is supporting the mining sector you have employees that are available you have power from the grid you have water from either underground water or from the local communities it is infrastructure I joke often saying it's a bit better than Canada you have bullet trains you have great international airports and so we are increasing our footprint so we have made acquisition where we bought some permits from families that had those for years did a little bit of work but did not have enough financial strength to do more work and also did not have all the tools that we have with with technology and and satellite imaging and spectral geophysics AI so all of that now we're applying to all these new permits good mean is agora I Agadir, Melul, TZ, and these are new permits.
We've announced last week that Azegur, we sold it to a new company or to an existing company called Sama Resources, whereby we will own 19% of Sama once the transaction closes. So we are managing our portfolio extremely well. We sold EZEGUR because it's a copper and tungsten, something we do not want to get in. But we're very happy to have a subsidiary now at 19% that will be a copper-tungsten subsidiary. So we're extremely happy with this transaction. And we are continuing to add to the portfolio. We will be announcing more permits in the coming few weeks and few months, we are continuing to add to the portfolio because people are now realizing that Morocco is a tier one jurisdiction.
It has a tier one geology. It has tier one employees, tier one mining code. And therefore, in this world of mining, with rare earth and energy metals, it's definitely a place to be. So, this concludes my presentation. I will now turn it over to the operator for the Q&A period. Thank you.
Questions and answers
Thank you. At this time, we will conduct the question and answer session. As a reminder to ask a question, you will need to press star 11 on your telephone and wait for your name to be announced. To withdraw your question, please press star 11 again. Please stand by while we compile the Q&A roster.
Don DeMarcoAnalyst, National Bank
And our first question comes from the line of Dr Markham National Bank Your line is now open Thank you operator and good morning Benoit and team Benoit, thanks for all the additional color on the quarter. You know, looking at the sequencing that you mentioned, how much of that 400-plus thousand ounces on the stockpile do you expect to draw on in 27? And, you know, given this, should investors expect 2027 silver production to remain near the current life average, or could this sequencing create a step down?
Benoit LassallePresident and CEO
Thank you, Don. Thank you for your comment. Don, we have the whole team here. We're in Morocco. We had our Q3 board meeting in Casablanca, and Rafael is with us. And as you know, Rafael oversees the operation with the team here in Morocco. He's our executive VP of operations. So, Rafael, I would turn it over to you for Don's question on the stockpile.
Raphael BeaudoinExecutive Vice President of Operations
Yes, happy to talk about it. We have over 400,000 tons of ore already in stock. The plan for 2027 is to keep the stockpile stable. It might go down momentarily to go back up again. The idea is to keep it stable throughout the year. We have a pushback in the open pit that will lower the ore mining rate through several months, about three months. And the stockpile will diminish through that time, which is okay. That's why we have it well in place. But throughout the year, we don't expect the stockpile to go down, really.
Don DeMarcoAnalyst, National Bank
Okay. okay and then in follow-up then do you expect production in 2027 to remain consistent with life-of-mine averages or would it be given that the stockpile grades a little bit lower do you expect it to temporary step down in 27 as you look through this sequencing though we expect production to remain as a current state we are on track to deliver essentially the 43 101 we published last year and I would defer to that we're executing it quite well things are going to plan and I don't foresee I don't foresee a drop in production in 2027 okay great and then just final question you know costs have been very strong year-to-date you know well below the guidance range is there anything in Q4 maybe stripping inventory maintenance items that could raise the unit cost quarter-a-quarter versus the Q3 or you know what we've seen year-to-date So our stripping ratio, the low cost throughout the year, has been partially driven by the quite low stripping ratio that we had, around 11.
Raphael BeaudoinExecutive Vice President of Operations
Throughout the last quarter of this year, we have a planned increase in the stripping to around 14. So it might bring costs slightly higher for the fourth quarter, but not significantly. Proportionally to the slight increase in stripping for the last quarter.
Don DeMarcoAnalyst
Okay, that's helpful. That's all for me. Good luck for the rest of the year.
Benoit LassallePresident and CEO
Thank you, Don. And yeah, thanks for the rest of the year is a month and a half. So we're ready. Thank you.
One moment for our next question. Again, as a reminder to ask the question, you'll need to press star one one on your telephone. Our next question comes online with Omid Singh of SCP Resource Finance. Your line is now open.
Unidentified AnalystAnalyst, SCP Resource Finance
Hi there. Thanks, Benoit, for sharing about the quota. I just had a quick question on Zegunde costs. You spoke to it a little bit earlier. Maybe if you could share a bit more on the drivers of costs coming down significantly and how do you see that into 2027, barring strip, of course, which was just talked about. But, yeah, just curious to hear a bit more about the Gunder cost.
Unidentified Management
We're having quite a good year at Gunder. As I mentioned, the lower cost so far year-to-date was mostly driven by the open pit strip. The long-term plan for stripping is around 13 in the open pit. And that's what we've been converging to as Gunder. The last six months have been lower than that. We expect next year to be above that, above the current strip. Next year is probably more around like 16 or 17, which is well in plan to our cost structure, again, that we've showed quite transparently in our 4.3 101. So we expect the cost to stay close to that $17 to $20 bracket.
Unidentified AnalystAnalyst, SCP Resource Finance
Thank you. Appreciate it.
Thank you. Thank you. Ladies and gentlemen, that concludes our Q&A period. I'll now turn the call back over to Ben Wall for closing remarks.
Unidentified Management
Yes, thank you very much. Thank you, everyone, for participating today at our Q3 conference call. Look, it was a fantastic quarter. We're on site. We are in Casablanca. The whole team is here. We're very pleased with the outcome. Obviously, we understand that the pushover of the inventory has affected a little bit the earnings per share because we have close to $30 million of earnings in inventory, which is just delayed by a couple of weeks or days. But, of course, we do manage on a yearly basis, and that will have a direct effect on our Q4. So we are extremely pleased with the quarter, pleased with the operation.
Ralph commented on the cost. There's been a tremendous amount of work to, as I say, to streamline costs as we are now in cruising speed. And we're extremely, extremely good at it. We have also moved quite a few individuals from the Zgunder operation to Boumadin because Boumadin is kicking in into real development. So some of the previous managers who were at Zgunder are now running the Boumadin project. So, look, we had a great first nine months. You know, we did the U. S. listing and that is done. And it's really an important part of the volume and the appreciation.
The Boumadin PEA, that was a big milestone. That was done in the quarter. The technical report, you've seen it. We do have drill results coming in. David is with us. And he knows that every month we have one press release from Zgoundé, one press release from Boumadin. The results are always stellar. You see them. we will push even more next year on step-out drilling.
David has a major task in doing the infill drilling. It is more than spectacular. It's done in 10 months, and we're continuing the pace. We're not slowing it down, which will probably allow us next year to do a lot more step-out drilling.
And that will continue. So, Scundere Exploration is continuing. Bumazine exploration is continuing. We have great results on both. So we look forward to a strong finish. We look forward to a great year. We're very pleased with the operation as they are and we're very pleased with Bumazine and the acquisitions that we've made. And you know what, the more ground we acquire, the more ground gets presented to us. So stay tuned because we are looking at your ground around Gunder, around Boumeddin that is presented to us on a, I would say almost on a monthly basis. So thank you again and I'll conclude in saying I always say there's three things about success in mining. First one is geology.
You know we have it and that slide, page 19, the geology of Morocco is absolutely fantastic. The people, well, we have a great group of employees, motivated shareholders, and they are aligned with the objective of the shareholders. And we'll close on jurisdiction. Morocco is a tier one jurisdiction in mining. We all know it's getting very difficult in some countries. And in Morocco, it's a tier one, and mining is a top priority. So when you have the three pillars of success, geology, people, and jurisdiction, all we need is a good silver market and a good gold market. At our end, we'll keep delivering a strong quarter next quarter and a strong year. So thank you very much.
See you in March because that's when we have the next call, when we'll have the year-end financial statement. In the meantime, we'll see you some this weekend in Frankfurt. others will see you in Geneva, in Zurich at the end of next week, in London the week after. So we are on the road leading shareholders. Thank you very much, and we'll talk to you very soon.
Thank you. Thank you for your participation in today's conference. This has concluded the program. You may now disconnect.
Other Aya Gold & Silver earnings calls
- Q2 2026 earnings call
Management framed Q2 as execution-led, with throughput gains, lower costs and strong cash generation funding Boumadine’s development and exploration pipeline.
Aug 14, 2026Confident0.83 - Q1 2026 earnings call
Management framed Q1 as a weather-disrupted but operationally strong quarter, emphasizing mining execution, cost control and self-funded growth at Boumadine.
May 14, 2026Positive0.68 - Q4 2025 earnings call
Management framed 2025 as a successful ramp-up, with a now-debugged plant and stronger cash generation funding faster development and exploration.
Date n/aNot scoredn/a - Q3 2025 earnings call
Management framed the quarter as an operational ramp-up largely delivered, with open-pit grade and costs still needing improvement before steady-state performance.