Freeport-McMoRan (FCX) Q3 2026 earnings call transcript

Transcript, summary, guidance, and what analysts pressed on from the Freeport-McMoRan call on October 27, 2026.

FreeSee Freeport-McMoRan's financials in GloomOpen in browser →Jump to the transcript
Held
October 27, 2026
Length
1 h 38 min
Tone
Confident0.78
Analysts
8
Words
11,531
2027 copper sales growth
over 20%vs 2026
2028 copper sales growth
10%
2027 gold sales growth
more than a 50% increasevs 2026
2027 U.S. leach copper
300 million poundsin forecast
2030 leach aspiration
800 million pound levelsubject to field results
Bagdad expansion capital
four and a half billion dollarscurrent dollars
Bagdad incremental copper
200, 250 million pounds a yearmanagement phrasing
2026 energy cost increase
500 millionvs 2025

Summary

Management framed the call around a strong copper-growth setup, emphasizing execution and technology upside while acknowledging operating and cost pressures.

  • 2027 first-half production should ramp, with second-half higher and Q1 likely the year’s lowest.
  • Gen 2 leach additives showed more than four times Gen 1’s incremental recoveries in lab testing, but field results remain unproven.
  • U.S. weather, Chilean slope management and Indonesian water availability tempered operating momentum and drove lower copper-sales estimates.

Guidance

  • 20%2027 copper sales growth over 20% vs 2026
  • 10%2028 copper sales growth 10%
  • 50%2027 gold sales growth more than 50% vs 2026
  • 20%2028 gold sales growth 20%
  • 300M2027 U.S. leach copper 300 million pounds
  • 800M2030 U.S. leach copper aspiration 800 million pounds
  • $4.5BBagdad expansion capital estimate $4.5 billion; expected completion around three and a half years from final decision

What analysts pressed on

  • 01Grasberg production cadence: first half ramps, second half higher, with Q1 likely lowest; Block 1 South contributes little in 2027.
  • 02Grasberg idle costs: essentially fixed costs shift into all-in unit costs in 2027 rather than disappearing.
  • 03U.S. recovery rates: mill recoveries vary with ore type; management gave no specific recovery-rate forecast.
  • 04Leach additives: current forecast includes 300 million pounds in 2027 and 2028, but not potential Gen 2 upside pending field tests.
  • 05Capital spending: higher 2027 capex partly reflects additional mining trucks, inflation and Atlantic Copper project completion.
  • 06M&A: management will monitor opportunities but described organic growth as the base case.

Notable disclosures

  • More than four times Gen 1’s incremental recoveries came from Gen 2 additive lab testing; commercial field deployment is planned for 2027.
  • 300M300 million pounds of leach production is in 2027 and 2028 numbers, below potential if the additive succeeds in the field.
  • 2027 Grasberg idle costs will be folded into unit costs, changing presentation rather than underlying costs.
  • $4.5BBagdad expansion estimate remains $4.5 billion in current dollars, with permits already in place and completion expected around three and a half years after final decision.

Risks raised

  • Abnormally high extreme-weather frequency disrupted U.S. operating momentum and continued into the fourth quarter.
  • Dry Indonesian conditions support mining but limit water availability and challenge higher mill rates.
  • Capital inflation, including labor, steel, equipment, tariffs and energy costs, complicates project budgets and schedules.
  • Gen 2 leach additive benefits remain unproven in commercial field deployments planned for 2027.
  • Higher diesel and electricity costs lifted 2026 energy costs by about $500 million versus 2025.

Tone: Confident 0.78

Management conveyed confidence in production growth and organic opportunities, while acknowledging execution, weather, inflation and technology-validation risks.

Who spoke

Company

  • David JoinkVice President, Investor Relations
  • Richard AdkersonChairman of the Board
  • Kathleen QuirkPresident and Chief Executive Officer
  • Maree RobertsonExecutive Vice President and Chief Financial Officer
  • Corey StevensUnidentified Management
  • Unidentified Management
  • MarkUnidentified Management

Analysts

  • Richard GarchitorenaAnalyst, Barclays
  • Chris LaFeminaAnalyst, Jefferies
  • Unidentified AnalystAnalyst, BMO Capital Markets
  • Bill PetersonAnalyst, JP Morgan
  • Daniel MajorAnalyst, UBS
  • Bob BrackettAnalyst, Bernstein Research
  • Nick CashAnalyst, Goldman Sachs
  • Brian MacArthurAnalyst, Raymond James

Full transcript

Analyst questions are marked with a bar. Timestamps are into the recording.

Prepared remarks

14:33

Thank you for standing by and welcome to the report, Mac Moran, third quarter conference call. At this time, all participants are in a listen-only mode. Later, we will conduct the question and answer session. If you wish to ask a question during the Q&A session, press star one on your touch-home phone. If you require assistance during the conference, please press star zero. I would now like to turn the conference over to Mr. David Joink, vice president, investor relations. Please go ahead, sir.

15:01

David JoinkVice President, Investor Relations

Thank you, Regina, and good morning, everyone. Welcome to the free-port conference call. Earlier this morning, FCX reported its third quarter operating in financial results. A copy of today's press release with supplemental schedules and slides are available on our website, FCX. com. Today's conference call is being broadcast live on the internet. Anyone may listen to the conference call by accessing our website homepage and clicking on the webcast link.

In addition to analysts and investors, the financial press has been invited to listen to today's call. A replay of the webcast will be available on our website later today. Before we begin our comments, we would like to remind everyone that today's press release and certain of our comments on the call include non-GAT measures and forward-looking statements and actual results may differ materially.

Please refer to the cautionary language included in our press release and slides and to the risk factor described in our SDC filings, all of which are available on our website.

Also on the call with me today are Richard Actorson, Chairman of the Board, Kathleen Quirk, President and Chief Executive Officer, Marie Robertson, Executive Vice President and Chief Financial Officer, and other members of our management team. Richard will make some opening remarks. Kathleen and Marie will review our slide materials and then we'll open up the call for questions.

Richard?

16:34

Richard AdkersonChairman of the Board

Thanks, David. We appreciate you all for joining us today. We've been looking forward to speaking with you about our strong third quarter results and our positive outlook for the future. We are pleased and proud of our team with the steady progress throughout the year, achieved on the Graspour Grandpa and with our initiatives across our business to drive value.

As we look forward, the table is set for growing our volumes in the near term, medium term and longer term, supported by a portfolio of long live assets and by a qualified and experienced team. Leaders in Indonesia have expressed support by the extension of our operating rights beyond 2021. We continue to work with the Ministry of Energy and Minds on documentation to then to implement the memorandum of understanding we signed with the Government of Indonesia.

Freeport's growth plans match up exceptionally well with accelerating requirements for copper. Electrification continues to advance at a rapid pace, bigger and faster than we've seen in the past, and copper is the medal of electrification. The world requires a lot more copper and supplies are challenged.

Freeport is particularly well positioned to grow with the market. After working in this industry for decades, today's opportunity or structural trends point to multi-year period of significant demand growth is unique. We have Freeport in the right assets, the right time, with the strong team and the Freeport family and our strong financial positions. We are well positioned to capture this opportunity for the benefit of our shareholders and all our stakeholders.

Kathleen.

18:22

Kathleen QuirkPresident and Chief Executive Officer

Great, thank you, Richard, and thank all of you for participating on today's call. We'll review our third quarter performance and update you on our initiatives, projects, and future outlook. Today, we will be discussing our team's work across our global business to build value. Our solid progress and momentum to safely and sustainably restore large-scale production at Graspard, drive operational excellence, and new technology initiatives in the Americas, and advance plans for value-enhancing organic growth.

Starting on slide three, we show the highlights of our third quarter performance. Copper sales have increased in each of the last three quarters, and we expect fourth quarter sales to be the strongest of the year by far.

Steady progress continues at Graspard, with 67% ramp up achieved, and confidence is building toward full scale. Strong operational execution combined with the favorable metal price backdrop provided significant margins, cash flows, and earnings.

The diversity of our portfolio and pricing leverage for our U. S. business comes through in the results. Operating income for our U. S. mining operations more than doubled in the third quarter, compared with last year's third quarter, was strong conversion to the bottom line. This contributed to an increase of over 80% in our consolidated net income, compared with the year ago quarter.

The progress achieved during 2026 sets us up for growing volumes and improving financial performance as we look ahead to 2027 and 2028. Additionally, we are advancing our future growth plans with a series of projects in progress.

We return nearly a billion dollars to shareholders year to date, including 300 million in share purchases. Our financial position remains strong, and as we look ahead, growing volumes combined with a positive market environment for our products, sets us up for significant increase in cash flows to support our value enhancing investment program and increasing returns to shareholders.

Moving to the copper markets on slide four, as a leading global supplier of a fine copper, Freeport has strategic significance and a strongly positioned to benefit from copper's essential and increasingly important role in societies around the world. Copper superior conductivity makes it the metal of electrification, and the global economy is rapidly becoming more electrified. Globally, copper demand is expected to rise in a number of applications, including the massive requirements for the power grid to support new technologies.

LME copper prices average $6.09 per pound year to date through September, and currently approximate $6.58 per pound on the LME, and increase the 16% since the start of the year.

Our U. S. customers report robust copper demand associated with growing requirements for electricity and energy infrastructure, data center builds, and in the transportation sector. Copper continues to be strategically significant to China as the world's largest consumer to support its domestic power grid, technology advancement, and manufacturing of autos and consumer goods for growing exports.

The sizable movement of product to U. S. whereas it continues resulting in tight market conditions in the major consuming regions outside of the U. S. The situation underscores the strategic role of copper in the global economy and supply chains to support future growth.

The signals we see are clearly pointing to requirements for additional copper supplies to meet growing demand, and at free port we have a valuable, geographically diverse portfolio of integrated copper assets with large scale production facilities that are difficult to replicate, long-line reserves and resources, and a portfolio of low risk, ground field expansion opportunities to serve a growing market.

I'm gonna move to the operating highlights on slide five where we summarize the highlights by geographic regions. Starting with the U. S. , we continue to focus on operating disciplines to improve efficiencies and productivity to grow production despite low org rates. We were successful in improving our mining rates compared with the year ago quarter.

However, in an abnormally high frequency of extreme weather events in the third quarter, which have continued in the fourth quarter, disrupted some of the momentum achieved earlier in the year.

We are deploying new technology tools to enhance our operating models and our investing in more efficient trucks and mining equipment to support our objective of increasing U. S. production and reducing costs.

We continue to pursue an exceptional opportunity to unlock meaningful value through application of new technologies for recovering copper in our leaching processes. Data from our work today to support us of a potential breakthrough, and we are looking forward to what we'll learn as we go through 2027 as high potential next generation proprietary additives are deployed in the field.

In South America, our flagship Sara Verde operation in Peru continues to demonstrate solid operating performance and productivity consistent with a large-scale world-class operation.

At elaborate and chilly, world rates and operating rates were impacted during the quarter by mine's frequency to address slope management.

We're now commissioning new facilities at Elabra that will allow us to enhance metal production by increasing temperatures in our leach pads.

And we continue to work with the Chilean government to advance our environmental impact study to position Elabra for a major transformative expansion.

In Indonesia, we're pleased to report that the team continues to achieve meaningful progress on the ramp up at the Graspard block cave. We operated at 67% of mine capacity during the third quarter and progress is advancing for meaningful growth as we go into 2027. Upgrades to the material handling system for our automated rail system are progressing on schedule, and we continue to advance work for a restart of production block one South in 2027.

We continue to target overall rates reaching 80% by mid-27 and approach full capacity by the end of next year. We were successful in restarting the smelter and now have both smelters in Indonesia in operation to support our mine ramp up. The team is executing the face ramp up safely and efficiently and we continue to de-risk the plants and increase confidence in the long-term outlook.

In Indonesia, we continue to experience abnormally dry weather conditions in a closely monitoring forecast which predict conditions to return to more normal levels as we move into 2027. The dry conditions are generally favorable for mining. The low water availability presents challenges and increasing mill rates.

We're actively managing the situation with limited impact to date. As Richard mentioned, we're continuing to work cooperatively with the Indonesian government to secure our long-term operating extension in accordance with the MOU reached early in the year.

We submitted our application in June and we're continuing to work to complete the formal process. The government continues to express support for extension to provide long-term continuity of large-scale operations and mutual benefits.

Big picture, the third quarter, the team executed well, but experienced challenging operating conditions. You'll note we continue to expect the fourth quarter will be the strongest of the year, but have adjusted our 2026 copper sales by approximately 2% to incorporate the impact of shortfalls in the US and in Chile.

Our team is committed to execution, dedicated to overcoming challenges and driven for excellence in all that we do. I'm gonna move to slide six where we have some real excitement around free port about the growth catalyst. We're driven to increase copper supply to a growing market and a strongly positioned as we look forward with significant near-term, medium-term and long-term growth.

The progress we've made throughout 2026 positions us for significant growth in volumes, margins and cash flows in 2027 and 2028 as Marie will cover shortly.

In the short term, we're positioned to grow from three billion pounds this year to 3.7 billion pounds in 2027 and over four billion pounds in 2028.

Continued strong execution of the Graspur recovery is the major driver with improved US production adding incrementally. This growth notably does not require a new capital.

With our US growth initiative as America's copper champion, we see a path for free port to be a four and a half to five billion pound a year copper producer in the 2030 timeframe with success in our innovative leech initiative and our expansion of our Baghdad mine in Arizona.

We continue to see the innovative leech initiative as one of the most attractive opportunities in our company because it leverages our existing infrastructure, is scalable, is not capital intensive and has low incremental operating costs. We've been on this journey and advancing this initiative for the last three to four years and our excitement continues to build supported by progress in developing a proprietary next generation additive that would unlock recoveries of low grade ores previously thought to be unrecoverable.

As you'll see in the chart, lab testing of the new free port additive is showing incremental recoveries of more than four times those achieved with our initial additive.

The next generation additive is now being manufactured on a fast track schedule and will start receiving commercial quantities for field deployment as we go into 2027. While we need to be cautious until it's proven in the field, this could represent the major breakthrough technology that we've been working to achieve.

We expect to make an investment decision on the Baghdad expansion in the four quarter, very excited about this. We see it as an attractive opportunity to transform Baghdad into the second largest copper mine in the US benefiting from economies of scale and the use of modern technology to set the operation up for improved multi-decade performance.

We're also advancing further growth options, which could be developed by the mid 2030s with a large scale expansion of the Elapra mine and Chile and exciting possibilities for development of our large resource position in the Safra and Lone Star District in Arizona.

We see our pipeline of organic growth being particularly attractive in the context of an industry where greenfield projects carry significant risk and development timeframes can span 15 to 20 years. We have a differentiated advantageous position since our projects are brownfield in nature resulting in benefits from leveraging existing infrastructure, lower capital intensity, experience workforces and relationships with key stakeholders to move more quickly with less risk than a greenfield project.

We're increasingly mindful of escalating inflationary pressures affecting capital costs for major projects and the need to be disciplined on qualifying projects, delivering investment returns, and carefully controlling budgets and schedules. We're going to continue to be focused, selective and deliberate as we go forward and on balancing investments in growth with shareholder returns. At Freeport, we benefit from an experience and highly respected project development team with proven experience in successfully managing major projects around the world.

Putting this all together, the setup for Freeport is exceptionally strong, and Team Freeport is intensely focused on execution and delivery to capture the value and the special opportunities that lie ahead. Now, I'm going to turn the call to Marie, who will review our outlook and then we'll take your questions.

32:39

Maree RobertsonExecutive Vice President and Chief Financial Officer

Thanks, Kathleen. This flipping to slide seven, we show our three-year outlooks at South volumes of copper, gold and molybdenum. As Kathleen referenced, we expect significant production and sales growth in the coming years.

We have termed our 2026 copper sales by about 2% taking into account slightly lower production in the US and Chile, and by approximately 2.5% in 2027 to reflect current mind-plan updates.

Copper sales in 2028 are consistent with previous estimates, and gold and molybdenum are unchanged for the three-year period. We expect our fourth quarter of 2026 sales volumes to be the highest of the year, with copper sales increasing 17% and gold sales nearly tripling from third quarter levels.

For the year 2027, we expect annual growth in copper sales of over 20% compared with 2026, and more than a 50% increase in gold volumes. With additional growth in 2028, of 10% for copper and 20% for gold, our team remains focused on delivering our plans safely and efficiently, which will translate into strong financial performance and meaningful future cash flow growth.

Moving to slide eight, we continue to carefully manage all costs and capital whilst driving efficiency and productivity programs, particularly in light of inflationary pressures affecting our business and the industry.

As discussed on prior calls, we continue to experience cost pressures and volatility in global energy and commodity markets, including oil, sulfur and acid, largely associated with the conflict in the Middle East. Rising energy costs during 2026, particularly diesel prices, have impacted costs by approximately $500 million compared with 2075. Sulfuric acid, a key input into various copper processing technologies across the industry, has more than doubled this year.

Notably, free-putters comparatively well positioned given our integrated business model and is generally insulated from price minutes as a significant producer of sulfuric acid throughout smelting operations and consumer of acid in our leaching processes.

In addition to operating costs, capital costs across the mining industry have been trending at a greater pace than overall headline inflation rates in recent years.

These pressures affect both sustaining capital and expansion project costs, reinforcing the importance of remaining highly focused on carefully assessing our priorities, pursuing continuous optimization programs and maintaining rigorous and strict project and cost control. On net unit cash costs, we are maintaining our full-year guidance for 2026 of a $1.90 per pound, with byproducts particularly malignant providing an offset to the impact of higher input costs.

Putting together our projected volumes and cost estimates, we show model results on slide nine for EBITDA and cash flow at various copper prices, ranging from $5 to $7 copper.

These are model results using the average of 2027 and 2028 with current volume and cost estimates and holding gold flat at $4,000 per ounce and releasing them flat at $32 per pound.

Annual EBITDA would range from over $12 billion per annum at $5 billion copper to $19.5 billion at $7.00 copper, with operating cash flows ranging from over $9 billion per year at $5, to approximately $15 billion at $7.00 copper.

We show sensitivities to various commodities on the right. We will note we are highly leveraged to copper prices with each 10 cent per pound change, according to approximately $390 million in annual EBITDA in the 2027-2028 period.

We also have exposure to gold prices with each $100 per ounce change in price, approximating $105 million in annual EBITDA. And to momentum, which has shown significant price strength in recent months. Each dollar per pound change in MOLLE approximates $85 million in EBITDA per annum. With our long-life reserves and large-scale production, we are well positioned to generate substantial cash flows to fund future organic growth and cash returns under our performance-based payout framework.

Slide 10 shows our current forecast for capital expenditure in 2026 and 2027. Our 2026 capital expenditure is currently estimated to approximate $4.4 billion, a 2% increase from the prior estimate, and $5.2 billion for 2027, an increase of approximately $400 million above the July estimate, primarily reflecting additional mining equipment investments to support and enhance productivity improvements in the U. S. and costs inflation.

The discretionary projects are expected to approximate $1.6 billion in 2026 and $2 billion in 2027, with roughly 50% related to the continuing our development and the LNG project at Grasberg. The bellows include acceleration of tailings and other infrastructure to support the Baghdad expansion, upgraded mining equipment and capitalised interests.

The discretionary category reflects the capital investments we are making in new projects that under our financial policy are funded with the 50% of available cash that is not distributed. These projects are value enhancing initiatives and are detailed on slide 28 in our reference material.

The capital estimates exclude projects to remain subject to completion of final studies and board approval, including the potential Baghdad QX expansion project.

And as I mentioned on the previous slide, we'll continue to carefully manage our spending and deploy capital strategically to projects with the best return and risk reward profiles.

Finally, on slide 11, we reiterate that financial policy priorities centered on the strong balance sheet, cash returns to shareholders and investments in value enhancing growth projects. Our balance sheet is solid with investment grade ratings, robust credit metrics, and flexibility within our debt targets to execute on our projects. We have a strong liquidity position and have substantial flexibility for funding upcoming 20-27 maturity.

Our strong balance sheet and significant cash flow generation supports discipline investment in future growth whilst returning cash to shareholders. And since adopting our financial policy in 2021, we've distributed $6.6 billion to shareholders through dividends and share purchases, including approximately a billion dollars a year to date in 2026, and have an attractive future long-term portfolio that will enable us to continue to build long-term value for shareholders.

Our global team is focused on disciplined execution, profitable growth, and long-term value creation. Thanks for your attention and we now tend to question.

Questions and answers

40:40

Ladies and gentlemen, we will now begin the question and answer session. If you wish to ask a question, press star one on your touch tone phone. If your question has been answered or you wish to remove yourself from the queue, please press star one again. If you are using a speakerphone, please pick up your handset before pressing the numbers. We ask that you please limit your questions to one. If you have additional questions, please return to the queue. One moment, please, for our first question. Our first question will come from the line of Richard Garch-Derena with Barclays. Please go ahead.

41:11

Richard GarchitorenaAnalyst, Barclays

Thanks, and congrats on this recorder. First, my question on grassberry. Given the progress that you're seeing with ramp-up on-track production from Block 1S, expected for mid-2027, and then full run rates by the end of the year, how should we think about the cadence production for a copper and gold in the first half of next year versus second half?

And then how should we think about the mine plans heading into 28 as you ramp up even further?

41:44

Kathleen QuirkPresident and Chief Executive Officer

Thank you, Richard. And we're very pleased with the progress that we're making at Grassburg. The installation of the material handling system upgrades is going well, and we expect that those will be wrapping up towards the end of this year. And early next year. So I think as you look at where we are for 2027, you should see first half starting to ramp up, second half will likely be higher than the first half. But we expect with the startup of these panels that are currently down, that'll add a lot. PB1 South is not a huge contributor in 2027, but you'll see pretty significant ramp up throughout the year, but second half will be higher than the first half, and the first quarter will probably be the lowest of the year.

42:53

Our next question will come from the line of Chris Flippen and with Jeffries. Please go ahead.

42:59

Chris LaFeminaAnalyst, Jefferies

Hi, Kathleen, Marie, Richard. Thanks for taking my question. It depends on the progress in making at Grassburg. It's been an impressive recovery there in the last couple quarters, but I wanted to ask about the idle facility cost, the recovery and restoration cost that you book each quarter. I think it's $240,000,000,000 in the third quarter, more than $900,000,000 year to date.

And a question about that, first of all, how much of that relates to cost that are going to go away when Grassburg fully ramps. In other words, cost that you're spending to repair the operation versus proportion of those costs that are actually kind of fixed costs that you continue to carry going forward. That's my first question. It's around the idle cost at Grassburg.

43:40

Kathleen QuirkPresident and Chief Executive Officer

Okay, thanks, Chris. Thanks for your comments. Idle costs are essentially fixed costs. The accounting rules require us to charge costs that are not attributable to production directly to production costs rather than going through costs to sales. But those costs won't go away, but they will be in our unit costs going forward. We expect the fourth quarter because rates are consistent between third quarter and fourth quarter. We expect the fourth quarter to be similar to the third quarter. But beginning in 2027, we don't expect to have those costs treated separately, and they'll be in our all-in unit costs. But of course, with the rising volumes, we've got a very significant increase in volumes going from 700 million pounds of copper this year to 1.2.

Next year, you'll see very low unit costs continuing at Grassburg. So it's really an accounting classification as opposed to a change in cost.

44:50

Chris LaFeminaAnalyst, Jefferies

Got it, thanks. And just one question on the US operation. So you're doing a lot of good work there in terms of getting mining rates up. Obviously, grades there are low, but I've noticed that recovery rates have been trending lower. And wondering if that will continue, and why that might be happening is the nature of the ore changing.

Is this something that's temporary? What's going on there? Thanks.

45:11

Kathleen QuirkPresident and Chief Executive Officer

Thank you. I'm going to let Corey Stevens cover that one. But it is, you write your last comment about nature, the different types of ore that does affect recovery. But Corey, why don't you give us some color on that?

45:28

Corey StevensUnidentified Management

Yeah, so Kathleen and the recovery rates are driven by how the ore body presents itself. And we've really been mining lower volumes in past years.

To be honest, we're missing expectations of where we really wanted to be. And there's a bit of catch up at this point in time as we increase volumes and the ore presents itself to get to the better locations for better grades. And so that's where a lot of our focus is really placed on increasing mine performance and really adjusting to the employed various technologies. As we go forward, we've launched our officially launched our remote operating center here in Phoenix.

There are really a couple of high operating standards that state-of-the-art technology and analytics to be able to deploy and work with the teams at sites to help them be successful as they work through the higher volumes. We're implementing new tooling with higher payload over-class fall trucks, better mine plans and road designs.

We see the solution going forward at this point with higher volumes to really set these processing plans up and then coupling that with the new technologies that we're developing on the leach enhancements and the additives on that front.

47:01

Chris LaFeminaAnalyst, Jefferies

So do you expect the recovery rates to rise from where they are today or should they stabilize where they are?

47:07

Corey StevensUnidentified Management

Yeah, so really that goes back to this additive development work, which is really giving us a lot of confidence that our Gen 1 additives we've deployed in 2025 and 2026.

That's really giving us expected results from our lab protocols and that gives us confidence that our Gen 2 additives are really going to really launch us into this next phase of development that really could change quite everything in terms of how we're going to be leveraging the copper that's in the existing stockpile but also harness the resource that's in the ground still.

So we're really pretty excited about where that's headed and we've got limited demonstrations that are in the portfolio right now that's really going to set the stage for how we really want to leverage that going forward. But we're quite optimistic on how that's going to play out and yes, there's going to be learnings with those commercial developed deployments that we have planned in 2027 but the team stands ready to adapt and adjust as we pursue America's copper champion.

48:27

Kathleen QuirkPresident and Chief Executive Officer

And Chris, I think you're referring to, Cory was talking about the leach recoveries but I think you're also referring to the mill recoveries and those are impacted by the types of ore and what those recoveries are. So those will vary depending on the types of ores that are being milled.

But as Cory was saying, we're really very excited about the opportunities in the U. S. We're thinking bigger and bolder. These resources are very large, they're low grade but the more that we can drive productivity and we're leveraging technology, we see that as a major value unlock for us. The more that we can drive productivity, Cory talked about a different kind of trucks that we're using. We've had great success with those in Peru, it's their Verde and those are going to be allow us to be more efficient, more productive as we go forward.

And so we're really focused on increasing our mining rates in the U. S. particularly at Morency where we pretty much process everything that we mine there and the more progress we make on building those mining rates up the better we're going to be in terms of increasing production in the U. S. Not just from the leech but also through our mills. So we're very excited about the opportunity to enhance our operating models within our U. S. mine.

50:13

Chris LaFeminaAnalyst, Jefferies

Great, thank you, good luck.

50:16

Our next question will come from the line. If caught again, stick with the ammo capital markets. Please go ahead.

50:23

Unidentified AnalystAnalyst, BMO Capital Markets

Hi, thank you for taking my question. Let me be staying on the U. S. side, specifically on the leech thing. I think you mentioned that the new additives are performing as expected, but it does seem that leeching ramp up is a bit slower than previously expected. Can you talk about what is driving that?

50:46

Kathleen QuirkPresident and Chief Executive Officer

So as Cory was talking about, the current additive that we're using is showing what we expected in the lab. It's consistent maybe a bit better than what it was predicted to be in the lab. We have always been, as I mentioned over the last couple of years, we've always been testing multiple additives.

And so we have not yet tested in the field this next generation additive. That has the potential to put us on the path for scale. That combined with the work that we're doing to increase temperature of our stockpiles has the potential to really help us with scale. We've got 300 million pounds targeted in 2027 compared to just over 200 million pounds in 2026. But those new additives, which I said are being manufactured now, really show the potential that we were looking for to supercharge these recoveries. So we'll have to wait a little bit longer, but the optimism is an excitement around this initiative is building because we have, as we've talked about before, over 40 billion pounds of copper that's already been mined.

It's in above-ground stockpiles and prior technologies didn't allow us to recover copper from it. And so now with the promise of potential next-generation additives, we see a real opportunity to build scale. So to date, we've been using principally operating tactics to get more solution to areas within the stockpile that were dry. But now we're able to enhance that with additives.

We've started with the initial additives, but we expect that that'll be replaced with these new additives we've got coming in in 2027. So this is going to evolve. It'll be a dynamic period for us in 2027. But we really see it having the potential to unlock a lot of copper throughout, not just in North America, but South America, a lot of copper as we go forward. And again, this is something proprietary to Freeport.

Very proud of the teams that we have that have been working on this to unlock this value. It's unlike anything we have in the mining industry because it doesn't require significant new capital. So stay tuned. But we're very, very excited about what lies ahead.

53:43

Unidentified AnalystAnalyst, BMO Capital Markets

Thank you.

53:46

Our next question will come from the line of Orest-Walkedall with Scotia Bank. Please go ahead.

53:51

Unidentified AnalystAnalyst, Scotia Bank

Yes, good morning. I'm wondering if you can give us some more color on the increase to the CAPX guidance for 27. It looks like it would up 400 million from the Q2 guidance. Is that just inflation on the existing plan projects? Or have you added projects to the list?

54:11

Kathleen QuirkPresident and Chief Executive Officer

Well, we've added the category that we call other sustaining and other. We've added more mining equipment. As I mentioned, the success we've had with the ultra-class trucks in Peru, at Cerro Verde, has been very strong. And so we've added some additional trucks to allow us to continue to increase mining rates to unlock more production, more copper production, as we go forward.

So that was about half or so of the increase. We do have some inflation that's part of it. And we have some additional costs as we complete the project at Atlantic Copper, the circular project, that we expect to complete during 2027. So those are the key categories. But as Marie mentioned, we are seeing capital cost inflation. You see it in operating costs, but we also were seeing it in capital costs, the cost of the type of equipment that we purchase has gone up. And it's trended higher than CPI in recent years.

So we are continuing to work to control costs, to prioritize what makes sense. But from a big picture standpoint, this industry, historically in recent years, arguably has been under-invested. And as we look forward at making sure that we've got the ability to grow our business in line with where we see demand for copper growing, we've got to be thinking bigger and bolder. That doesn't mean we're not going to control spend. We're going to control spend. It's in our DNA, but bigger and bolder in terms of how can we get more out of our existing assets.

And incremental capital spend can make us more efficient, more productive, help us address the labor challenges that we have. So we're thinking differently about the future than maybe we have in the past, in terms of making sure that all these operations are producing at their max rate to be able to meet the requirements of the future. And as we've been saying, what we see in front of us is very significant growth and demand.

And we've got to be prepared to step up to that demand and do it in a profitable and economic way. But that's part of what you're seeing, Orst.

57:12

Unidentified AnalystAnalyst, Scotia Bank

Thank you. Appreciate the color.

57:14

Kathleen QuirkPresident and Chief Executive Officer

Is it fair to sort of read into this that that approach likely continues into 28 in terms of more of an elevated spend?

Well, as we see the markets today, we see a need, a signal to produce more. And so we're going to be looking within our portfolio of what is the cheapest way, the most economic and productive way to build new capacity and get more out of what we already have, the resources that we already have. So if we can add incremental capital and get, you know, benefits and quick pay outs, those are things that we're going to be inclined to do. Now we've got also the major project and our board will be considering the investment in Baghdad. We're very enthusiastic about moving forward with that project. So, but as we look at this, you know, it all fits into our balance of investing in our business, growing our copper production to match what we see is strong demand going forward, the absence of supply growth across the industry, the absence of real significant supply growth.

So what we're doing is trying to figure out, you know, on a brownfield basis, how can we get more to be able to meet these demands? So that's, and we'll monitor it, we'll monitor market conditions as well. You know, in free port, we've had a long history of adjusting to market conditions. If we need to conserve capital, we can.

But as we see it right now, these are going to be very strong economic capital decisions that we're making that help us set us up for the future growth, that we're pursuing.

59:11

Unidentified AnalystAnalyst, Scotia Bank

Thanks, Fetch.

59:11

Thank you. Our next question will come from the line of loss and lender with Bank of America securities. Please go ahead.

59:23

Unidentified AnalystAnalyst, Bank of America Securities

Thank you, operator. Good morning, Richard and Kathleen and Marie. Thank you for this call. And congratulations on the nice quarter. If I could, I'd like to ask about the Baghdad and the investment decision that's expected in Q426. I mean, I think this is a really exciting moment for free port USA.

When thinking about the CAPX that you've now put out the $4.5 billion, you've had now another quarter to refine the engineering work.

Do you see any potential change in that? That's $4.5 billion estimate. And then could you just walk us through timelines? Are there any permits outstanding that still need to be concluded? You know, post an FID decision later this quarter. And then when would be a reasonable time for us to assume commissioning would start for this asset and then ultimately run rate capacity? Thank you.

1:00:22

Kathleen QuirkPresident and Chief Executive Officer

Thanks. In terms of permits, we don't, we have what we need to go forward with this expansion. We've been working on it for some time. You know, we've been spending money to ready the operation for this investment. We have been advancing work on our tailings. Tailing stand there to be, that we would have needed to do anyway down the road, but to be ready for new production.

We have converted the the haulage fleet there to fully autonomous, to prepare for the ability to scale. You know, one of the things that has been a factor for us in thinking about growing in the U. S. has been the tight labor market, particularly for the types of skills that we need. And so we have been leaning on technology to help us scale.

And at Baghdad, that was the first mine we selected to deploy the, the autonomous trucks. And so as we move forward with an expansion, that will allow us to scale and add, you know, autonomy and continue to add autonomous trucks to scale that without, you know, without needing to, as many people as we would have otherwise needed. So, but in terms of your question on the, on the capital cost, our estimate now, you know, on a, on a go forward basis is still at that four and a half billion dollar level. We've done a lot of work on it this year. We've been working with our, with our contractors.

We've been working to, to, to make it as efficient as possible. It's a competitive market in Arizona with, with all of the, not just copper projects, but, but, but all the other activity really is driving the man for skills in, in Arizona, in the semiconductor sector with all the bill going on in, in, in electricity build out and, and data centers. It is a, it's a very active time in Arizona. And so we have been planning this, working to de-risk the capital as much as possible, prefect, you know, working on, on a model that would allow us to prefab certain of the material. So we didn't have to, we don't have to do everything or limit what's done on site.

So we've been doing a lot of things to try to de-risk the capital, but it is an environment where, as, as we mentioned, escalation, you know, labor costs, the cost of steel, other things, you know, tariffs, other things that are affecting, affecting cost energy markets have, have a, have a degree of an impact. So all those things are, are, are things that we're taking into account.

And we don't know, you know, what the future inflation will be, but in current dollars, we're drawing a circle around, you know, four and a half billion dollars and we're going to work very hard to, to manage both the, the capital spend and the, and the, and the, and the time schedule. We, we expect the, the project would, would come in within the next, from the final decision, come in around three and a half years. And, and, and so our, our team is, is, is well organized.

You know, one of the things about Freeport is we have a project development execution team that is best in class. And the project controls are excellent. Our work with contractors is, is very strong. We, we have an approach where we don't just turn over a, a project to a contractor, to, to execute. We're right in there executing all the, all the cost and everything are on our system so that we can manage and control those. Having said that, it's a challenging environment. But if any team was ready, this team is ready. This, a lot of the people on this team that we're forming have, have, we're, we're, we're integral in, in getting that melter done in Indonesia during a very challenging time during the, during the pandemic and, and, and, and really worked hard to, to bring that project in.

So, we've got resource capacity within the company that are, that will be dedicated to this. We've got contractors that we've been working with for some time, both on the EPC side and on our labor side. And so we, we feel we're ready. We're gonna, we're gonna talk with the board about it. But this was a real opportunity for us as, as America's copper champion to, to leverage what we have there. The, the facilities are currently undersized for the size of the resource. And so we're really looking at this for the long term and to set this operation up to be more efficient, more modernized. You know, this was done in, in the 1940s and more modified, more, more modernized.

And, and this will be a mind of the future. And one that, that, you know, we're very excited about moving forward. So we'll make a decision with our board here soon and, and hopefully be on our way. In terms of the incremental production, the, the Baghdad we're looking at, you know, a doubling, it would be something on the lower of 200, 250 million pounds a year. The concentrator size will be more than doubled.

We're also, we've benefited Baghdad from a large amount of molybdenum production. So we'll be adding 10 to 12 million pounds a year of molybdenum. So, big, big feature of the project is using economies of scale to bring down our costs. And that's, that's, you know, what we're focused on and cross the U. S. is finding ways to, to reduce our, reduce our costs as, as we go forward.

1:07:08

Unidentified AnalystAnalyst, Bank of America Securities

Thank you very much, Kathleen. I appreciate that.

1:07:11

Kathleen QuirkPresident and Chief Executive Officer

Thanks, Austin.

1:07:14

Our next question will come from the line of Tim the Tanner's with Wells Fargo. Please go ahead.

1:07:19

Unidentified AnalystAnalyst, Wells Fargo

Yeah. Hey, good morning. I hope you're doing well. I wanted to ask if I could two quick follow-ups. One is regarding the leaching discussion, really helpful detail on the potential benefits from the new additives. But I wanted to just clarify, is it possible that this additive is not in your numbers right now and could result in upside-tier numbers? Or do you think that the success of the additive would be beyond 2027, just a little more color on that?

And then, yeah, I'll let you go to the other one next.

1:07:48

Kathleen QuirkPresident and Chief Executive Officer

Yeah, sure. We've got, we have 300 million pounds in our numbers for 27 and 28. That is lower than potentially could be expected if the additive is as, as successful in the field as it is in the lab.

And then with that data, that would give us the plan to decide where to go. This is a, this is a test. It's a commercial test. We've got enough quantities that we've got manufactured to be able to fully test it. But if it's successful, this could be really what we've been looking for. And you could have a situation where leach recoveries start to to compete with a mill recovery. And that could have implications to how we think about the future. Like the Stafford opportunity we're pursuing, we're pursuing a mill, but that could change the flow sheet as well. So, but remember our target or our potential or our aspiration is to, is to scale the leach opportunity from, you know, just over 200 this year to 300 next year.

And then ultimately, you know, by 2030 to get to this 800 million pound level. And that would be done with a combination of a successful leach additive and the increased temperatures that we're, we're currently testing now. We're testing it, we're just starting a, a project at a lava now to heat the, the solution that's going into the stockpiles there. We're doing some at Cerro Verde where we have smaller stock, the smaller leaching operations. And, and we have plans to do it in, in Morency as well. But we'll have to see that the, the, the testing work that we're doing is showing really strong recoveries. And it's a possibility that we may not even need heat in the U. S. if the recoveries are as good as, is what, what the, the lab is showing.

So we're, it's dynamic and, and we'll have a lot more information as we go through 27. But it's not in, it's not in our forecast, we feel confident we can get to 300, but the 800 is going to depend on the, the results in the field. And so we're not at a point where we can give guidance. We, we see it as a, as a potential value driver that we're pursuing aggressively, but we're not at a point to, to put it into our, our forecast.

1:10:45

Unidentified AnalystAnalyst, Wells Fargo

Okay, appreciate that. And if I could, I know you've been talking, of course, I'll call about organic growth opportunities, but to the extent that this high copper price yields pretty attractive free cashflow going forward, do you consider, you know, M&A, do you consider other ways to grow outside of your organic opportunities?

1:11:08

Kathleen QuirkPresident and Chief Executive Officer

Always. I mean, as, as we have our base case plan of organic growth and, you know, at Freeport, we have, we, we're, we're, we're advantaged in that we do have a significant organic growth pipeline, but we're always monitoring market opportunities. Richard just did a podcast for those of you who, who, who haven't seen it yet. He did a podcast with Andrea Hodder about the self-stodge deal. And if for those of you who haven't seen it, you should see it because it was a, it's a good example. We're going on our 20-year anniversary there.

And at the time, we didn't expect that opportunity to become available, but we were prepared and, and we're ready to, to, to move on it. And it ended up being, I believe, one of the, the best M&A transactions in our, in our sector going back to looking at where we were and where Freeport is today. So we'll, we'll, we'll continue to monitor the landscape, look for opportunities that could, could add value to the company, but we're on a path with our base case of, of creating value to our organic plan. So I would, I would not rule out M&A, but it's not, you know, our, our base cases, our, our organic growth opportunities, which, you know, we can create a lot of value for them.

1:12:41

Unidentified AnalystAnalyst, Wells Fargo

Okay. Great. Thank you all the best.

1:12:41

Our next question will come from the line of Bill Peterson with JP Morgan. Please go ahead.

1:12:48

Bill PetersonAnalyst, JP Morgan

Yeah. Hi. Good morning. Nice to have a quarter and thanks for taking the questions. Um, I guess on the, on the impact of cost, so 500 million higher in 26 relative to 25. I might have missed it, but can you provide a further breakdown between diesel and electricity, as well as, you know, callouts per region, US and Indonesia and South America?

1:13:11

Kathleen QuirkPresident and Chief Executive Officer

Yeah. Um, I think Marie covered some of that in her comments, but for 2025 compared, it'd be 26 compared to 25. Um, it's on the order of, of, of 500 million in, um, in, in increased energy, which includes, uh, electricity and, and, and diesel. Diesel was the biggest factor, but we are seeing, um, we are seeing increased electricity rates. Uh, we saw that quarter to quarter in the US between second quarter and third quarter, you know, significant increase in, in electricity rates. Um, but the, the biggest part of that was, um, was, uh, was, was diesel and you've seen, you know, more than doubling of, of, of diesel costs, uh, for the year, but we, we consume about, um, 275 million gallons, um, of, of diesel a year and, um, a hundred of that is in, um, is in the US, um, and then we've got, uh, 80 in, um, in Peru and the balance in, in Indonesia.

1:14:33

Bill PetersonAnalyst, JP Morgan

Thanks, Kathleen. And then I guess, um, on, for the next year, the, the TFS for Stafford Lone Star, is there any more granularity you can provide, uh, on that timing? And I guess, conceptually, when we think about the, the capital intensity of dollars per ton, um, you know, we think about Baghdad and I'm not sure that a lot of that may be, you know, US related to labor and, and other costs, but I guess that's, that's, that's like over $40,000 per ton. Is that the right kind of ballpark?

1:15:00

Kathleen QuirkPresident and Chief Executive Officer

We'll bring that in lower. What, what could bring that in, I guess, higher, uh, as we think about capital intensity? With the Baghdad one, you know, when you consider the Malibianum credits, so on a, on a copper equivalent basis, it's around 35,000 a ton. Um, yeah. But, um, the, the, the Lone Star, Stafford, you know, we're looking at, at, at potentially a, um, a mill on the same size as, as, um, at Baghdad. We do have, um, you know, some gold at, at, at one of the deposits at, at, um, at Stafford. Um, so that, that, that's helpful. But as I said, you know, one of the things that, that we are wanting to, to get more information on as we go into 27, um, to kind of form our final views on the ultimate development of, of Lone Star and Stafford is the, the success of the, of the leaching initiative.

So that, that will play into, you know, ultimately what the flow sheet looks like. Um, so we're, we're getting, we're feeding in data to those studies, you know, as we, as we get it to, to do the, to do the trade-off work. But one thing, um, Bill, that, I know you know this, but one thing to point out when you're comparing, um, capital cost intensity across different operations. Um, one of the things that needs to be taken into account in overall economics is the US fiscal situation where, um, you know, while you might have a higher capital intensity because of the lower grade, um, you, you, it offsets itself because you don't have royalties. Our tax rate is very low, um, in, in the US.

And so there's some offsetting, offsetting factors that make the, make the economics attractive. Um, so, um, so all those things need to, need to come and play. You can't just prepare capital intensity and say one project is better, better than the other.

1:17:17

Bill PetersonAnalyst, JP Morgan

Yeah, no, totally makes sense. Thank you.

1:17:23

Kathleen QuirkPresident and Chief Executive Officer

Corey, do you want to add anything about Lone Star or, or Safra that I didn't mention?

1:17:30

Corey StevensUnidentified Management

No. Yeah. I think that all those trade-offs really are going to converge to give us the right solution. But you know, we're trying to balance, you know, capital intensity versus, you know, the value proposition and how do we best harness the resource between leaching and milling? It's not really one solution or the other, but it's going to be a combination of both. That's really unlocking the true value.

1:17:53

Bill PetersonAnalyst, JP Morgan

Great. Thanks for that.

1:17:53

Our next question will come from the line. It's Daniel Major with UBS. Please go ahead.

1:18:02

Daniel MajorAnalyst, UBS

Hi, uh, I think Richard, thanks for questions. Um, maybe a couple of just focusing back on, on Grasberg, um, the longer dated, um, production guidance, uh, given in the mind plans come down a little bit over the last couple of, uh, updates. Can you just walk us, um, through the drivers there? I think he previously said it's not associated with normalizing after the mud rush. And then associated with that, um, have you, yeah, has anything changed with respect to bringing back PB1C and PB1N and they needed to achieve sustainable production in line with the guidance you've given over the medium term?

Thank you.

1:18:46

Kathleen QuirkPresident and Chief Executive Officer

Um, is in terms of the overall five years at Grasberg, um, it's very similar to, um, to the, to the prior guidance. I think there was a, a small change in, in, uh, 2030, uh, from what we had previously, but in, in general, the plan, um, that we, um, that we laid out in the last quarter is, um, is, is, is consistent. Um, you know, each quarter, we, we update our, our, our plans, we go through, um, updates to the expected mind sequence, you know, what, what makes sense in terms of the, the production rates. So right now, um, with this El Niño situation and limits on the mill, uh, on, on, on the water availability, what we end up doing is, is, um, is, is reducing some production that's very, very low grade.

So ultimately we, we, we maximize as much as possible the, the, the, the metal production and adjust the mill rates to, to do that, to maximize it. But, um, but the long term plans, um, include a restart of, of, of PB1, um, south, as we said, in the, um, in, in, in the, by mid year, um, we also are continuing to evaluate the restart of, of PB1C, which is where the, um, where the actual, where the incident occurred. Um, and, um, PB1C is a very small, um, and very small piece of our, you know, you look at, at, at 28, it's, it's, you know, very inconsequential. Um, as you, as you go out, it's, it's a little bit more by, by 2030.

It's, uh, you know, probably three to six percent, three percent for copper, six percent for gold, um, in, in the 2030 timeframe. Uh, but we're constantly looking at, you know, what's the right way from a, um, from a, from a, from a safety standpoint and productivity standpoint to, um, to mine VBC. And so that'll, that'll continue to involve, evolve as, as we go forward. Um, we also are reviewing the schedule for Coochingly R. Um, that is expected to, you know, start ramping up in the, um, 2029, 2030 timeframe. And, um, with the focus that we've had on the, um, the, the, the GBC, we are somewhat behind on development rates and KL. So we're working on looking at our plans there to, um, to figure out what we can, what we can make up between that now and then.

But, um, our focus has been on a safe and sustainable ramp up of, of, of Grasberg. And we feel, you know, big picture that's well, well in hand.

1:22:04

Unidentified Management

Mark, I don't know if you want to add any, any of those comments.

1:22:14

MarkUnidentified Management

No, you said it well. We really haven't changed anything. Um, with the PB1 North and PB1C, we continue to look at options, uh, that'll potentially make it more robust. And, uh, we're also working on, you know, as we look at the five years PB3, PB4, I'll play a, a big role. We've, we've been, um, doing some rehab and PB3, but we're beginning the undercutting and, uh, PB4 as well. Um, you know, along with the, the, the major production that's coming out of PB2 right now. Um, I think Kathleen mentioned the, uh, the construction of the conveyor or the shoot galleries is going well, uh, both in, both in the PB2 area and for the restart of PB1 South.

1:22:57

Okay. Our next question will come from the line of Bob Brackett with Bernstein research. Please go ahead.

1:23:16

Bob BrackettAnalyst, Bernstein Research

Good morning. Coming back to the Gen 2 additives, you mentioned you'll have sufficient quantities to start a trial in 2027. Should we think about a six to 12 month trial so that perhaps this time next year will no go, will know whether it's go or no go or could it be a bit faster than that?

1:23:40

Kathleen QuirkPresident and Chief Executive Officer

No, I think that's a good, I think that is a good, um, good, good benchmark to use. You know, as it's gone, in the, in the testing we've done, the longer it stays under leech, the better, the better recovery. So the tail continues to increase, um, as, as it goes. So that, that, we'll be getting information continually, but I think, you know, we'll have some information this time this year, next year we'll update quarterly, of course. This is something we're, we're very, very excited about, can't wait to get it in. And, um, and so we'll, you know, we'll keep, keep you updated as we get, as we have additional insight.

1:24:23

Bob BrackettAnalyst, Bernstein Research

Yeah, the fact that you mentioned that it could compete with no recoveries is quite a tease, but my follow up would be talking about Grozburg risk management. You have four initiatives around mud removal, uh, two of them underway, and it, it feels like the, the, the slower of the two initiatives, uh, you've slipped a little. Should we interpret that as a good thing that the early initiatives are doing their job, or how should we think about that delay from 27 to 28?

1:24:53

Kathleen QuirkPresident and Chief Executive Officer

I'm gonna give that to Mark to comment on Mark.

1:24:53

MarkUnidentified Management

Uh, yeah, we just as we got into the two projects that you mentioned, the impit pumping and the drift that we're developing. Uh, those are both going well. We, we, we're still learning a bit more about, uh, uh, well, as we got into the drift development, there was a little bit of poor ground. We've gotten through that. That's going well now. Um, a lot of them were just a little bit of an adjustment. It's nothing major. Uh, we believe all of these initiatives that are going on in parallel are going to be tools that we have available to us. And we just want to have all the options possible, uh, as we get into the, the PB1 restart, obviously El Nino has helped us out a great deal.

Uh, like, we're not getting as much, we're getting very little water in some of the dewatering drilling that we put into, uh, the, the pit bottom. And that's simply because it's dried up. Um, so the, the drier weather, although it's had some challenges, as Kathleen mentioned, on our mill rate, um, it's really helped us in, in a lot of areas, particularly in GBC on these initiatives.

1:26:15

Bob BrackettAnalyst, Bernstein Research

Very good. Thanks for that.

1:26:22

Our next question will come from the line of Nick Cash with Goldman Sachs. Please go ahead.

1:26:28

Nick CashAnalyst, Goldman Sachs

Hi, team. And, and thank you for, for answering the question here. Just wanted to, to jump back to the US for a second in your comments of, you know, 500 million of higher energy costs, uh, versus 25. Um, you know, with US site production, you know, delivery costs, et cetera. Uh, now at around 380 per pound versus 365 last quarter, uh, for the full year, just thinking, as we bridge into 27, how much of the cost increase should reverse with this normalized US weather, uh, or operating rates versus remain embedded from some of the structurally, you know, higher cost inputs that you mentioned before in terms of labor or other input cost inflation.

1:27:04

Kathleen QuirkPresident and Chief Executive Officer

Yeah. Well, we, you know, in, in the, in all of our numbers that Marie was, was, um, talking about in terms of, of EBITDA, et cetera, you know, we have baked into our numbers, kind of the current energy market environment. Um, and so we're, we're not, you know, at some point, you know, hopefully the, those will, will start to decline, but, um, but those are, are baked in. The, um, the, the thing that we can bring down the unit costs for in the US, the thing that has the, the biggest potential is, is getting, you know, getting, uh, volumes up, copper volumes up. And that's, you know, we're working to do that with increasing the mining rates.

Um, but next year, we are expecting an increase from, from this year. Of course, we've got the, the increase in leech, but we've also got some other small, small increases. But that, that really is what our, our goal is, is to, to build productivity, increase the, the production in the US to, to reduce the overall cost. But we are, you know, we've got, you know, high, you know, high energy costs right now, acid costs, uh, while we're insulated globally, um, we are affected, you know, when you look at the US, we're a net buyer of acid.

Um, that's offset in our revenues elsewhere, as Marie was talking about, but, um, but it does show up in the, the asset prices you show up in the, in, in the unit costs, materials and supplies. Um, you know, with, with the, it had moderated a lot, but now with the inflationary environment, we're starting to see increases again. So, um, the, the thing that we can do the best is to improve our productivity. And, you know, Corey was touching on some of the things we're doing to do that around technology. And that's going to be the biggest driver for us to control the unit costs, is getting more productivity.

1:29:18

Nick CashAnalyst, Goldman Sachs

That's a powerful Kathleen. Thank you.

1:29:26

Our next question will come from the line of Brian McArthur with Raymond James. Please go ahead.

1:29:33

Brian MacArthurAnalyst, Raymond James

Good morning and thank you for taking my questions. Um, can I go back to the comment that was made, um, the teaser as Bob called it for recoveries, um, from the leaching that you might get up to mill like levels. And if I looked at getting from 300 million pounds to 800 million pounds, how much of that is recovery improvement versus just more volume over time? I guess maybe the way asked is none of this other stuff works. Can you go above 300 or conversely? If you do get the mill like recovery, can you get above 800 out in 2030?

1:30:06

Kathleen QuirkPresident and Chief Executive Officer

Ultimately, it's about recoveries. So, you know, when you look at the residual copper that's in our stockpiles, um, you know, it depends on the ore types, but, but at Berency, for instance, the recovery is very, very low. Um, so if you have an uplift of, you know, 40% or more, um, you know, that's, that's not going to be a mill recovery. But in places like Chino, um, where the, the, the leach recovery is, is higher to start with, you know, you add 40% or more and you get, you know, you get closer to the 80 or 85. Um, so it, it depends on the, the, the ore types that, that are involved. But the thing that, that could help us in addition to, um, in addition to, you know, the residual copper is these additives are going to be helping us also with new placements.

Um, so we're just going to have to wait, Brian, I don't want to speculate on whether we could be over or under 800. We, we've been through the, the model several times and we feel that 800 is a, is a, um, you know, it's aspirational, but it's, it's, it's, you can model it based on what we know. So, um, let us, let us, you know, give us a few more quarters to, to, to give you, you know, more feedback specifically on, on what that could look like. The, the, the, the 200 was really tactical things. Those are things like, um, you know, having sensors everywhere that tell you where you need to put more solutions.

You know, and so we've been, we've been doing that. We've been injecting solution to targeted levels, you know, using advanced drilling and targeted drilling. We've been using helicopters to, um, to drop driplines where they couldn't be, it couldn't be accessed in the past. So we've been doing a lot of tactical things to get what we all get, the rocks wet. Uh, this, this, this new, uh, era over the next few years will be about technology and it'll be about the additive plus, you know, the work we're doing to increase temperature of the stockpile. So both of those things coming together is where we see the, the production curve, you know, starting to scale. But we, we, we're at the point now where we, we have to test it and, and see how it does in the field and what the implications are.

1:33:04

Brian MacArthurAnalyst, Raymond James

Great. So that's very helpful color. And maybe if I could ask another question, I know it's not core business, but just on the molybdenum, it's come up a number of times in the call and you do have a slide talking about being the world's largest molly producer.

How much excess capacity is there in the primary? I mean, it's in the U. S. I would think if you could get it up in these marks to be a good thing to do. And my second question is, if you sales go down next year, is that just by product coming out of the U. S. minds or, or the international minds? Like, like, why would it go down next year in a good molly market?

1:33:40

Kathleen QuirkPresident and Chief Executive Officer

Yeah. It's, it's, it'll vary. You know, we've got our two primary minds and then is the production will vary, you know, depending on what the production is from our, from our by-product minds. We're very positive on the outlook from Molly. You know, a lot of the same drivers that we're talking about with copper, you know, the supply challenges at the same time where, where uses from a libdenum are growing. So we see it as, we see it as a, as a real, real privilege business we have in being the world's largest producer. We do have some opportunities to expand primary at, at climax. And, and so we're kind of dusting off our old schedules of those to look at those.

But, you know, our priority, Brian, is, is really to, you know, move the, move copper, but we'll, you know, we'll, we'll continue to look at what the opportunities are so that we can have, you know, additional optionality in the, in the, in the Molly business.

1:34:49

Brian MacArthurAnalyst, Raymond James

Great. Thanks very much, Kathleen.

1:34:56

Our final question will come from the line of Liam Fitzpatrick with Deutsche Bank. Please go ahead.

1:35:03

Unidentified AnalystAnalyst, Deutsche Bank

Good morning, Kathleen and, and team. Two quick ones, I hope. Firstly, just a clarification on the capex guidance for 2027. Does that include anything for Baghdad in terms of the 4.5 billion project number that could be approved later this year? And then the second one is just on buybacks based on what you're showing us here on, on sensitivities at current spot prices. There could be a very material uplifting in cash flows next year. So based on that 50% of available cash flows that could be managed to shareholders. How often do you make that decision in terms of how much stops to buy back? Is it on a kind of rolling totally basis or is it, is it less frequent?

1:35:47

Kathleen QuirkPresident and Chief Executive Officer

We generally monitor the, the, we have a policy where 50% of the cash flow is, is published for investments in our, in our future growth and the other half is for shareholder returns. And so we have the dividends and then we have been using cash flows above that to get 50% to, to stop. So we, we monitor it quarterly and, and look at our, make sure that we're, we're being consistent with the overall distribution policy. But you're right, we're going to be generating a lot in the, in the current market environment and with our, with our growth coming, you know, very significant rise in cash flows. So that will, you know, buy the policy mean we have more cash to, to distribute while at the same time investing in growth.

There, we do not have for the, for the four and a half billion, we do not have anything in, in, in 27 at this point.

1:36:51

Unidentified AnalystAnalyst, Deutsche Bank

Thank you.

1:36:55

And I'll now turn the call over to management for any closing remarks.

1:37:00

Kathleen QuirkPresident and Chief Executive Officer

Well, thank you all for, for participating. Lots of good questions. Just ask Richard if he wants to make any observations, comments or closing remarks.

1:37:13

Richard AdkersonChairman of the Board

And thanks, Kathleen. You can tell everyone that our management team, our board is very excited about reports outlook and what we have available through this going forward. We appreciate your attention, your support and if you have any follow-up questions, let us know. Thank you.

1:37:34

Ladies and gentlemen, that will conclude our call for today. Thank you all for joining. You may now disconnect.

About this transcript

The summary, guidance, analyst focus, and tone are automated and should be checked against the call before being relied on. Names and figures can be misheard. Listen to the replay.