Alliant Energy (LNT) Q3 2026 earnings call transcript

Transcript, summary, guidance, and what analysts pressed on from the Alliant Energy call on October 30, 2026.

FreeSee Alliant Energy's financials in GloomOpen in browser →Jump to the transcript
Held
October 30, 2026
Length
46 min
Tone
Confident0.82
Analysts
5
Words
6,863
2027–2030 earnings growth
8% plusat least 8% each year
2027–2030 capital plan
$15.9 billion19% above prior plan
Rate base and CWIP CAGR
13%through 2030
Additional large-load target
approximately one gigawattwithin six months
Capex per added gigawatt
$2 to $3 billioncapacity resources
DOE guaranteed loan
$5.1 billionup to $1.2 billion cumulative customer savings
2027 dividend target
$2.25 per share5% increase over 2026

Summary

Management framed the update around disciplined, customer-funded growth, with stronger project visibility supporting faster investment and earnings growth through 2030.

  • The inclusion bar for large-load projects now explicitly includes local permitting, alongside land, transmission, and generation visibility.
  • Management expects approximately one additional gigawatt of contracted large load within six months and would update capital plans as projects qualify.
  • The Iowa base-rate stability plan was extended through 2030, while management emphasized customers should not subsidize large-load growth.

Guidance

  • $3.412026 ongoing EPS guidance narrowed to the top half of $3.41 to $3.46 per share.
  • $3.632027 ongoing EPS guidance $3.63 to $3.73 per share.
  • 5%2027 annual common stock dividend target $2.25 per share, a 5% increase over 2026.
  • 8%2027–2030 annual earnings growth at least 8% each year.
  • 6%Long-term annual earnings growth target 6% to 8% plus.
  • $15.9B2027–2030 capital investment plan $15.9 billion.
  • 13%Rate base plus construction work in progress growth 13% CAGR through 2030.
  • $3BIncremental capital expenditures approximately $2 to $3 billion per additional gigawatt of load.

What analysts pressed on

  • 01Growth rate framing: management said 8% plus means at least 8% each year through 2030, with higher growth possible in heavier investment years.
  • 02Pipeline scale: management declined to size ten active-discussion sites individually, saying each is at least several hundred megawatts.
  • 03Incremental load capital intensity: management estimated approximately $2 to $3 billion of capital expenditures per additional gigawatt, with some spending after 2030.
  • 04Masabi demand: management declined to quantify plant capacity, saying only its firm initial non-curtailable demand is included in the plan.
  • 05Financing needs: management said future incremental capital may require less common equity than the prior 40% to 50% range as load cash flows ramp.
  • 06Rate stability affordability: management attributed Iowa’s extension partly to higher energy-storage tax-credit potential, including credits of 30% to 50% on some projects.

Notable disclosures

  • 3.4 gigawatts of data-center load is committed across three existing sites, with additional growth opportunities at those sites.
  • Ten active site discussions are separate from the three committed sites; management said seven additional sites are being pursued.
  • $22MQTS Clinton property-tax contributions were cited at roughly $22 million to $60 million annually, versus about $5 million for the next-largest contributor.
  • $1.1BApproximately $1.1 billion of the $2.7 billion planned common equity has been secured through forward equity agreements, addressing needs through first-half 2028.

Risks raised

  • The next expected gigawatt’s load ramp starts mainly in 2029–2030, while some required generation capital may fall in 2031 or later.
  • Higher O&M, depreciation, and financing costs are expected as the generation fleet and rate base expand.
  • The 13% investment-growth rate exceeds the 8% plus earnings target, with management citing roughly 375 basis points of equity dilution and 50 basis points from refinancing.
  • Masabi’s anticipated load is significantly curtailable, and only non-curtailable initial capacity needs are reflected in the plan.

Tone: Confident 0.82

Management expressed strong confidence in project visibility, customer-funded growth, and financing flexibility, while acknowledging execution and dilution requirements.

Who spoke

Company

  • Susan GaoInvestor Relations
  • Lisa BartonPresident and Chief Executive Officer
  • Robert DurianExecutive Vice President and Chief Financial Officer
  • Unidentified Management

Analysts

  • Nicholas CampanellaAnalyst, Barclays
  • Unidentified AnalystAnalyst, Bank of America
  • Paul FremontAnalyst, Ladenburg Thalmann
  • Anthony CrowdellAnalyst, Mizuho
  • Andrew WeiselAnalyst, Scotiabank

Full transcript

Analyst questions are marked with a bar. Timestamps are into the recording.

Prepared remarks

00:01

Thank you for holding a welcome to Alliant Energy's third-quarter 2026 earnings conference call. At this time, all lines are in a listen-only mode. Today's conference call is being recorded.

00:13

Susan GaoInvestor Relations

I would now like to turn the call over to your host, Susan Gao, investor relations manager at Alliant Energy.

Good morning, and thank you for joining Alliant Energy's third-quarter 2026 Financial Results conference call. Joining me today are Lisa Barton, President and Chief Executive Officer, and Robert Durian, Executive Vice President and Chief Financial Officer. Following our prepared remarks, we love time to take questions from the investment community.

Last night, we issued a news release announcing our third-quarter 2026 results, narrowed our 2026 full-year earnings guidance, initiated 2027 earnings guidance and dividend target, and provided our updated capital expenditure and financing plans through 2030. That release, along with our earnings presentation, will be referenced during today's call, and is available on the investors section of our website at AlliantEnergy. com.

Before we begin, please note that today's remarks and responses will include forward-looking statements. These statements are subject to risks and uncertainties that could cause actual results to differ materially. Those risks are described in last night's earnings release and in our filings with the Securities and Exchange Commission. We disclaim any obligation to update these forward-looking statements. In addition, this presentation contains references to ongoing earnings per share, which is a non-gap financial measure. Reconciliations to gap results are provided in the earnings release available on our website. At this point, I will turn the call over to Lisa.

02:05

Lisa BartonPresident and Chief Executive Officer

Good morning, everyone. We are pleased to share strong third-quarter and year-to-date results and measurable progress against our growth strategy. We have also updated our outlook for the remainder of this year and 2027, refreshed our capital expenditure and financing plan, and accelerated and extended our earnings growth expectation plans through 2030. AlliantEnergy is experiencing extraordinary momentum, fueled by rising customer demand and economic development. As the communities we serve continue to grow and thrive, reliable, affordable energy is more essential than ever to their long-term success.

We are operating from a position of strength building on our consistent track record of growth and delivering dependable results our investors can count on. That strength is rooted in the AlliantEnergy Advantage, constructive regulatory jurisdictions, flexible resource planning, practical and pragmatic leadership at the state and community levels, and an organization focused on unlocking the potential of our customers and communities, while keeping affordability at the forefront. Today's update shows how that advantage delivers dependable growth, benefits customers, and provides investment opportunities beyond our current plan.

First, we have greater visibility into our growth outlook. Five data centers support our expectation for greater than 60% contracted demand growth by 2031. Three are actively under construction. Google is taking transmission service with a load ramp consistent with the complete the commissioning of their first two buildings later this quarter. And in Wisconsin, meta is taking distribution service with an expectation to take transmission service Q1 27.

As a reminder, we proactively identify locations where large loads can interconnect without significant incremental transmission investment, supporting speed to power, helping customer affordability, reducing execution risk, and strengthening our competitive position. We have maintained a high bar for including new opportunities in our financial outlook. A signed electric service agreement remains important, but we also require clear visibility into land, transmission, generation, and going forward. We are also including local permitting as part of the higher bar. As large load projects have increased in scale and complexity, we are raising the bar not just on what we include in our disclosures, but on the rigor behind it. Our objective is not to present the biggest number, but to provide investors with the greatest confidence in the executability of our growth.

That disciplined approach in determining when to include projects in our CAPX plan is what we mean by dependable growth investors can count on. In the first quarter, we announced an executed electric service agreement of new demand. We are pleased to share that the agreement supports Google's expansion at its Cedar Rapids Iowa site. That opportunity has now met our planning threshold and is one of the projects supporting our refreshed resource plan. We are also seeing progress across a diversified set of load opportunities beyond large data centers, including edge data centers and manufacturing expansion in Wisconsin and Iowa. Based on our discussions with Masabi metallics, the company expects to locate its plans in our service territory in Lee County.

As is consistent with this industry, a significant portion of its load is anticipated to be curtalable. Consistent with our approach to grow at the pace of our customers, we align our capacity resources with customers' non-certalable needs. Masabi's initial capacity needs are reflected in our refreshed plan. Any future phases of this project would require additional resources.

Second, our growth is translating directly into infrastructure investment and earnings growth. Our refreshed capital investment plan through 2030 is 19% higher than last year's plan. The diversified plan includes natural gas generation, renewables, energy storage, and grid investments that strengthen reliability and position our system for growing customer demand. This increases our expected investment growth rate to 13% and supports an acceleration of our long-term earnings growth rate to 8% plus from 2027 through 2030.

Just as importantly, customers benefit from how we structure this growth. Our commitments are clear. Existing customers should benefit from large load growth, not subsidize it. Large load customers will pay the full cost of serving them and their share of the system investments they require. In Iowa, we're pleased to announce a one-year extension of IPL's retail electric base rate stability plan through the end of 2030. Giving customers another year of greater certainty about this portion of their electric bill. At the same time, we expect to continue investing in our business and earning our authorized returns throughout this period.

This extension is a tangible, best in class example of driving affordability and demonstrates that base rate stability, continued investment, and financial performance can advance together.

In Wisconsin, economic development creates an opportunity to spread fixed system costs across a broader customer base and our recently filed large load tariff establishes a consistent and transparent framework for future customers. In addition to advancing Iowa's electric base rate stability with the one-year extension, our financing strategy directly supports affordability in both Iowa and Wisconsin. Earlier this week, the U. S. Department of Energy announced it had closed on a $5.1 billion guaranteed loan program with Alliant Energy.

Over the life of the 30-year loans, when fully funded, we estimate up to $1.2 billion of cumulative customer savings when compared to traditional debt financing. This federally backed financing helps lower the cost of building generation and critical energy infrastructure our customers depend on while strengthening the grid.

Finally, our pipeline extends well beyond our current plan. To date, we have three sites which total 3.4 gigawatts of low growth. Across our service territory, we are focused on turning prospects into projects. We expect this work to produce approximately one additional gigawatt of contracted large load within the next six months, creating meaningful upside to our current capital plan. Consistent with our commitment to raise the bar, we would update our CapEx plan accordingly. Taken together, these updates demonstrate the Alliant Energy Advantage in action, the ability to convert economic development into durable growth while driving affordability, strengthening reliability, and earning our authorized returns.

Before I turn the call over to Robert, I want to recognize our employees, from our field teams responding to storms and maintaining our diverse generation fleet, to those advancing critical projects and supporting customers. Their skill, dedication, and care drives our progress. I am proud of this team and grateful for all they do. We have built strong momentum. We have greater visibility into our long-term growth and we remain focused on disciplined execution our investors and customers can count on. I'll now turn the call over to Robert.

10:39

Robert DurianExecutive Vice President and Chief Financial Officer

Thank you, Lisa. And good morning, everyone. Yesterday, we reported third quarter, 2026 gap earnings of $1.52 per share. Our third quarter near-to-date ongoing earnings demonstrate the strong financial and operational progress our teams have delivered across the business. As shown on slide eight, the year-over-year third quarter increase in ongoing earnings reflects the consistent execution of our strategy, primarily driven by higher revenue requirements in AFEDC associated with capital investments across our Iowa and Wisconsin utilities, timing of income tax expense, which will reverse in the fourth quarter and have no impact on full-year results, higher equity earnings from our corporate venture fund investments, five cents per share impact on electric margins from above normal temperature normalized retail electric sales, reflecting continued commercial and industrial strength, particularly in Wisconsin and early contributions from ramping data center loads in Iowa.

These positive drivers were partially offset by the expected costs of supporting our growth, including higher other operations and maintenance expenses related to the growth of our business and expanded generation fleet and higher financing and depreciation costs associated with our growing rate base. Based on our strong performance through the first nine months and improved visibility into the fourth quarter, we are narrowing our 2026 full-year ongoing earnings guidance to the top half of our original guidance range, which is $3.41 to $3.46 per share. Yesterday, we announced our 2027 earnings guidance range and dividend target as shown on slide nine. Together, they reinforce our confidence in continuing to deliver an attractive total sharing of return, which is projected to be greater than 11% per year over the 2027 to 2030 planning period.

Our 2027 full-year ongoing earnings guidance of $3.63 to $3.73 per share represents 8% growth over the midpoint of our original 2026 earnings guidance.

Our 2027 annual common stock dividend target is $2.25 per share, a 5% increase over our 2026 annual dividend target. We are moderating the pace of dividend growth to help fund our larger capital plan efficiently. We will continue to target a payout ratio of 60% to 70% and expect to operate near the lower end of that range during this period of elevated investment opportunity. As shown on slide 10, the strength of our progress supports an increase in our long-term earnings growth expectations. We raised our long-term annual earnings growth target to 6 to 8% plus and increased and extended our expectations to 8% plus from 2027 to 2030.

Reflecting our confidence in the durability of our large load opportunities, driving our investment growth, the revenue and cash flow contributions from data centers ramping into the plan and our continued operational excellence. As shown on slides 11 and 12, our refresh capital investment plan for 2027 through 2030 totals $15.9 billion, a 19% increase above our prior four-year plan. This translates to a 13% compounded annual growth rate in rate base plus construction work in progress up from 12% last year. The incremental investments from last year supporting this growth include 1.2 gigawatts of additional natural gas combustion turbines to meet growing customer energy demand and an additional 200 megawatts of energy storage to support system resiliency and integration of new load growth.

The difference between the projected 13% kegger and our earnings growth target through 2030 of 8% plus primarily reflects approximately 375 basis points of estimated dilution from equity issuances and approximately 50 basis points of estimated dilution from refinancing, maturing, non-utility and parent debt.

Our capital plan takes a disciplined approach to investing in customer focused infrastructure including natural gas generation, renewables, energy storage and electric and gas distribution.

We remain confident in our ability to execute this diversified plan responsibly. Our expectation to convert additional large load growth to incremental capital expenditures in the plan creates substantial further investment upside. We will incorporate those opportunities into future capital plan updates as projects satisfy our criteria for inclusion.

To fund this larger capital plan, we have developed an efficient and disciplined financing strategy through 2030, summarized on slide 13. This financing plan maintains a strong balance sheet throughout the planning period. Our execution to date gives us confidence that we can finance this growth while maintaining financial flexibility and protecting customer value. This increasingly efficient financing mix is supported by a combination of growing cash from operations as data center loads ramp in accordance with contract terms, continued strong execution of our tax credit monetization program with approximately $2 billion of tax credits expected over the planning period. Benefits from the Department of Energy's recent commitment of approximately $5 billion which provides lower costs, long-dated and flexible financing and reduces costs for customers, hybrid financing instruments that provide equity credit at a lower after tax cost than common equity and disciplined common equity issuances.

Equity funding represents approximately 40% of our incremental capital expenditures at the low end of our previously stated range of 40 to 50%. Our proactive execution of equity has already secured approximately $1.1 billion of the $2.7 billion of common equity in the updated four-year financing plan through forward equity agreements. This effectively addresses our expected equity needs through the first half of 2028 and provides meaningful flexibility as we continue to grow. We are confident with our ability to execute the remaining equity requirements over the planning period with settlements weighted toward the next several years and moderating thereafter. We expect to continue using ATM programs while retaining the flexibility to act opportunistically when marking conditions are favorable.

Turning to slide 14, we've outlined our remaining debt financing activity for 2026 along with our plans for 2027. For the remainder of 2026, we expect to complete up to $200 million of additional long-term debt at IPL and up to $300 million at WPL.

Looking ahead to 2027, we expect to issue up to $2.8 billion of long-term debt, including up to $1 billion at a line energy finance or the $1.3 billion at IPL and up to $500 million at WPL. Across both years, we anticipate financing at our two utilities to include funding through the recently approved U. S. Department of Energy Loan Program.

Finally, I'll provide an update on the regulatory initiative shown on slides 15 and 16 along with our plan future filings. We continue to advance this work with transparent and constructive engagement in both states. We recently filed a large load tariff in Wisconsin and an ICR application for a second Google project in Cedar Rapids and expect decisions back on both in the first half of 2027.

Looking ahead to our planned regulatory filings in conjunction with our updated capital expenditure plan, we expect to make additional regulatory filings for energy resources that enhance reliability, further diversify our portfolio, and meet growing customer energy needs.

We expect to file an individual customer rate application for the QTS Clinton data center in the first half of 2027. And in the spring, we expect to file the next Wisconsin retail electric and gas base rate review for forward test years 2028 and 2029. We are proud of the progress reflected in these results. Our teams are executing with discipline, our financing strategy as well positioned, and the opportunities ahead reinforce our confidence in delivering the strategy.

I will now turn the call back to Lisa.

19:52

Lisa BartonPresident and Chief Executive Officer

Thank you, Robert. Today's update demonstrates the alliant energy advantage, disciplined execution, accelerating growth, and greater value for customers and share owners. Our team's strong execution positions us to deliver, and we are excited about the opportunities ahead. We look forward to sharing our progress and speaking with many of you at the EEI financial conference. I'll now turn the call back to the operator for Q&A.

Questions and answers

20:24

Thank you. At this time, the company will open up the call to questions from members of the investment community. Please limit yourself to one question and one follow up. If you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again. We ask that you pick up your handset when asking a question to allow for optimum sound quality. If you are muted locally, please remember to unmute your device. Please stand by while we compile the Q&A roster. Your first question comes from the line of Nicholas Campanella with Barclays. Nicholas, your line is now open. Please go ahead.

21:05

Nicholas CampanellaAnalyst, Barclays

Hey, good morning. Thanks for all the updates.

21:08

Unidentified AnalystAnalyst

Good morning. It's time. Hey, I just wanted to confirm, thanks for the new growth rate outlook and a clear acceleration of rate base and load here. It's 27 kind of a new base to grow 8% plus off of, and then just taking into account the dilution. How are you framing the plus?

Can you be above 9% in this plan? Thanks.

21:31

Unidentified Management

Yeah, sure. Nick, you could either take the midpoint of the original guidance for 2026, which is 341 or the new guidance for 2027 or 368 and build it off of either one of those base amounts. And then for your second question regarding the plus sign, think of the plus sign as representing earnings growth of at least 8% each year over the 2027 through 2030 planning period. We'll probably see some periods of higher earnings growth and that minimum 8% and think of that as usually in line with years where we have some higher capital expenditures.

22:03

Nicholas CampanellaAnalyst, Barclays

Okay. Thank you for that. And then maybe just sounds like on the additional sites that you're working on right now, you're being very fruitiness in terms of having the local permitting, land control, the transmission studies. How would you compare the two to four gigs in advance versus the 10 sites that you're in active discussion with? What are the 10 sites equate to in a gigawatt number? Thanks.

22:30

Unidentified Management

Yeah, so we're not specifically labeling each of these sites. The way to really think about it, each site is a little bit unique. I will say this, it's a minimum of several hundred megawatts going up higher than that. The size does vary. And really what we were trying to do here is make sure that what we're giving you is growth that you can count on. Yeah, we've always made sure that we've got that our developers have the land, the line of sight with respect to land, that they have land control, that they're not speculative. We want to make sure that we have an appreciation for the load ramp that helps with making sure we can work with both ATC and ITC on getting the transmission access that they need and our ability on the generation side.

We have an extreme level of confidence and our ability to secure the generation that we need. I think what you're seeing is that with respect to timing, these data centers are really engaging with the communities and we're really pleased with that. There's a greater level of transparency. That's always been at the national level, the pushback that you've heard, and this level engagement is really getting communities to understand and appreciate the value of these data centers. I'll give you a little bit of an example here in Clinton. So QTS, for example, has been really talking about the property tax benefit and that's in that 22, possibly $60 million a year range.

And as a point of reference, the second largest company in terms of a property tax contribution is about $5 million a year. So taking that time to invest in these dialogs is important. And so what we will be doing is if there's an ESA that signs, you will update that on a quarterly basis, but the load in the CAPX is something that we would update at either E. E. I. or AGA. And quite frankly, with the future that we see, we would be disappointed if we didn't have another gigawatt in the next six months. And with that, we would be disappointed if we weren't updating our CAPX at AGA.

24:46

Nicholas CampanellaAnalyst, Barclays

That's very clear. I appreciate that. And just to clarify, the 10 is on top of the 3.4 gigawatts, or it's partially reflected in that.

25:02

Unidentified Management

This way. So from the three sites that we currently have, there's 3.4 gigawatts worth of data centers that have committed to those existing 3 sites. And there's additional growth opportunities within those sites. So then think about it. There's another 7 more. It's been one of those questions.

25:21

Nicholas CampanellaAnalyst, Barclays

Thank you very much.

25:21

Thank you for your next question comes from the line of Brini Singh with Bank of America. Brini, your line is now open.

25:30

Unidentified AnalystAnalyst, Bank of America

Good morning, guys. Thanks for the update. Thanks for taking the question. I guess, first, you know, you mentioned the 1 gigawatt in six months. I guess, how are you thinking about the next, for that next gigawatt, the capital intensity to disturb that, just given my accreditation changes and then the generation you announced with the previous ESA and Q1. And how do you think about the timing of that in terms of does it require the capacity and parallel? Or does that kind of depend on the curtailability?

26:09

Unidentified Management

Yeah, I would think of the capacity requirements of this. We always try and line up the generation capacity with the load ramps to be consistent with ensuring that we have the capacity ready to go and we have the cash flows lined up for when we end the construction cycle with the load ramp. So yeah, what we tried to signal to folks is think of our capital expenditure plan updates will largely be for every gigawatt of additional load. You're probably going to see somewhere in the neighborhood of $2 to $3 billion of additional CAPEX. And again, that's largely because we're focused only on the capacity resources need to serve these customers. We may have further opportunities in the future to be able to provide energy resources, but think of that as kind of upside further out in the plan than what we're targeting right here.

26:48

Unidentified AnalystAnalyst, Bank of America

Okay, thanks, Robert. And then just on the large load tariff in Wisconsin, how should we think about the proposal there and the economic benefits to existing customers and potentially differences to the previous ICR filings or similarities?

27:06

Unidentified Management

It really complements the previous ICR filings and what it does is it puts that umbrella around it consistent with what the commission was looking for. And, you know, in essence, just provides that level of clarity. But we do not expect any differences. We do not have to wait for a approval by the commission. The commission was very clear with us that if we have another data center to continue to to move forward with that and to notify them of those provisions, those ICR positions.

27:46

Unidentified AnalystAnalyst, Bank of America

Okay, perfect. Thanks so much, Lisa.

27:54

Your next question comes from the line of Julian de Mullen Smith from Jaffries. Julian, your line is now open. Please go ahead.

28:00

Unidentified AnalystAnalyst

Hey, good morning, team. Thank you guys very much. Appreciate the time. And I see that as always I got to hand it to you.

Maybe picking it up on just the offense side of this equation, right? You talk about an incremental customer announcement here. How do you think about that translating to RayK stayouts maybe in Iowa beyond this 2030 timeline again to the extent of which this would be incremental savings? And then related, how do you think about the pathway for data center load to enable maybe parallel Wisconsin stayouts here? And maybe any further related commentary about Crowley and some of the more term, commentary of late, if there's anything that you care to share as of yet?

28:43

Lisa BartonPresident and Chief Executive Officer

There are a few questions in there, Julian. I applaud you on that. First of all, we're super excited to be able to announce the extension of our rate stability plan that we have in Iowa. I think that that has really demonstrated the attractiveness of the jurisdiction for other economic development. As you alluded to, we have Masabi and which we're very, very excited about that. Actually, you know, Raja and I had an opportunity to go and tour their state of the art mine in Minnesota and just great progress on that. What I will say about Masabi is that we have firm demand to secure their initial phase of growth in the plan that we've announced to the extent that they make further investments.

We would be updating our capacity needs. And as I mentioned in my talking points, we are focused on their non curtalable. This is a type of load that's very curtalable. That's just the nature of the sector. And so what we are going to make sure that we're doing is building to support their non curtalable capacity needs. In terms of what the outlook is, and what we'll do on a constant basis is look to calculate what we can expect in terms of a continuation of the stay out. We certainly never want to be in a situation where we over promise and under deliver. So as we continue through the timeline, we'll be evaluating that at EEI and so forth.

With respect to Wisconsin, our rate review proceeding will be next year, early next year. We continue to see that data center growth really helps to drive affordability, taking those fixed costs and spreading it out over a broader base. There was a recent CSI paper that was issued in Iowa that just cited those benefits. So we look forward to having those discussions with all of whoever actually moves forward with the commission. We've always had practical and pragmatic leadership at the state level while we continue to feel that when we show everyone the facts behind the numbers that the support for data centers will be there. It really speaks for itself.

And I do think that that's what sets us apart. I mean, we have best-in-class solutions for affordability. I mean, where else can you have 0% rate increases in this country?

Indeed. No, it does speak to it.

31:28

Unidentified AnalystAnalyst

If I can follow up a little bit on the other side of the ledger here, on the cost side, is this more of a structural thing or more of a pull forward on the O&M just with the move to the 5% and then a second embedded one? How do you think about de-risking the procurement and EPC side, right? You guys are always thoughtful. We're seeing some peers or yours move in new and novel ways. How do you think about just that side of the equation that you announced this uptick here?

31:55

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah, Gillian, first up with the O&M expenses, think of that is we're very focused on ensuring that we have strong reliability for our customers. So we're besting more money in the energy, delivery side of the business, and also in the generation side of the business. We know how important the generation facilities are to meeting the capacity requirements and the growing demand of our customers. So we're investing more money, as you can imagine, as we're building more generation, those costs are going to continue to increase because we have more facilities to be able to maintain. From a pull forward perspective, not significant amounts we've actually had, I would say fairly neutral overall temperatures to date for the year.

And so we're just managing the business based on our original projections for the year.

32:34

Lisa BartonPresident and Chief Executive Officer

And Gillian, to your question with respect to how we're managing from a CAPEX standpoint, obviously it's not our first rodeo. We've been doing this for a long time successfully. We we build in contingencies into our projects and we're very aware of the market conditions where we're building these facilities. So that's all tied together. High level of confidence in our ability to execute.

32:59

Unidentified AnalystAnalyst

Got it. And just one quick clarification here. 26 to 27 days, or I mean, it's slightly different outcome. It doesn't matter. You can read either way.

33:14

Unidentified Management

Yeah, the matter of our next question earlier.

33:14

Lisa BartonPresident and Chief Executive Officer

Yeah, you're right, Gillian. The math works the same either. 3 41 off of 2026 or 3 68 off of 27, you'll get to the same point.

33:19

Unidentified AnalystAnalyst

Okay, awesome. Thank you guys.

33:28

Your next question comes from the line of Paul Fremont with Leidenberg about Paul. Your line is now open. Please go ahead.

33:36

Paul FremontAnalyst, Ladenburg Thalmann

Thanks. I guess my first question is, is Masabi included now in the two to four gigawatts in advanced discussion? And are they also a part of the one gigawatt that's likely in the next six months?

33:52

Lisa BartonPresident and Chief Executive Officer

So the two to four that we've talked about and it continues to be data center growth. So Masabi is not included in that. And it's not that would be in the addition. Sorry. Yeah, sorry. And it's not included in what we anticipate for the additional gigawatt that centers.

34:12

Paul FremontAnalyst, Ladenburg Thalmann

And then are you able to put sort of a capacity size amount to a potential Masabi demand?

34:26

Lisa BartonPresident and Chief Executive Officer

So not at this point at this time. I mean, when you think about we've had active conversations with them. It is ultimately their call and their decision on when to talk about the size of that plant that's very consistent with what we do with all of our other customers. But again, we do have the firm demand. They're non curtailable factored into our plan for their first phase.

34:57

Paul FremontAnalyst, Ladenburg Thalmann

Great. And then should we assume that you've added 400 megawatts to the two to four because in the past that two to four included Google to?

35:05

Lisa BartonPresident and Chief Executive Officer

No, I think that was part of the 400 megawatts that we announced earlier this year was part of the two to four. So that would not be. So it's really one point. So it's like 1.6 to 2.6.3.6.3.6.

35:21

Paul FremontAnalyst, Ladenburg Thalmann

Yeah. Yeah. Okay. I think that's it for me. Thank you very much.

35:35

Lisa BartonPresident and Chief Executive Officer

Thanks, Paul.

35:35

Your next question comes from the line of Anthony Crowdo with Mizzou. Anthony, your line is now open.

35:45

Anthony CrowdellAnalyst, Mizuho

Hey, good morning, team. Appreciate the update. Just two quick ones. I guess for Iowa, the ability to earn your authorized ROE to the rate freeze, I guess, in the rate freeze through 2030. You talked to us how much depends maybe on tax credits or flexing on M and how much cushion do you have if you start to see O&M or depreciation run a little ahead of plan.

36:11

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah, good question, Anthony. Yeah. So think of it is when you look at the capital expenditure plan that we've announced here as far as the there's about 1.2 gigawatts of energy storage built into the plan. And think of that is driving a pretty significant amount of tax credit for us. It gives us a high level of confidence to be able to navigate the plan in any modifications we might see either sales or O&M expenses or other costs through the 2030 period. And that's what gave us the confidence to be able to extend it out to that time period.

36:44

Anthony CrowdellAnalyst, Mizuho

Got it. And then I think Nick had asked this question earlier. The 27 midpoint of 368 is about 7% above the narrow midpoint of 26. And I guess what has to change if I think about 20 to 30? What has to change in that to get to the aid plus? Is it data center load ramp or is it rate based growth? So what's changing at now? I pivot from 7% to 8 plus in two to three years.

37:16

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah. And so the way we think about it is we're starting from the midpoint of the original guidance for 2026. That was the 341. And if you build 8% off of that, that equals roughly the 368th that you're referencing from a 2027 time period. Think of the biggest driver as to how high we may get into the earnings growth is largely dependent upon the capital expenditure plans. We've obviously updated the refresh plan to show the 15.9 billion that we've now have over four years. And we continue to work on what I'll call capital upside for different opportunities, including the additional load growth that we may see from the data center prospects that we have. And then we've got some additional things that we're pursuing, like when repowering other things.

There might be additions to the plan. And so if you watch the CAPX, that should be a good indicator as to where we're going to be in the growth rate going forward.

38:01

Anthony CrowdellAnalyst, Mizuho

Great. That's all I had. I'll see you guys at EI.

38:11

Your next question comes from the line of Andrew Wiesel with Scotia Bank. Andrew, your line is now open. Please go ahead.

38:16

Unidentified Management

Good morning, Andrew.

38:16

Andrew WeiselAnalyst, Scotiabank

Hi, good morning, everyone. Hi, I'll throw in a congrats to the Brewers. I know you're not trying to walk you, but that's the source of statewide private. Well, we're all watching. A lot of info today. Congrats on some good updates, but a couple things I wanted to clarify. So first on the Kager, you've got two figures out there. It sounds like you're very clearly guiding to 8% or better. So what exactly does the 6% to 8% refer to? Where would it be less than 8%?

38:46

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah, think of that as a much longer term, Kager, for us. But we have great visibility to the 8% plus from the 2027 through 2030 time period. And kind of our vantage point is we're going to continue to work on trying to extend that and hopefully increase that over time as we continue to build in what I call future ways of upside capital to the plan. So I would focus more on the 8% plus right now for the 2027 through 2030 time period. And then we'll continue to update you guys as we get further along with the upsides that we have largely related to the low growth that we're pursuing right now.

39:25

Andrew WeiselAnalyst, Scotiabank

Like 2031 and beyond 6 to 8, but you're going to work on making that more 8% plus continued. Is that the way to think of it?

39:34

Robert DurianExecutive Vice President and Chief Financial Officer

That's a great way to think about it. But have a pretty high level of confidence that we're going to be able to keep that more 8% plus going into the future.

39:44

Andrew WeiselAnalyst, Scotiabank

Okay, great. Thank you. Good on equity. The change in equity you show as 40% financing of incremental CapEx, but the new outlook is 2.7 billion compared to the old outlook of 2.4 billion. That's only an increase of 300 million versus 2.5 billion of CapEx. That's about 12%. So it's a great thing to have less equity than 40%. But help me bridge that gap.

40:09

Robert DurianExecutive Vice President and Chief Financial Officer

Sure, Andrew. Yeah, think of there's about $600 or $700 million that we're going to actually execute here before the end of the year. And so we've built that into the plan. So when you add that $700 million to the 2.7 billion that's going to happen from 27 to 30, you actually get up to $3.4 billion of future equity. So it's just a matter of the timing difference between the base here you're starting with. If you start with 26, it's actually $3.4 billion.

40:34

Andrew WeiselAnalyst, Scotiabank

Okay, so there's a lot still coming before your end. Okay. One last one on the IPL stay up. The additional year, it sounds like you're pointing to tax credits. Are those coming in better than you expected? Or is the additional year more a function of the DOE loan savings or better underlying demand trends? Or is it all the above? You keep pointing to the tax credits, but I thought those were kind of well understood and expected.

41:02

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah, great question. So think of it a couple different things that we're seeing as far as benefits more recently. One is we continue to layer in more energy storage. And so we added another couple hundred megawatts of energy storage to the most recent capital plan. The other thing is I'm really proud of the team. They're really focused on trying to figure out how they can maximize the tax credits. So most often with a battery storage project, you'll get a 30% baseline ITC. But then you do have the opportunity if you locate those into certain energy communities, you can get an additional 10% credit. And then more recently, we've been focused on trying to figure out if we can get to domestic content.

So if we can source enough of the equipment for the projects from domestic sources, you get an additional 10%. And so you can get anywhere from 30 to 50%. And we see a better pathway to be able to get to those higher percentages for some of the more recent projects that we put into the plans. We're pretty excited and pretty proud of the team focused on that because we know how it's going to help out customers in the future.

41:58

Andrew WeiselAnalyst, Scotiabank

Okay, that sounds very positive. Thank you so much.

42:07

Your next question comes from the line of Adita Gandhi with Wolf Research. Adita, your line is now open. Please go ahead.

42:13

Unidentified AnalystAnalyst

Hi, good morning, Lisa and Robert. Thank you for taking the question. Robert, I want to go back to the one gigawatt equals to two to three billion of capex rules that you gave us and tie that a little bit into the one gigawatt that you'll expect to contract in the next six months. Can you give some color on how much of that we should expect within the current planning period versus after the current planning period? And is 40% a good rule of thumb for thinking about the equity content for the additional capex?

42:54

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah, great question. So yeah, when you think about that next gigawatt of load, the ramp rate from that is actually going to start more in that 2930 time frame. And so we really are targeting most likely to have the capacity resources available for that later in the plan. So think of that as more in the maybe 2031 time frame when it comes to a gas generation. And so you'll see a mix. Some of it will be in the 27 to 30 time frame. But then there will also be some of that capex that'll actually be in the 31 and beyond time frame. So it's a little bit of a mix of both.

43:24

Unidentified Management

And to your second question, yeah, we've talked in my prepared remarks about the impact of equity dilution on the incremental capital expenditures and the growth rate of the investment kicker and how the difference between that and the growth rate of the key drivers there, like I said, we're equity dilution as well as the refinancing dilution. I think one thing that's really important for you guys to understand is as we look further out into the future, we actually think going forward the investment, the incremental capex that we have is actually going to be funded with a relatively lower level of new common equity than our previous guidance of 40 to 50%. So we'll update that more when we friend feature updates as far as incremental capex.

But you should probably expect us to do better than that 40 to 50% in the future. And indeed, one of the things that I would point out is that as I mentioned, we would be disappointed if we were not at AGA updating our capex plan and what you would see there would be a the resource plan associated with serving loads. So keep in mind, we are always looking at this on a portfolio basis. So certainly stay tuned.

44:38

Unidentified AnalystAnalyst

That's super helpful. Thank you. And just to clarify, Robert, the equity would be lower than the 40 to 50% just because of hard cash flow from the data centers as you as you get to be the out here as a current plan and beyond that.

44:49

Robert DurianExecutive Vice President and Chief Financial Officer

Yeah, exactly. So yeah, when you think about the ramping of the load growth, obviously the cash flows are going to ramp with that as well. And so we peak out in that 2031 time frame with the current load that we got in the plan as we layer additional load in there. We see some stronger cash flows in the latter part of the plan. And that's what gives us the confidence that we may not need as much incremental new common equity with the incremental capex that we'll layer in in the future.

45:11

Unidentified AnalystAnalyst

Great. That's all I have. Thank you.

45:18

Ms. Gell, there are no further questions at this time. With no more questions, this concludes Alliance Energy's third quarter 2026 earnings call. A replay will be available on our investor website. Thank you for your continued support of Alliance Energy. And please feel free to contact me with any follow up questions. This concludes today's call. Thank you for attending. You may now disconnect.

Other Alliant Energy earnings calls

  • Q2 2026 earnings call

    Management framed growth execution as strong enough to offset mild weather, while signaling greater long-term specificity after updating capital plans in Q3.

    Jul 31, 2026Confident0.78
  • Q2 2025 earnings call

    Management framed data-center demand as increasingly tangible, while emphasizing tax-credit protection, regulatory execution, and financing flexibility.

    Aug 08, 2025Confident0.82
  • Q3 2024 earnings call

    Management framed data-center demand and expanded generation investment as supporting long-term growth while weather and workforce actions shaped near-term results.

    Nov 01, 2024Confident0.78
  • Q1 2024 earnings call

    Management framed the quarter as resilient execution despite record warmth, with cost control, financing, and resource planning supporting growth objectives.

    May 03, 2024Positive0.65
  • Q4 2023 earnings call

    Management framed 2024 as another consistent growth year, supported by renewable investment, cost control, tax credits, and constructive regulation.