2023 adjusted EPS guidance
$2.85 to $3lower end raised $0.05
2023 free cash flow goal
$200 million
Draco contract value
over $200 millionbooked in Q3
Medical 2025 target revenue
$200 million2025
Medical 2025 target EBITDA
$75 million2025
Q3 government EBITDA margin
between the Q2 level and approximately 21.5%historical average approximately 21.5%
SMR capacity expansion
100,000 square feetpotential addition

Summary

Management framed the call around accelerating nuclear demand, while stressing that hiring-related margin pressure should ease by Q4 and capital spending remain disciplined.

  • $200M$200M-plus Draco award adds BWXT’s first space nuclear-thermal propulsion demonstration to its Pele and Navy programs.
  • 20%Medical EBITDA turned positive in Q2, ahead of management’s second-half target, with growth expected to exceed 20% for 2023.
  • SMR demand may require added commercial manufacturing capacity; management is assessing expansion, including roughly 100,000 additional square feet.

Guidance

  • $2.4B2023 revenue over $2.4 billion, with high-single-digit organic growth
  • $475M2023 adjusted EBITDA about $475 million; margins approximately 20%
  • $2.852023 adjusted EPS $2.85 to $3 per share
  • $350M2023 adjusted pre-tax income around $350 million
  • $200M2023 free cash flow goal $200 million
  • 21.5%Q3 government EBITDA margin between Q2’s level and the approximately 21.5% historical average
  • Q4 government EBITDA margins near all-time highs
  • $15M2023 corporate EBITDA expense toward the higher end of the $10 to $15 million range

What analysts pressed on

  • 01Hiring and labor capacity: net hires ran about twice Q1’s level, while utilization fell over 200 points year over year at three major naval sites.
  • 02Draco contract timing and structure: booked in Q3, with most revenue in 2024–2025 and a smaller amount in 2026.
  • 03Technetium-99 approval timeline: management declined to forecast FDA timing or identify public milestones, but expects full-suite commercialization in 2024.
  • 04SMR capacity needs: management is evaluating expansion, potentially adding about 100,000 square feet as demand develops.
  • 05Medical growth and profitability: Q2 EBITDA turned positive, and management expects 2023 revenue growth above its 20% target.
  • 06Design execution risk: management cited available Canadian design capacity and fixed-price experience; Pele and Draco are cost-reimbursable.

Notable disclosures

  • Q2 medical EBITDA turned positive, earlier than management’s goal of reaching that milestone sometime in 2023’s second half.
  • Draco was booked in Q3, and its OTA structure leaves no standard federal acquisition appeal path.
  • FDA consent lets BWXT pivot from the MER route to Darlington irradiation, enabling a full range of generator sizes.
  • Management said commercial SMR growth could require roughly 100,000 additional square feet, with expansion costing tens of millions of dollars.

Risks raised

  • New-hire training and indirect labor costs reduced utilization and pressured government margins; Q3 remains below the historical average.
  • Commercial manufacturing capacity is heavily utilized, and management expects added capacity may be needed if SMR demand accelerates.
  • Hanford contract transition is not expected before early 2024, while the award remains subject to DOE action after a protest.
  • FDA approval timing remains uncertain, with no public milestones expected before the next regulatory steps.

Tone: Confident 0.72

Management emphasized strong demand, new program wins, improving hiring and medical progress, while acknowledging near-term margin pressure and capacity needs.

Who spoke

Company

  • Chase JacobsonVice President of Investor Relations
  • Rex GevedenPresident and Chief Executive Officer
  • Robb LeMastersSenior Vice President and Chief Financial Officer

Analysts

  • Pete SkibitskiAnalyst, Alembic Global
  • Unidentified AnalystAnalyst, CJS Securities
  • Peter ArmentAnalyst, Baird
  • David StraussAnalyst, Barclays
  • MichaelAnalyst, Truist Securities
  • Andre MadridAnalyst, Bank of America

Full transcript

Analyst questions are marked with a bar. Timestamps are into the recording.

Prepared remarks

00:00

Ladies and gentlemen, welcome to BWX Technologies' second quarter 2023 earnings conference call. At this time, all participants are in a listen-only mode. Following the company's prepared remarks, we will conduct a question and answer session, and instructions will be given at that time. I would now like to turn the call over to our host, Chase Jacobson, BWXT's Vice President of Investor Relations. Please go ahead.

00:27

Chase JacobsonVice President of Investor Relations

Thank you, Brianna. Good evening and welcome to today's call. Joining me are Rex Jeveden, President and CEO, and Rob Lemasters, Senior Vice President and CFO. On today's call, we will reference the second quarter 2023 earnings presentation that is available on the Investor Section of the BWXT website. We will also discuss certain matters that constitute forward-looking statements. These statements involve risks and uncertainties, including those described in the Safe Harbor provision found in the investor materials and the company's SEC filings. We will frequently discuss non-GAAP financial measures, which are reconciled to GAAP measures in the appendix of the earnings presentation that can be found on the investor section of the BWXT website. I would now like to turn the call over to Rex.

01:16

Rex GevedenPresident and Chief Executive Officer

Thank you, Chase, and good evening to everyone. Earlier today, we reported solid second quarter results that were slightly ahead of our expectations, highlighted by robust double-digit organic revenue growth, good execution, and improved free cash flow. Given our strong performance in the first half of the year, coupled with favorable demand trends, we now expect high single-digit revenue growth and are raising the low end of our 2023 adjusted EPS guidance by $0.05 to $2.85 to $3.

Before I dive into the highlights of the quarter, I would like to provide a state of the union on what we are seeing in our key nuclear end markets. There are several underlying secular themes supported by the increasing use of nuclear solutions in our global security, clean energy, and nuclear medicine end markets. And given BWXT's extensive experience in the industry, our exceptional nuclear design capabilities, robust manufacturing footprint, and vertical scale, we are very well positioned to benefit from the growing demand that we see in the years ahead.

The first of two emergent large themes driving heightened interest in nuclear is the great power competition. This drives the global security market, but is becoming an increasingly important stimulant in the commercial nuclear power market as well. Before explaining that, let me note that the U. S. government's strategy to bulk up on our strategic force capabilities, including a recapitalization of the U. S. naval nuclear fleet, is in direct response to this geopolitical reality. We have supported this strategy with investment in BWXD's Navy plants to enable a greater level of naval nuclear shipbuilding, especially in the second half of this decade and beyond, something the industry required given its aging infrastructure. The current 30-year shipbuilding plan calls for 10 years of serial procurement of Columbia-class submarines beginning in 2026 and the potential for the Ford-class aircraft carrier to move to four-year centers beginning in 2028.

This is on top of consistent procurement of Virginia-class submarines and a new demand for submarines from Australia as part of the Australia-UK-U. S. Trilateral Security Agreement known as AUKUS.

Beyond our core naval propulsion business, we are seeing the precipitation of demand for advanced nuclear reactors by various government agencies looking for innovative clean power and propulsion solutions in space and other domains. These systems can improve the security posture of the U. S. , especially in emergency or warfighting scenarios. Last year, BWXD was awarded separate contracts by the Department of Defense's Strategic Capabilities Office to build a prototype microreactor called Project Pele and to manufacture the TRISO fuel to power that reactor.

The ultimate objective of this program is to supply high-density off-grid power to military bases, among other applications. We are tracking well on this project and are seeing new interest from various defense agencies who view this as a potent and differentiated capability. Just this quarter, I joined other BWXD executives in an engagement with a combatant command to discuss how PELA can be deployed in an off-grid application to eliminate vulnerabilities related to the diesel and broader supply chain and provide reliable high-intensity power for baseload radars, missile defense systems, and electric transportation fleets. Of note, Project Pele and a related writer to support a study about a potential microreactor in Guam received strong bipartisan support in the Senate Armed Service Committee's markup of the fiscal 2024 National Defense Authorization Act.

And just last week, we were selected along with our prime partner Lockheed Martin for the Draco project, the first demonstration of a nuclear thermal rocket engine in space. With this contract expected to be valued at over $200 million, we will have the government's cornerstone nuclear fuel and reactor programs in our portfolio, serving the terrestrial and space domains to complement our Navy franchise. Beyond national security applications, the commercial markets are pivoting to nuclear energy solutions to meet future power demand and to improve their energy security posture. Notably nations in Western Europe which once stopped their investment in nuclear are now announcing plans to begin new large reactor build outs and or construction of multi-unit small modular reactor plants.

We have exposure to these opportunities through our capabilities in fuel and fuel handling, component manufacturing, field services, and design knowledge. We are anticipating potential new builds in Canada and in other interesting markets including the U. S. , U. K. , Poland, Romania, South Korea, and others. We possess the largest operating nuclear qualified manufacturing site in North America where we serve a range of projects including SMR development, plant life extensions, and operation support for the installed nuclear base. Our scope on SMRs can range from around 50 million to over 100 million per reactor. Importantly, our role as a merchant supplier serves as a vital resource to reactor designers that are in need of well-established and qualified manufacturing and supply chain management.

On this note, yesterday we announced that TerraPower selected BWXD to design the intermediate heat exchanger for its Natrium demonstration project in Wyoming, and they highlighted our role as a designer and fabricator as key to the project's planned achievements. As opportunities like this develop with new and existing customers, we are in the early days of assessing our capacity to satisfy this burgeoning demand to take an even larger leadership role in the commercial nuclear market. This transitions well into the second major theme driving nuclear interest, and that is decarbonization of the grid. As technology has advanced, nuclear is increasingly seen as the obvious and preferred source for reliable baseload clean energy production. Last month, Ontario Power Generation announced it is planning for three additional VWRX300 small modular reactors at the Darlington site in addition to the one planned for completion by the end of the decade.

Also in Canada, Bruce Power launched a study to assess the feasibility of adding nearly 5 gigawatts of large-scale nuclear power as the Ontario government seeks to double the scale of the grid by 2050 to meet projected demand. There is growing demand outside of Canada as well. Earlier in the year, the United States Department of Energy invited utilities to apply for up to $6 billion in civil nuclear tax credits.

Some of the largest domestic utilities like the Tennessee Valley Authority as well as large industrial companies around the world are considering new nuclear investment. In Europe, the UK government recently opened a competition to develop SMRs as it seeks to increase its nuclear power generation capacity to 24 gigawatts by 2050 from approximately 6.5 gigawatts today. And many other countries and large utilities in Europe are signaling interest in nuclear as well. With the growing demand for nuclear power, we are seeing new technologies for SMRs and microreactors come to the market from both established and startup nuclear companies. We view this as positive for the industry overall and believe that our full suite of nuclear solutions, including reactor design, fuel fabrication, manufacturing, and services position us well to maintain a leading market position in commercial nuclear power.

feel even more convicted that our long view and persistent investments in nuclear even in uncertain times have positioned BWXT to capitalize on the significant upcycle we anticipate in these compelling markets. To be clear we do intend to continue to drive our business through innovation and following a super cycle of investment in our infrastructure the past few years in particular in naval reactors and nuclear medicine manufacturing we are position to continue growing at healthy organic rates with much more modest capex investments by layering in incremental capex to support growing demand for micro reactors or smr component manufacturing capacity or even novel automated or ai driven naval manufacturing equipment we expect to balance earnings growth alongside free cash flow and achievement of high returns on invested capital Our growth investments also extend to human capital.

Over the last year, we've made multiple additions to our executive leadership team and are continuing to add to our operational and functional support teams to ensure we have superior talent necessary to address the strong growth we see ahead. Turning back to the quarter, our second quarter results were ahead of expectations. The quarter was boosted by robust 11% organic growth, leading to a record level of second quarter revenue. Despite this growth and as expected, our adjusted EBITDA and earnings per share declined year over year due to the margin impacts of onboarding new team members, operational improvement investments, as well as less favorable product mix, and the impact of lower pension income and higher interest expense on earnings per share.

Turning to our segments, in government operations, we reached an important milestone during the quarter. I am pleased to report that we shift the final missile tube under our Block II contract originally signed in 2017. While this business line has had its challenges, I am extremely proud of our team's dedication and hard work to complete this project and deliver a superb product to our Navy customer. We are working with our partners to recover costs associated with this contract and expect a resolution giving our steadfast support to the Navy over the course of this challenging product evolution.

As we discussed last quarter we expected some near noise in our government operations margin performance quarter to quarter as the streamlined hiring and training processes that we implemented over the last year began to kick in and we had a greater less experienced workforce Because of this, along with the timing of work across our portfolio and less favorable product mix, mainly related to a strong increase in advanced technologies, which has mostly cost reimbursable contracts, we experienced some transient margin pressure in the second quarter. Despite that, our businesses performed well, and we expect to see improving margins in the third and fourth quarters.

Rob will provide more detail during his remarks. In April, a BWXT-led joint venture was awarded the 10-year Hanford Integrated Tanks disposition contract by the DOE because of our superior bid. After going through a protest process with the DOJ, the contract decision is now back in the hands of the DOE, and there are a variety of options it can take in deciding the best path forward.

We will provide an update on this process as appropriate, But at this point, do not expect a contractor transition at the site occurring until at least early 2024. Other projects in our technical services group are performing well, and we are seeking multiple new award opportunities, such as the Portsmouth Paducah Operations and Site Mission Support and the Pantex Management and Operations Contracts, among others.

Moving on to commercial operations. our core nuclear power business performed well during the quarter driven by ongoing refurbishment and life-expensive projects on a number of reactors in the Canadian fleet. As I mentioned earlier, the Canadian government and large Canadian utilities are committed not only to maintaining and extending the lives of their existing fleet of nuclear power plants, but also to adding new nuclear capacity with the installation of SMRs and potentially new large plants as well. At BWHD Medical, we had another solid quarter with over 20% organic revenue growth in the first quarter of positive E to doc. We face the nuclear medicine market as a full service player in radioisotopes with a base of diagnostic isotopes, additional layers of therapeutic isotopes, and contract drug manufacturing.

We are enjoying strong demand for diagnostic isotopes such as strontium and germanium that are used in cardiac and cancer image studies as well as in therapeutics where we expect significant growth opportunities in the manufacturing of active pharmaceutical ingredients like lutecium and actinium that support innovators and pharmaceutical companies engaged in late stage clinical trials of products that will change the face of cancer therapy. As it relates to our TEC99 product deployment, we received formal communication from the FDA in June with questions and data requests required for final approval. With no significant surprises in that communication and in follow-up discussions, we now have formal consent to pivot directly to our target delivery system at the OPG Darlington site.

This will enable us to achieve commercialization of the full product suite, including large generators in 2024. With a generator product that is essentially identical or superior to those on the market today we intend to stabilize the nuclear medicine ecosystem with this critical and foundational diagnostic device used in thousands of procedures every year to sum it up we had a good first half of the year with strong organic revenue growth good execution solid cash flow and a number of important lens across our businesses our in markets are gaining momentum and we are investing in our facilities and our people to ensure that we are positioned to attack the most promising opportunities in these extremely compelling nuclear markets.

Let me now turn it over to Rob to discuss the second quarter financial results in more detail and to discuss our updated 2023 guidance.

Questions and answers

15:38

Robb LeMastersSenior Vice President and Chief Financial Officer

Thanks, Rex, and good evening, everyone. I'll start with some total company financial highlights on slide four of the earnings presentation.

Second quarter revenue was up 11% on a consolidated basis, with government operations up 13% and commercial operations up 2%. This growth led to robust second quarter revenue of $612 million.

Despite our strong revenue growth, second quarter adjusted EBITDA was down year-over-year, as expected. Adjusted EBITDA was $107 million, down 7% year-over-year, as higher revenue was offset by lower margins in both segments due to onboarding inefficiencies, operational improvement investments, and less favorable product and services mix in both government operations and commercial power, as well as higher corporate costs.

Adjusted earnings per share was $0.65 compared to $0.82 in the prior year quarter. As you can see in the EPS bridge on slide 5, the year-over-year decline was dominated by non-operational items, including lower pension income and higher interest expense. Despite lower net income, free cash flow improved to $41 million compared to $35 million in the second quarter of 2022, driven by improved working capital management and slightly lower capital expenditures. Our capital expenditures of roughly $40 million in the quarter were down modestly compared to last year and consisted of maintenance capex and select growth initiatives.

Our target for the next couple years is to have capital expenditures consist mostly of maintenance spending with additional investments to support specific projects or visible growth opportunities, just as the case will be in 2023. We previously signaled $125 million to account for maintenance CAPEX, and a top-up to finish the build-out of our BWXT Innovation Campus in Lynchburg, Virginia, that we announced late last year and set up this year. That campus will be the home of our terrestrial microreactor team for the foreseeable future. We are doing our final estimates for the time phasing of CAPEX related to Project Draco that we announced just last week, between 2023 and 2024, but as we have said in the past, this space microreactor buildout will be inside of what we spend for Pele.

In any instance, we are confident that our efforts around working capital management and its effect on operating cash flow will allow us to absorb any potentially higher 2023 CapEx and still achieve our goal of $200 million in free cash flow this year.

Moving now to the segment results on slide six. In government operations, second quarter revenue was up 13% to $492 million, a very strong second quarter level, driven by higher naval nuclear component production and microreactor volume that was partially offset by lower long lead material procurement. Second quarter adjusted EBITDA in the segment was $96 million, essentially flat with last year, as higher revenue was offset by less favorable mix and the new hiring inefficiencies Rex discussed. In commercial operations, revenue was up 2%, driven by higher increased field service activity in our commercial nuclear business, as well as higher BWXC medical revenue, and mitigated by lower fuel fabrication and nuclear component manufacturing volume. Second quarter commercial operations adjusted EBITDA was down approximately $2 million as revenue was skewed toward field service refurbishment activity and less outage work compared to last year.

This was partially offset by improved profitability in medical and by ongoing cost controls in the business. Turning now to guidance on slide seven. Following a strong first half and with more clarity into the remainder of the year, we are raising the lower end of our 2023 adjusted EPS guidance. We project revenue of over $2.4 billion, up high single digits organically compared to 2022, versus our initial target amid the high single-digit annual growth. This industry-leading growth is driven by high single-digit growth in government and mid-single-digit growth in commercial.

While we expect modest EBITDA margin improvement at the segment level, this is somewhat offset by slightly higher corporate expense. Our previous guidance was for corporate EBITDA expense to be roughly in line with the 2019 to 2021 historical average of about $11 million.

We will still be in the same zip code, but may push closer to the higher end of the $10 to $15 million range we had previously forecasted. This increase is driven by human capital investment as we enter our next phase of growth and focus on driving operational performance throughout the organization.

Overall, we continue to expect adjusted EBITDA margins of approximately 20%, leading to adjusted EBITDA of about $475 million, up high single digits compared to 2022, driven almost entirely by organic growth, consistent with our prior guidance. Adjusted EBITDA growth in 2023 is expected to be offset by non-operational items such as lower pension income and higher interest expense. As such, we expect adjusted pre-tax income of around $350 million and adjusted EPS in the range of $2.85 to $3 per share. The increase in the lower end of the range is due to our solid first half results, good visibility into the second half, and slightly lower interest expense.

This is offset by the modest bump in corporate expenses and the timing of the Draco and Hanford Awards. As we look to the second half of the year, I want to identify a few details related to the quarterly cadence of earnings. While we reached the low point for government EBITDA margin in Q2, we expect another quarter of lower than normal EBITDA margins in Q3. Over the last couple years, government EBITDA margins have averaged approximately 21.5%. We expect Q3 to be somewhere between the Q2 level and that average, with a significant improvement to near all-time high EBITDA margins in Q4.

In Q3, government operations margins will steadily increase as we work through the impacts of onboarding inefficiencies as well as the impacts of project mix and timing on newer programs. Also, as a reminder, Q3 is typically one of the lower revenue quarters in our commercial power business as there are fewer outages during the peak summer months. In Q4, we expect a significant sequential increase in volume, fewer onboarding inefficiencies, and the potential to recognize a recovery on non-nuclear components. Overall, BWXC is growing across the portfolio and is building on our strategic successes and competitive positioning, enabling another strong year of operational growth and positioning us to accelerate and achieve our medium financial targets Not only will we remain focused on growth but also on building a stable and enduring management infrastructure with mature processes This will add better predictability and free cash flow conversion that will provide tangible and sustainable shareholder value over time.

And with that, we look forward to taking your questions. I would like to remind everyone in order to ask a question, please press star followed by the number one on your telephone keypad. We ask that you limit yourself to one question and one follow-up. Thank you.

23:56

Your first question comes from Pete Skibisky with Alembic Global. Your line is now open.

24:03

Pete SkibitskiAnalyst, Alembic Global

Guys, Rex, a lot going on, that's for sure. Maybe we could start by talking about labor. I don't know if you guys can quantify the amount of net hiring that took place in the second quarter. It seemed like that enabled the growth at government and maybe what the net hiring goals are for the second half.

24:25

Rex GevedenPresident and Chief Executive Officer

Yeah, I'll put a little color on that feed. I'm really super pleased with what's going on with hiring right now. our chief administrative officer Bob Duffy and his human capital team basically completely redesigned the talent acquisition process and did a kind of a Kaizen approach to that and and took out days and weeks and even months in that process and so the onboarding process the hiring process is really streamlined and really functioning and at the same time if you look at our attrition rate it's we've gone through six quarters of sequential improvement of trailing 12 months attrition and now we're trending back down toward our historical averages which are around you know mid single-digit voluntary voluntary attrition so it's turning the right way the hiring is accelerating and the attrition is decelerating so we're making great strides there and that's really giving us you know there's sort of two factors in the business but one is that's giving giving us the capacity for more volume which is good for the business but it's also creating some inefficiencies on the front end because of training and indirect charges related to that.

So sort of two impacts on the business but all together super well pleased. We've got more work to do but we're climbing the hill really fast right now and I like where we are. And maybe Rob you could offer a little bit more color on that.

25:48

Robb LeMastersSenior Vice President and Chief Financial Officer

Yeah no thanks for the question. Yeah so I'm tracking the data pretty pretty closely. We've seen, as Rex said, as we talked about last quarter, we had that bulge of pending starts and we got those through the funnel. And actually, as I tracked it over the course of the month, every single month during the quarter, we sort of built a larger number of net hires into the company. Ultimately, when I looked at the whole quarter, we're running at about a two times the first quarter number in terms of total net hires. So that's having a really good impact. We don't have the July data in front of us for the full month yet, but I'm sure that's shaping up nicely, too.

So people are coming through. It's also, as Rex said, having a noticeable impact on our utilization. So when I look at the data here on a utilization front, some of our key sites where we're taking in a lot of people, we're seeing a year-over-year impact, as we expected, and that's what's causing a strain. And so in three of our major sites in our core naval business, we're seeing almost a 200-plus decline year over year in utilization. And so as we ramp those people up, that utilization comes through. The third area is just to highlight that we're trying to do increased data runs on is trying to figure out how for the remainder of the year, as you said, we feathered those people in nicely.

So we're looking at different sites and we now have so much more data to try to understand how directs versus indirects come into the business, how we can layer those in even better, and how we can really know when people are going to hit the sites and be able to train them up quickly. So coming through as we expected and having the strain in Q2 that we expected, and ultimately we'll see a little step up in Q3 in terms of margin, and ultimately I think we'll work through the hardest part and be fully primed by Q4.

Okay.

27:46

Pete SkibitskiAnalyst, Alembic Global

Well, it's great to hear the pretty active management there and the progress, guys. Before I get back in Q, let's just talk about Draco if we can. I guess, first of all, Rex, this is an OTA contract, right? So it can't be protested. Maybe you can validate that and maybe give us a sense of whether or not it was booked in the second quarter or it'll go in the backlog in the third quarter. and in my understanding it sounds like it's roughly a three-year contract so will you book revenue on it this year and did that give any sort of upward you know push to guidance this year that was offset elsewhere just just some color about all that would be great thank you yeah well lots to impact there pete yeah exciting win for us that was booked in the third quarter so we'll start to see you know revenues hit the book in the second third quarter we would see the bulk of the revenues on that program going through 24 and 25 and bleeding into 20, 26 and 7 as we, as we fly that, fly that mission.

28:44

Rex GevedenPresident and Chief Executive Officer

But the bulk of it in the next couple of years after this, correct that that contracting mechanism is done through another transactional authority, an OTA, so it's not subject to federal acquisition regulations in that standard format. So there's no appeal path for it. So that's a win. And it's an exciting one, as I said in the script back there, you know, we've won the the flagship program for the space domain, and then last year with Pele, the government flagship program for the terrestrial domain, to add that to the Navy franchise, and that's a pretty important set of projects for us, particularly from the competitive context. So really happy with that win and excited to see that program go forward.

29:26

Robb LeMastersSenior Vice President and Chief Financial Officer

Yeah, just a little bit of information on specific 23 and 24 and 5 and 6. The way I'm looking at that, that's almost about a three-year term for that contract. And as we mentioned, that's about a $200 million. So if you just think about that ratably, it's going to take a while even this year to kind of get it ramping. So maybe think about kind of one quarter of one year hitting kind of this, maybe a little bit more as we kind of ramp into the second half of 2023, but it's going to be only a little bite of it. and then we kind of hit a full call it a third of that contract uh next year in in 24 and 25 and then a little bit as it tapers off in 26.

30:08

Unidentified AnalystAnalyst, CJS Securities

okay thanks for the call guys congrats your next question comes from bob labik with cjs securities your line is now open good afternoon thanks for taking our questions and congratulations on the draco win and also on the FDA Darlington news you just mentioned.

30:31

Rex GevedenPresident and Chief Executive Officer

Thank you, Bob.

30:31

Unidentified AnalystAnalyst, CJS Securities

Sure. So I just wanted to start with that, with the Darlington radiation news. Could you give us a sense of how this impacts the time frame for potential approval, you know, what additional information they've given you, and then, you know, once, you know, assuming approval goes forward, just describe how that impact, how a Darlington generator compares to existing and, you know, versus MER, which it seems like you can leave product past right now.

31:06

Rex GevedenPresident and Chief Executive Officer

Yeah, Bob, that was pretty exciting and an interesting development for us because, I mean, there's certain questions about, you know, the final product, such as, you know, what is the, what are the radio impurities that exist in the target after you irradiate that you really can't answer unless you're in your final solution, which is, in our case, the Darlington reactor using our target delivery system. And so I think, you know, we've been urging the FDA to take that view that as we go through this last target irradiation campaign, it just doesn't make sense to go back through MER.

So we've gotten formal consent to go and pivot to Darlington, which means that we can offer that, as you're well aware, that full suite of Tech 99 generator options all the way up from the small sizes all the way up to the very largest sizes that are on the market today. And whereas with MER, we had, you know, a pretty modest offering of small, small curie generators. So it's extremely important to us. And I think on timeline, I don't want to get into the guessing game on the regulatory approval process. But, you know, you know, suffice it to say, we have, you know, very high confidence of getting into the market in 2024 with that full suite of products.

And so quite a positive belt in the forest.

32:27

Unidentified AnalystAnalyst, CJS Securities

Absolutely. Now, congratulations. That is exciting. And just a brief follow-up, just so I don't annoy you next quarter on this. Are there any more milestones until kind of approval or any other events? Or are we just playing that waiting game over the next few months' quarters until the FDA? You guys will go back and forth with them, but will there be any other announcements? or is that kind of the next announcement over X period of time?

32:51

Rex GevedenPresident and Chief Executive Officer

Yeah, not anticipating any milestones to be published. We certainly do need to go back through our campaign to irradiate the material and get that delivered to the FDA, but really no milestones I think we'll be calling out.

33:09

Unidentified AnalystAnalyst, CJS Securities

Okay, super. Well, congratulations again.

33:09

Rex GevedenPresident and Chief Executive Officer

Thank you.

33:12

Robb LeMastersSenior Vice President and Chief Financial Officer

Yeah, thank you.

33:12

Rex GevedenPresident and Chief Executive Officer

Thank you, Bob.

33:14

Your next question comes from Peter Arment with Baird. Your line is now open.

33:20

Peter ArmentAnalyst, Baird

Yeah, good afternoon, Rex, Rob, Chase. Hey, Rex, thanks for all the color on the SMR kind of updates. I was curious, though, when you made some comments about, you know, not needing a lot of capacity additions, it just seems like there's a lot of things coming your way on the SMR front and small micro-reactors. Maybe you could just give us a little more color on, you know, your ability to kind of weave in, you know, some of these new contracts and opportunities from their existing capacity. Thanks.

33:46

Rex GevedenPresident and Chief Executive Officer

Yeah, maybe that was misunderstood, Peter. We're examining what capacity we need to step into this volume of demand that we see. I mean, I was in our Cambridge plant a couple of weeks ago, and it's chock full of steam generators that we're building for Bruce. The feeders are in there for both Bruce and for Darlington, still finishing up the Darlington project and it is heat there heat very large heat exchangers running through that plant right now so it's it's pretty well jammed up and when you think about you know putting a reactor pressure vessel for that first small modular reactor the BWRX 300 add the other three to it this fall and we're certainly going to get I certainly believe the Ontario province will approve formally the Pickering refurbishment there's 48 steam generators to build for that all the feeders, all the refurbishment waste containers, which are additive to all the above.

And then you've got potential build at TVA at the Clinch River on that same BWRX 300. And then the brew side is looking at you know 4 gigawatts of capacity That almost certainly going to be large plant build So that ends up being either you know CanDo or AP1000 or something And so there's just a tremendous amount of opportunity and volume ahead of us. And so we need to look at what our plant capacity is and whether or not we need to build that additional capacity. And I certainly expect us to need to do that in the coming years because it's just a lot.

35:25

Robb LeMastersSenior Vice President and Chief Financial Officer

Yeah, maybe I'll add something just in terms of trying to talk about the footprint because we're going through kind of a look at if we were to increase capacity. Our main facility in Cambridge, just to give you some sense, a little over 200,000 square feet facility. We're talking about whether you need to add 100,000 square feet there or in the U. S. And there's multiple different ways, different properties that we have to do that and to expand capacity.

I would also note that's a pretty capital life. we do a lot of final assembly in that business, which is different than our government business. So it's really increasing square footage and can be done sort of in that same sphere as what we've talked about in the past, that if this market really takes off, these types of projects are tens of millions of dollars. Depends on how quickly it sort of increases, but that's what we're seeing is that if the SMR market really takes off in either Canada or US, we'd want to to facilitate for that. So that's all conceived of really in the way we've been talking about growth investments in the past.

36:26

Peter ArmentAnalyst, Baird

I appreciate that color. I'll leave it at one. Thanks guys.

36:30

Rex GevedenPresident and Chief Executive Officer

Thanks Peter.

36:31

Your next question comes from David Strauss with Barclays. Your line is now open.

36:38

David StraussAnalyst, Barclays

Thanks, David. The, um, more, hey, hey, Rex. Um, so the, um, the medical business, um, are you still on kind of a trajectory or timeline to, um, go from, you know, I guess somewhere slightly positive, breakeven, even in that business to, uh, you know, the 75 million EBITDA that you've talked about in 2025?

37:08

Rex GevedenPresident and Chief Executive Officer

Yeah, we are. We put out that slide that, that, uh, at Ambassador Day that you're probably well familiar with, that talks about $200 million of revenue and $75 million of EBITDA in kind of the 2025. We put a plus there, obviously, because depending on the timing of what we can get in the market, you kind of need a full year run rate to hit that. So whether that's a full year 2025 or dips over the year, but that's exactly right. We still feel we can hit that. In fact, in the quarter, I can't remember whether we said in the script, we kind of hit a milestone for ourselves. We turned EBITDA positive in the quarter.

And as you recall, at the investor day, I sort of said, geez, I hope by the second half, it was our goal to turn positive at some point in the second half of 2023. And so proud that the team kind of came forward, both because the top line is working as well as really good cost management. The individuals that are running that business is really looking at everything that we're doing and thinking about it, not only from a top line growth, but from an expense standpoint. And so here we are with positive EBITDA in the quarter, and we see that continuing. So that's sort of positive EBITDA from here on in and next stop, hopefully, is 75.

38:19

David StraussAnalyst, Barclays

Okay. Thanks. And, Rob, probably another one for you. So, you know, you talked about it sounds like a little bit of CapEx creep this year, but you think you can offset with working capital. Goodness. Can you maybe talk about, and we've talked in the past about the initiatives on the working capital side, where things kind of stand today and where might the working capital upside come from this year?

38:46

Robb LeMastersSenior Vice President and Chief Financial Officer

Yeah, thanks. That's exactly right. So as we've been sort of where the street's at, it's consistent with the kind of base level of, you know, the $100 million-ish plus we had to finish off that we had a little bit of the $30 million that we announced last year on Project Pele in the 2022 timeframe. But then we really had to eat up the $25, if you will, of the $30 million in 2023.

So $100 plus the $25 is kind of where most people on the street are from a CapEx standpoint. So that's sort of the level that I feel we sit at today as we look at Draco specifically and maybe some light manufacturing activity on the SMRs. You'll get, you know, a little bit of upside potential on the CapEx just to frame it versus that 125. We're, by the way, from a CapEx standpoint, the first half, we're at $70 million. And so if you just, you know, were to double that and say we're on that run rate, that kind you a sense for where CapEx could be beyond the 125. And you're exactly right. What we're trying to do is rally the team around, if you're going to spend more on CapEx, let's find a way to lean in on the working capital side.

And so we have a couple of people really targeting that. My head of finance is really all over that, Mike Fitzgerald, and me spent a lot of time on that. Really, the biggest opportunity we see, there's a couple different elements of working capital. The biggest opportunity we see right now is on the DSO side of things. We're looking hard, not only at receivable, but advanced billings around SIP.

And really what we're seeing is pretty good year over year. We had a good quarter this quarter. We were a little bit better than we expected. we're seeing a lot of management around milestones and billings and thinking about how to structure contracts and hit those milestones at good points. And so ultimately, I see that target of working capital days coming down by one or two days each year. We're actually year over year, we're down by about a day. So I'm hoping to squeak out another day or two over the second half. So we're targeting across-the-board initiatives, but that's where we're spending a lot of time.

41:10

David StraussAnalyst, Barclays

Great. Thanks very much.

41:13

Robb LeMastersSenior Vice President and Chief Financial Officer

Sure.

41:13

Rex GevedenPresident and Chief Executive Officer

Thank you.

41:17

Your next question comes from Michael Termoli with Truist Securities. Your line is now open.

41:25

MichaelAnalyst, Truist Securities

Hey. Good evening, guys. Thanks for taking the question here. I don't know who wants this, Rex or Rob, But certainly when we look at your business, you know, you mentioned TerraPower, Draco, Pele, you've got Triso going. It sounds like there's, you know, a lot of irons in the fire for other SMR work.

How are you managing the potential design risk? I mean, all of these kind of programs and opportunities are first of a kind. Are you, you know, strained on resources there? And I'm just wondering how you, you know, kind of prevent one of these calls from going off the rails if, you know, there's, you know, cost overruns or you're, you know, kind of what we were just saying, missing milestones. But how are you looking at the portfolio and managing that design risk?

42:17

Rex GevedenPresident and Chief Executive Officer

Yeah. Hey, Michael. Thanks for the question. I'll take a crack at that one. You know, we've got quite a design capability in our commercial business in Canada. We had an in-house design capability when we spun in 2015, but recall that we acquired the GE Hitachi business from the Canadian nuclear businesses, you know, in late 2016 and brought in quite a design capability with that. That's the team that does the refueling robotics and a number of other things. They design the target delivery system, and they do other complex nuclear designs. So we've got quite some design depth there. The team has plenty of capacity for it.

Most of these designs, for example, the reactor pressure vessel for the BWRX300, and now this natrium heat exchanger, that's a molten salt to molten salt heat exchanger. That's an exotic thing. a pretty interesting project for us. Those are, you know, projects in the millions, single digit kind of millions. They're typically done on a fixed price basis, but we've got a great history of being able to estimate what the design costs are going to be and managing all that. And so, I don't, it's not, it's not a risk that I worry about very much given our history there and our design depth.

43:42

MichaelAnalyst, Truist Securities

Okay. Okay, good. And then just one more on, I think you kind of mentioned quickly, you're working on pricing with the Navy.

How does that, those negotiations, conversations, and capsule what could potentially happen here with AUKUS and the transfer of those subs? Are they in this pricing agreement or just how should we think about that expectation?

44:07

Rex GevedenPresident and Chief Executive Officer

Yeah, so this pricing agreement certainly does not include anything related to AUKUS. I think that's on the come. What we're negotiating right now is kind of a standard pricing agreement that would have Virginia, Columbia-type content in it. So we have nothing there yet. I expect that in future years. And maybe, Mike, let me go back and add a footnote to my prior answer to you on design risk. that for the government new reactor designs that we have on Pele and for Draco, both of those are done under cost reimbursable contract.

And so we're not exposed to cost risk on those more exotic and more complex designs, let me say. And so we have that. We also have government indemnity on those things. And so much different posture on the government reactor design side of it.

45:02

MichaelAnalyst, Truist Securities

Got it. Perfect. Thanks, guys.

45:05

Robb LeMastersSenior Vice President and Chief Financial Officer

Thanks.

45:06

Rex GevedenPresident and Chief Executive Officer

Thanks, Michael.

45:08

Your next question comes from Andre Madrid with Bank of America. Your line is now open.

45:16

Andre MadridAnalyst, Bank of America

Hey, I know it's kind of been touched on a little bit, but I was wondering if you would maybe quantify a bit more about the sales upside you could be seeing from medical through the end of the year.

45:29

Rex GevedenPresident and Chief Executive Officer

The sales upside, you said?

45:32

Andre MadridAnalyst, Bank of America

Yeah, yeah.

45:33

Rex GevedenPresident and Chief Executive Officer

Yeah, so what we said is our ultimate goal for the year is to be up 20% plus. We had a better quarter than that, and I see for the remainder of the year, prospect for coming in higher than that 20% growth for revenue. That was our target for 23. We're tracking, as I say, year to date to exceed that, and so we'll keep going on that.

45:58

Andre MadridAnalyst, Bank of America

Gotcha, gotcha. about it on my end. I'll hop back in. Thank you.

46:06

Rex GevedenPresident and Chief Executive Officer

Great.

46:06

Andre MadridAnalyst, Bank of America

Thanks for the question.

46:07

Rex GevedenPresident and Chief Executive Officer

Thanks, Andre.

46:09

There are no further questions at this time. With that, I will turn the call back to Chase Jacobson for closing remarks.

46:16

Chase JacobsonVice President of Investor Relations

Thank you, Brianna. Thank you everyone for joining us today. We look forward to seeing and speaking with many of you at upcoming investor events. If you have any questions, you can reach me by phone or email at investors at BWXT. com. Thanks.

46:31

This will conclude the conference call. Thank you for joining us today. You may now disconnect.

Other BWX Technologies earnings calls

  • Q3 2026 earnings call

    Management framed the quarter as evidence of durable core execution and accelerating nuclear opportunities, while emphasizing that commercial awards and capacity expansion remain execution-dependent.

    Nov 02, 2026Confident0.82
  • Q2 2026 earnings call

    Management framed BWXT as positioned for a multidecade nuclear growth cycle, prioritizing capacity investment and core nuclear markets over near-term margin expansion.

    Aug 03, 2026Confident0.78
  • Q1 2026 earnings call

    Management framed the quarter as evidence that execution and capacity expansion can convert nuclear demand into growth, while stressing delivery risks across the broader industry.

    May 04, 2026Confident0.78
  • Q4 2025 earnings call

    Management framed 2026 as a year of broad-based growth, with new government contracts initially diluting margins and commercial demand driving capacity investment.

    Date n/aConfident0.72
  • Q3 2025 earnings call

    Management framed the quarter as execution-led, with unusually strong demand and a preliminary 2026 outlook above medium-term targets.

    Nov 03, 2025Confident0.79
  • Q1 2024 earnings call

    Management framed the quarter as operationally on plan, with long-term nuclear demand supporting capacity investment despite near-term labor, schedule and funding variability.

    May 06, 2024Positive0.65
  • Q4 2023 earnings call

    Management framed 2023 as a strong operational year and 2024 as a continuation of growth, with improving cash conversion and broad demand across markets.

    Date n/aConfident0.72
  • Q3 2023 earnings call

    Management framed the call around durable growth from core franchises and emerging nuclear markets, with execution and cash conversion central to the outlook.

    Nov 01, 2023Confident0.72
  • Q1 2023 earnings call

    Management framed the quarter as a strong but timing-driven start, reaffirmed annual targets, and emphasized labor execution and back-half earnings growth.

    May 08, 2023Positive0.65
  • Q4 2022 earnings call

    Management framed 2023 as a growth year with labor and financing drag masking potential, while new nuclear markets offer longer-term upside.

    Date n/aPositive0.65
  • Q3 2022 earnings call

    Management framed 2022 operations as resilient despite labor and pension headwinds, while emphasizing long-term nuclear demand and a gradual recovery rather than near-term labor normalization.

    Nov 07, 2022Positive0.45
  • Q2 2022 earnings call

    Management framed the quarter as strengthening 2022 confidence while highlighting execution bottlenecks and investments in emerging growth platforms.

    Aug 08, 2022Positive0.55
  • Q1 2022 earnings call

    Management framed the quarter as resilient execution amid COVID absences, while emphasizing strategic growth and a longer-than-planned Tech 99 qualification process.

    May 09, 2022Positive0.68

All BWX Technologies transcripts

About this transcript

The summary, guidance, analyst focus, and tone are automated and should be checked against the call before being relied on. Names and figures can be misheard. Listen to the replay.