Management framed the quarter as evidence of durable core execution and accelerating nuclear opportunities, while emphasizing that commercial awards and capacity expansion remain execution-dependent.
- 22.6%22.6% government margin reflected naval nuclear efficiency and volume, not major changes in newer programs’ economics.
- 2027 growth expectations were refined upward modestly on momentum across government and commercial businesses, with no material change.
- Commercial new-build orders could arrive by year-end, but management said first-half 2027 was the outside expectation.
- Microreactor and enrichment opportunities advanced, while management withheld pricing and specific centrifuge success criteria.
Guidance
- $667M$667 million adjusted EBITDA for 2026
- $4.72$4.72 to $4.77 adjusted EPS for 2026
- $350M$350 million to $360 million free cash flow for 2026
- 6%Approximately 6% of revenue in capital expenditures in both 2026 and 2027
- High single-digit to low double-digit adjusted EBITDA and adjusted EPS growth in 2027
- High single-digit to low double-digit government operations revenue and adjusted EBITDA growth in 2027
- High single-digit organic revenue growth and low single-digit total revenue growth in commercial operations in 2027
- 100 bps50 to 100 basis points commercial adjusted EBITDA margin improvement in 2027
- High single-digit commercial adjusted EBITDA growth in 2027
- Free cash flow flat to slightly higher in 2027 versus 2026
What analysts pressed on
- 01Government margin drivers: naval nuclear efficiency and volume drove improvement; newer programs remain early-stage without major margin adjustments.
- 02PCG integration and synergies: integration is going well, with cost opportunities emerging but no quantified targets.
- 032027 growth refinement: management cited strong 2026 margins and momentum across both segments, but called the change immaterial.
- 04Commercial order timing: SMRs may precede large reactors; management expects possible orders by year-end and no later than first-half 2027.
- 05New-build project gating: management identified risk allocation among customers, government and technology providers, rather than financing, as the main hurdle.
- 06TRISO capacity and investment: Lynchburg output could quadruple, but larger expansion awaits significant demand and commercial HALU availability.
Notable disclosures
- $500M~$500 million of backlog came with PCG, with most acquired business tied to naval work and expected to burn off over time.
- 50%50% additional heavy-component capacity at Cambridge was completed slightly under budget and on schedule.
- 1 metric ton of initial TRISO fuel allocation was contracted to Antares, its first large-scale commercial customer.
- 22 megawatts electrical and 75 megawatts thermal output make Banner larger than most microreactors, according to management.
- U.S. heavy-component facility investment does not depend on firm orders; Poland investment would require sufficient firm orders and government partnerships.
Risks raised
- Commercial new-build awards remain gated by allocation of project risks among hyperscalers, utilities, governments and technology providers.
- Large-scale TRISO expansion depends on concrete future demand and commercial availability of HALU.
- Commercial total revenue growth in 2027 will be restrained by the planned medical divestiture.
- 2027 free cash flow faces continued working-capital and capital-expenditure investment needs.
- New reactor projects remain early-stage, with financing and execution pathways still developing in some cases.
Tone: Confident 0.82
Management reported strong execution, raised free-cash-flow guidance and expressed confidence in 2027 growth, while acknowledging award timing and investment gates.
Who spoke
Company
- Chase JacobsonVice President of Investor Relations
- Rex GevedenPresident and Chief Executive Officer
- Mike FitzgeraldSenior Vice President and Chief Financial Officer
- Unidentified Management
Analysts
- Matt AkersAnalyst, BNP Paribas
- Bob LabickAnalyst, CJS Securities
- Tomo SanoAnalyst, J. P. Morgan
- Jeff CampbellAnalyst, Seaport Research Partners
- Marc BianchiAnalyst, TD Cowen
- Scott DeuschleAnalyst, Deutsche Bank
- Jeff GramppAnalyst, Northland Capital Markets
- Unidentified AnalystAnalyst, William Blair
- Andre MadridAnalyst, BTIG
- Pete SkibitskiAnalyst, Alembic Global
- Peter ArmentAnalyst, Baird
Full transcript
Analyst questions are marked with a bar. Timestamps are into the recording.
Prepared remarks
Ladies and gentlemen, welcome to BWX Technologies' third quarter 2026 earnings conference call. At this time, all participants are in a listen-only mode. Following the company's prepared remarks, we will conduct a question and answer session, and instructions will be given at that time. I would like to turn the call over to our host, Chase Jacobson, BWXT's Vice President of Investor Relations. Please go ahead.
Chase JacobsonVice President of Investor Relations
Thank you. Good evening and welcome to today's call. Joining me are Rex Jeveden, President and CEO, and Mike Fitzgerald, Senior Vice President and CFO. On today's call, we will reference the third quarter 2026 earnings presentation that is available on the Investor Section of the BWST website. We will also discuss certain matters that constitute forward-looking statements. These statements involve risks and uncertainties, including those described in the Safe Harbor provision found in the investor materials in the company's SEC filings. We will frequently discuss non-GAAP financial measures, which are reconciled to GAAP measures in the appendix of the earnings presentation that can be found on the Investors section of the BWXT website. I would now like to turn the call over to Rex.
Rex GevedenPresident and Chief Executive Officer
Thank you, Chase, and good evening to all of you. Just over a month ago at Investor Day, we outlined our path to $5.5 to $6 billion of revenue and $1.1 to $1.2 billion of adjusted EBITDA by 2030, supported by our predictable core, significant incremental organic growth opportunities focused on operational excellence and disciplined capital allocation. Our third quarter results reinforce that guidance with 10% revenue growth and 19% adjusted EBITDA growth, including double-digit growth in both operating segments. Our businesses continue to execute well. We are converting opportunities into meaningful new awards, and we are expanding the industrial capabilities needed to support the next phase of nuclear growth. The demand environment remains exceptionally strong. The need to address economic, national, and energy security challenges globally is driving increased investment by our customers in nuclear national security and commercial power markets.
Our national security customers are investing to reconstitute strategic deterrence capabilities that diminished after the Cold War and to radically improve energy resilience. Our commercial customers are investing in sustaining and growing their nuclear power generation fleets. Funding is coming from public and private sources and there is solid bipartisan political support. What differentiates BWXT is our ability to translate that demand into executable programs and sustained financial growth. Our technical capabilities, industrial scale, and position in the nuclear value chain enable us to deliver integrated solutions for our customers and capture opportunities across these markets.
Turning to our segment results and outlook, the government operations delivered a strong quarter with good operating performance across business lines, driving adjusted EBITDA margin of 22.6%, reflecting the continued benefit of improved efficiency, operational discipline, and higher manufacturing volume. In Naval Propulsion, we booked our annual fuel contract for $189 million and are actively negotiating the next multiyear pricing agreement. In special materials, our defense fuels enrichment and high-purity depleted uranium programs continue to ramp, driving the majority of government operations revenue growth in the quarter. For Defense Fuels, we are designing an HEU enrichment facility in Irwin, Tennessee, an industrializing centrifuge technology in our Oak Ridge facility. We remain on track to test a prototype centrifuge by the end of this year.
On HPDU, as part of our $1.6 billion contract to produce 300 metric tons of high purity depleted uranium annually, we initiated construction of a new large scale facility in Jonesboro, that will drive meaningful revenue growth in the fourth quarter and through 2027. Our technical services teams once again boosted earnings in the quarter without performance on key programs, including Hanford and Savannah River, among others.
From a business development standpoint, we were selected to provide a conceptual design for a lithium processing facility at the Y-12 National Security Complex in support of strategic deterrence. We expect a down selection for the next phase of this program in the first half of 2027. Further, our technical services team is rapidly adopting AI to drive site performance and generate operating efficiencies. This further differentiates TSG as we develop new growth opportunities in that business to augment our base of predictable core earnings.
Moving to advanced nuclear, it was a busy quarter for operations and business development. We completed the core barrel assembly for Project Pele. And just weeks ago, we hosted Energy Secretary Chris Wright at the BWXT Innovation Campus to see our progress firsthand before we deliver the reactor to Idaho National Laboratory next year. We also secured new wins for the BWXT Advanced Nuclear Reactor called Banner. We were selected for the US Army's Janus program that aims to install more than 20 micro reactors of various sizes across five military bases. We are working through the first phase of the contract, including final site selection at Fort Campbell, initiating nuclear regulatory processes, and TRISO fuel production. In parallel, we are working with our partners to fully define the program's costs, execution approach and operating plan.
In addition, Banner was selected by Prodigy Clean Energy for its transportable nuclear power plant project in Belle Dune, New Brunswick, Canada, our first international microreactor win. This is an excellent example of cross-segment collaboration as it brought together capabilities from our advanced nuclear teams from Lynchburg and commercial power and Connetrix teams from Ontario, which will supply chain development and licensing services to Prodigy, highlighting the benefits of our broad capabilities across the nuclear value chain.
And lastly, we entered into a multi-year agreement to supply an initial allocation of one metric ton of TRISO fuel to Antares, our first large-scale commercial customer. This fuel will be manufactured in Lynchburg on the same TRISO production line used for Project Pele, the Antares Mark Zero criticality demonstration reactor, and others. We will also manufacture TRISO for the Janus program on that line. These awards are tangible proof of BWXT's leading position in the advanced nuclear market as we uniquely combine microreactor technology, triso fuel manufacturing, and lifecycle services into a differentiated integrated offering.
Turning now to commercial operations, organic revenue increased 15%, and total revenue grew 25%, driven by double-digit growth in commercial power, connectrix, and medical, along with contribution from the PCG acquisition. During the quarter, we completed the expansion of our Cambridge facility and began utilizing new sections of the plant. The expansion increases our heavy component manufacturing capacity by about 50% and will improve operating efficiency and throughput as we execute on our deep backlog associated with Can-Do life extensions and SMR projects and other new awards. In the United States, we are finalizing design details for a new commercial manufacturing facility for large steam generators and reactor pressure vessels.
The expansion will complement our existing operations and amplify our role as a supermerchant supplier of critical, highly engineered nuclear components. We intend to make a final investment decision by the end of the year. In Europe, we are also seeing high interest in nuclear power, particularly in markets where energy security is a national priority. I recently met with government officials and business leaders in Poland where there is a strong appetite for nuclear power to address their energy security and decarbonization goals. Specific to BWHT, there is a meaningful opportunity to deploy micro-reactors there and participate in the SMR supply chain.
In a decision to invest in manufacturing capacity in Poland, would be backed by firm orders and appropriate government partnerships.
Commercial nuclear demand is precipitating rapidly on a global scale now, and we continue to expect to convert that demand into firm orders in 2027 and in the years to come as the trickle becomes a flood.
With that, I will turn the call over to Mike.
Mike FitzgeraldSenior Vice President and Chief Financial Officer
Thanks, Rex, and good evening, everyone. I'll begin with total company financial highlights on slide four of the earnings presentation. Third quarter revenue was $953 million, up 10% year-over-year, including 7% organic growth. Strong commercial operations performance was complemented by steady growth in government operations. Adjusted EBITDA increased 19% to $180 million, driven by double-digit growth in both operating segments, partially offset by higher corporate expense as we continue to invest for the future.
Adjusted earnings per share increased 26% to $1.26, driven largely by higher operating income as non-operating benefits from lower interest expense and a lower tax rate were partially offset by lower other income. Third quarter free cash flow was $151 million, reflecting strong earnings, favorable advanced billings, and disciplined working capital management. Given our year-to-date performance, we raised the low end of our 2026 free cash flow guidance, resulting in a revised range of $350 million to $360 million.
We continue to expect capital expenditures of approximately 6% of revenue in both 2026 and 2027. These investments are focused on expanding our manufacturing capacity, scaling and fuel capabilities and supporting programs where we see significant long-term demand. Our improving credit profile, including Fitch's inaugural investment-grade rating and Moody's positive outlook revision, reinforces the strength of our financial position and provides flexibility as we execute on our disciplined capital allocation strategy. As we discussed at Investor Day, our top capital allocation priority is investing in attractive organic growth opportunities, maintaining the capacity to pursue disciplined acquisitions and return capital to shareholders when appropriate.
We continue to view balance sheet flexibility as an important competitive advantage as BWST executes on its next phase of growth. Moving to the segment results on slide six, government operations revenue increased 4%, driven by growth in special materials and advanced nuclear, partially offset by modestly lower naval propulsion revenue from reduced materials procurement compared with a strong prior year quarter.
Adjusted EBITDA was $144 million, representing a margin of 22.6% and up 22% from last year, supported by strong operational performance, productivity improvements, and higher technical services equity income. As we look ahead, we remain focused on sustaining productivity improvements in our established businesses while scaling special material programs, supporting our expectation for adjusted EBITDA growth broadly in line with revenue in 2027.
Turning to commercial operations, revenue increased 25%, including 15% organic growth, driven by increases in commercial power, Conetrix, and medical, plus the contribution from the PCG acquisition, which closed in early July.
Growth in commercial power and Conetrix reflected the continued strength of our Canadian components manufacturing and services businesses, as well as increased engineering services revenue in the United States.
Adjusted EBITDA in the segment grew 17% to $41 million. Adjusted EBITDA margin in the quarter was 13.2% as higher volume and good execution more than offset mix and continued investments to scale the business for future growth.
Turning to our consolidated guidance for the remainder of 2026 and our preliminary outlook for 2027. In 2026, the assumptions in our operating guidance are unchanged. We anticipate adjusted EBITDA of approximately $667 million and adjusted earnings per share to be $4.72 to $4.77, both at the midpoint of the previous guidance ranges.
Looking ahead to 2027, our preliminary outlook reinforces the financial trajectory outlined at Investor Day. We expect high single-digit to low double-digit growth in adjusted EBITDA and adjusted earnings per share. Importantly, we expect this growth to be driven by continued expansion in our core businesses, increased contributions from special materials and ongoing improvements in operational execution and productivity 2026 has been an exceptionally strong year and we have a solid foundation for continued earnings growth in 2027, primarily supported by our existing businesses and programs with additional opportunities as new programs and commercial awards progress.
Within government operations, we expect high single-digit to low double-digit revenue and adjust the dividend growth. Special materials will remain a significant growth driver, complemented by increased naval propulsion and advanced nuclear activity. We expect continued productivity improvements and operational execution to help offset the margin mix effects associated with scaling new programs.
In commercial operations, we expect high single-digit organic revenue growth and low single-digit total revenue growth due to the planned medical divestiture, which is on track to close later this year. Organic revenue growth will be supported by our components manufacturing and services businesses. We also expect commercial operations adjusted EBITDA margins to improve by 50 to 100 basis points, reflecting higher volume, continued operational improvements, and better absorption of growth investments, resulting in high single-digit adjusted EBITDA growth. From a cash perspective, we expect another year of solid generation in 2027, with free cash flow anticipated to be flat to slightly higher compared to 2026.
While earnings growth should support increased operating cash flow, we expect continued investments in working capital and capital expenditures to support the significant growth opportunities across our business. We remain focused on disciplined cash conversion and capital deployment as we execute our long-term growth strategy.
Importantly, our preliminary 2027 outlook remains consistent with the longer-term financial framework presented at Investor Day and reinforces our confidence in achieving our 2030 targets. Overall, we had a solid quarter. Our focus on operational excellence, converting our bid pipeline into firm awards, and driving profitable growth, combined with our strong balance sheet and disciplined capital allocation strategy, positions us well to deliver another strong year in 2027.
With that, I'll turn it back to Rex for closing remarks.
Rex GevedenPresident and Chief Executive Officer
Thanks, Mike. To date, 2026 has been an excellent year for BWXT, and I'm excited about what lies ahead. As we close, I will leave you with three thoughts. First, our core businesses continue to deliver strong, predictable performance, providing the foundation for our long-term growth.
Second, the opportunities we discussed at Investor Day are blossoming. We are securing new contracts, executing on strategically important programs, and investing in the industrial capacity needed to grow the business. And third, our focus remains on execution. We recognize the significant opportunities ahead of us and know that long-term value creation depends on converting those opportunities into profitable growth and strong cash generation.
BWXT is exceptionally well-positioned to do that, and our performance this quarter underscores our confidence in the 2030 financial targets we established at Investor Day. With that, we look forward to your questions.
Questions and answers
To ask a question, simply press star 1 on your telephone keypad. We do ask that you please limit questions to one and one follow-up. Your first question comes from the line of Matt Akers with BNP Paribas. Your line is open.
Matt AkersAnalyst, BNP Paribas
Hey, guys. Good afternoon. Thanks for the question. I wonder if you could touch this a little bit more on the government operations margins. It was a really good quarter. And I know you guys, you called out the equity income. I think even excluding that was pretty good. So you could just kind of talk through kind of the big drivers there.
Unidentified Management
Yeah, so thanks, Matt. Look, we're really, really proud of kind of the execution that we're performing within government operations. You know, we've seen a significant increase in our overall margin from our expectations at the beginning of 2026. I think when you get down to it and really what's happening is we're seeing a substantial increase in the efficiency of the volume of the work that were performed specifically in our naval nuclear business. So those contracts are performing very well. We're very focused on managing our volume so that it's highly efficient work.
And we're seeing the results of that. So excited to see that. I think if you look at some of the newer programs, you know, that we've talked about, no major changes there. I think that the growth on those programs, they're performing well, but they're in early stages. And as we've discussed before, you know, we don't take large margin adjustments on those until we get further along from a progress standpoint. So what you're seeing is really excellence in the efficiencies of our core business, and certainly it's great to see.
Matt AkersAnalyst, BNP Paribas
Yeah, thank you. And then was there backlog acquired as part of the PCG deals? It looks like your commercial backlog is up a bit. And if so, can you talk about what that is, sort of how that runs off and how that fits in with your plan to come use that capacity for VWXT work?
Unidentified Management
yeah that's right i mean so when we announced the pcg deal what we had said at the time was that there was still you know most of that business i think 75 to 80 percent of that business was still in the kind of naval naval work and ultimately the rest is commercial um we we had close to 500 million in backlog uh associated with that transaction so that came onto the books associated with that, that'll burn off over a period of time. I mean, the thing that's encouraging is we're seeing growth in the PCG business. But as we stated before, a lot of the, if you look at the capacity, we thought that the factories were about 50% unutilized and that we could, you know, with some modest maybe CapEx investments, be able to get another 50% of that.
So we still want to continue to see that government work continue to be performed, and we'll see some growth in that, probably at a low single digit. But where we're able to do the commercial work is going to be in tapping into that unutilized capacity that currently exists at the site.
Matt AkersAnalyst, BNP Paribas
Great. Thank you.
Your next question comes from the line of Bob Labick with CJS Securities. Bob, your line is open.
Bob LabickAnalyst, CJS Securities
Great, thanks. Congratulations on another strong execution and continued great outlook.
Unidentified Management
Thanks, Bob.
Bob LabickAnalyst, CJS Securities
Sure. I wanted to dig into your capital allocation comments between today a little bit and then some from the analysts there, Investor Day as well. I think to maintain the two to three times leverage by 2030, you'll be spending, I think, somewhere between $3 and $4 billion going forward. And you just reiterated, you know, you want to spend this on attractive organic opportunities as kind of, you know, first thing you want to spend it on. So could you, you know, maybe tell us the top priorities, maybe three, four, five opportunities out there? And then how much of that, you know, $3 billion plus spending is necessary to reach your, you know, revenue and EBITDA numbers?
Or how much is upside? How should we think about, you know, that capital allocation?
Unidentified Management
So, you know, one of the things that we laid out is that we had, if you looked at kind of the slide from our investor day, it actually showed that amount of kind of additional capital. So the way I would think about it is the 2030 targets are really anchored to the 5% to 6% core CapEx spending that we've discussed from a target standpoint. We also stated that we didn't need any specific M&A per se to be able to hit those 2030 targets.
So I would think of that as additional deployment opportunities above and beyond the core business and what we laid out there from a 2030 target standpoint. With that said, I think we're seeing opportunities out there. However, you know, we've made it very clear that when there's not organic opportunities or when there's not additional M&A targets, that we would return that capital to shareholders as appropriate. So I still think there's a real possibility for that.
If you look at our 2027 guidance, you know, we'll do some modest share repurchases consistent with our prior practice of offsetting dilution. But we are focused on kind of the, you know, those capital allocation priorities as stated. When you look at from a priority standpoint, you know, we want to continue to build off the momentum that we've been seeing. So we've talked about, you know, capacity investments that we've made across the business.
We certainly have talked about, you know, special materials, and that's been a great part of our growth story. And then I think you'll hear more around, you know, we're seeing a lot of some traction happening with our microreactor business with the program Janus Wynn and Banner being selected in Canada as well. And so excited to see that market, and hopefully there's some additional opportunities there.
Bob LabickAnalyst, CJS Securities
Okay, super exciting. I'll jump back in queue. I know there's a lot of questions to follow. Thank you.
Your next question is from the line of Tomo Sano with J. P. Morgan. Please go ahead.
Tomo SanoAnalyst, J. P. Morgan
Hi. Good evening, everyone.
Unidentified Management
Hey, Tomo. Thank you.
Tomo SanoAnalyst, J. P. Morgan
Maybe just on commercial operations, your full-year guidance calls for roughly 45% growth in this business. Given where you are through Q3, that implies a pretty big step up in Q4. Is there something specific, a large order or revenue recognition event driving that acceleration, please?
Unidentified Management
Nothing unusual to call out. You know, we've always experienced some ramp in the fourth quarter, you know, as we look at just kind of the timing of that overall from an execution standpoint. point. We are also seeing there will be contribution from PCG as well. So if you look at that on over a year-over-year basis, you're going to see some additional growth there. But I don't think anything unusual from a fourth quarter perspective.
Tomo SanoAnalyst, J. P. Morgan
Thank you, Mike. And just a follow-up on PCG acquisition. It's been a few months since you closed the acquisition. How is integration tracking? Are you seeing the synergies and cost benefits expected on schedule?
Unidentified Management
Yeah, absolutely. Actually, integration is going very, very well. We did not, if you remember, the thesis around this transaction was not necessarily revenue synergies. We did see some opportunities on the cost side, but we didn't put out any specific targets related to that. However, I would say we're finding a lot of opportunities, and the team's been getting very involved in how we can really address this from a U. S. commercial market standpoint. So, I'm very pleased with the progress that we've made, and they've been a great addition to the overall company.
Tomo SanoAnalyst, J. P. Morgan
Great. Thank you very much.
Your next question comes from the line of Jeffrey Campbell with Seaport Research. Please go ahead.
Jeff CampbellAnalyst, Seaport Research Partners
Good afternoon and thanks for taking my questions. Your recent press release concerning rumors of Poland investment was explicit in saying that such a decision would require firm orders of sufficient size to transact. Should we assume the same structure applies to beginning construction of a new U. S. commercial heavy component facility?
Unidentified Management
No, Jeff. No, that U. S. facility does not depend on firm orders. That said, there's so many things in the pipeline that we're certainly compelled to go ahead with that U. S. plant. The Poland situation had to do with some discussions around how much demand we think will precipitate for micro-reactors and small-modular reactors in Poland. and there were certainly gigawatt scales of demand that we discussed.
But no, we're going ahead with the U. S. plan regardless.
Jeff CampbellAnalyst, Seaport Research Partners
Okay, great. One of the things that impressed me in the investor day was the potential remuneration from your exposure to CANDU. Recently I read that Atkins Realis, the state of Indiana, and Who's Your Energy, have partnered to evaluate up to six gigawatts of CANDU reactors for that state. It's a high level. What do you think about CANDU potentially finally making inroads into the U. S. , and is it reasonable to assume BWXD could potentially be a component supplier to this project if it ever materializes?
Unidentified Management
Yeah, maybe to put some things in context, Jeff, you look back at the history of CANDU, and there were about 30 CANDU units delivered globally 20 in Canada itself and so 10 or so that went to other places South Korea China India Romania and Argentina And that's 30 large plants compared to a total global installed base of about 600. So let's say it captured 5% of the international market over the course of those years, and maybe that's a reasonable assumption going forward. I certainly would hope and certainly the Canadians hope that they can build an international market from CanDo and have a real export capability and I think that's feasible and I certainly do hope that they can export into the U. S. and if they do, we will certainly be in that supply chain, probably supplying fuel, major components, feeders, all the things that we normally do, we would do for that.
And that's the purpose of Canada's investment in the CanDo industrial supply base is to be able to create an industry that's durable and has export qualities to it.
Jeff CampbellAnalyst, Seaport Research Partners
Right. Thanks very much for that answer. I appreciate it.
Unidentified Management
Thanks, Jeff.
Your next question comes from the line of Mark Bianchi with TD Cohen. Please go ahead.
Marc BianchiAnalyst, TD Cowen
Hey, thanks. I want to ask first on the 27 outlook. It looks like you upgraded the EBITDA growth expectation a little bit from the investor day. Could you talk a little bit about that?
Unidentified Management
Yeah, I think, you know, look, we're seeing some, we've had really strong performance in the underlying margin for this year. We're seeing some continued momentum as we go into 2027. So I would think of it as kind of a refinement of our expectations. Nothing material, but, you know, we feel confident in ultimately getting to high single to low double digit both on adjusted EBITDA as well as EPS.
Marc BianchiAnalyst, TD Cowen
Okay. Is that more coming from the government side of the business? Just giving the beat and 3Q here?
Unidentified Management
I think, you know, we look at this from a different scenario, so we'll run multiple scenarios. I think it's fair to assume that our government business will continue to perform very well. As mentioned, we're kind of coming off of that, you know, some of those older pricing arrangements. And so we're starting to see that come into the financials as we execute successfully on those programs. But, you know, I would say we're also seeing continued momentum in commercial. So it's, you know, it's positive across the board.
Marc BianchiAnalyst, TD Cowen
Okay. Thanks for that, Mike. And then if I could just ask one more. On the potential orders for commercial, you know, there's, I think everybody's sort of read the news around we've got this DOE, long lead program for large reactors, and then there's a Department of Commerce track for eight reactors, and there was an announcement, I guess it's now several weeks ago, about, you know, the Korean program there. Like, which one of those feels like we could get a quicker hit? And maybe do you think that BWX is, you know, equally positioned for both of those programs or maybe more weighted to one than the other? Just curious for any color you can provide.
Rex GevedenPresident and Chief Executive Officer
Yeah, Mark, I'll add some color there. I think, in my opinion, is that the SMR opportunities have been ahead of the large reactor opportunity. That's just my feel for it. We're certainly in active discussions with Westinghouse and GE on all of that.
So I think we'd see more activity in our order book. I think first from the Darlington Project, Units 2, 3, and 4 up there, I think closely following that would be the TVA opportunities, the 10 reactors there, five at Clinch River, and then five at Bellefonte, I think. and then with the APs to follow that would be my guess.
Now, all those discussions are active, and I think all of that represents opportunity for us, but that's how I see the sequencing.
And I said at the beginning of this year that I expected us to have new orders for U. S. reactor plant builds by the end of this year, and I still think that's a possibility for us, but certainly no later than about the first half of the next year.
Marc BianchiAnalyst, TD Cowen
Yeah. All right, Rex. Thanks very much. We'll start back.
Unidentified Management
Sure, Mark.
Marc BianchiAnalyst, TD Cowen
Thank you.
Your next question comes from the line of Scott Duchel with Deutsche Bank. Please go ahead.
Scott DeuschleAnalyst, Deutsche Bank
Hi, good evening. Mike, can you walk through what's been driving the relatively slow organic growth at government operations year to date? And maybe just kind of what the headwinds have been? And has the revenue cadence surprised you at all, or is it consistent with how you thought the year would play?
Unidentified Management
No, I would say it's consistent. One of the things as we came into 2026, we were going to see a larger ramp on the newer programs, but specifically on the HPDU program as we get on to the third and the fourth quarter. And so we're continuing to see that. We did discuss, I think, last quarter how we were performing actually really well in that program.
And because of that, it was lower revenue, just because we had really strong margin performance, which under a percent complete model actually results in lower revenue. So no surprises. I think those programs are performing well, and we'll continue to see them, you know, into 27 as well.
Scott DeuschleAnalyst, Deutsche Bank
Okay. And then, Rex, if the first U. S. AP1000 builds ultimately get funded by South Korea as opposed to another funding source, is that a negative as it relates to your content opportunity on those initial builds? Or is the funding source not expected to influence supplier content allegations? Thank you.
Rex GevedenPresident and Chief Executive Officer
I think it's hard for me to say on that one, Scott I would say that it's our expectation that we will have to go and compete with Doosan and IHI and all the usual suspects When those opportunities come up That said, I think there's going to be plenty of opportunity for all the players there Because there's actually still not that much capacity globally For these kind of components We'll compete and hopefully get our share And make a great business out of it Is Westinghouse typically the one deciding who gets the content or someone else?
No, I mean, it's my expectation that Westinghouse will be making those decisions.
Scott DeuschleAnalyst, Deutsche Bank
Okay, thank you.
Your next question comes from the line of Jeff Grampy with Northland Capital Markets. Please go ahead.
Jeff GramppAnalyst, Northland Capital Markets
Hey, guys. Rex, stick on the new build topic. from your guys' perspective, what are kind of the main gating item or items keeping new build projects from reaching an FID? Is it predominantly, you know, finance and kind of structuring things related to that, or are there other particular items that you guys see kind of holding things up from getting, you know, a couple of projects across the finish line here?
Rex GevedenPresident and Chief Executive Officer
Yeah, I'm not in those discussions, but what I'm hearing about is it has to do with the allocation of risk. How much are the hyperscalers going to take? How much are the utilities going to take if that applies? How much is the government going to take? Are there any backstops? And how much will the technology provider itself take? And so I think it's about, you know, we've been hearing this concept that everyone bleeds, but no one bleeds to death as it relates to any overruns or risks in the project. So I think it's about the distribution of risk. I don't think it's so much about financing because in the case of the 10X300s and certainly those 10AP1000s and then that second tranche, those are going to be funded through the sovereign investments from South Korea and Japan, as I understand it.
So I think it's less about financing. It's more about allocation of risk.
Jeff GramppAnalyst, Northland Capital Markets
Got it. I appreciate those details. And for my follow-up, can you touch on, you know, BWXT's capabilities to handle, you know, multiple awards or projects for larger nuclear new builds? If this accelerates into the coming years, how does your ability to scale compare to the business opportunities you guys are seeing? And maybe where does that rank in terms of, I guess, the list of worries on a given day for you guys in terms of just capacity to meet the demand that's out there?
Rex GevedenPresident and Chief Executive Officer
yeah well you know good problem to have i would say we've been trying to to uh anticipate all that we of course just increased our our uh our production capacity by about 50 percent at cambridge ontario um we literally literally just completed that expansion um under budget slightly under budget and um and about on the original schedule so we're prepared there uh of course the pcg acquisition was around that thesis. That, as Mike said in an earlier question, we think that that asset is about 50% underutilized and we can build some capacity there for medium reactor components. And then the U. S. plant that we've been talking about for the past couple of quarters is intended to deal with that demand.
So, I mean, we're stacking them up. We're stacking up our capacity. We're certainly one of the largest players in the world, and I think we'll be prepared for it.
Jeff GramppAnalyst, Northland Capital Markets
All right, I appreciate the detail. Thank you, guys.
Your next question is from the line of Mark Shooter with William Blair. Please go ahead.
Unidentified AnalystAnalyst, William Blair
Hey, thanks, guys. Congrats on the quarter. And Rex, I heard you mention that you'll have a prototype test of the DEUCE centrifuge by end of year. I was wondering if you can give us some color under the metrics you'll be judging it by. And speaking of the NNSA program, I know we also talked about the potential of widening that scope to include an obligated LEU and HALU enrichment. So I was wondering if you could tell us how you're thinking about that now.
Rex GevedenPresident and Chief Executive Officer
Yeah, sure thing, Mark. What we're doing, of course, in that program is taking technology developed at Oak Ridge National Laboratory and taking it into industrializing that technology and building production capacity. and ultimately a demonstration cascade at our plants in Oak Ridge. And so I certainly can't cite the particular success criteria for that demonstration. It is just a demo.
And what we're doing, of course, is trying to reduce the complexity, exercise the supply chain, and be able to build an unobligated system. So I think sort of just spinning that thing will be the proof that we're looking for, and we'll be building, you know, certainly many more units in the future. As it relates to the opportunity in between, you know, the technology transfer and the high enriched uranium scope that we have at our Irwin, Tennessee plant, we are certainly pursuing adding low enriched uranium and high assay low enriched uranium to the scope.
Those discussions are ongoing. I can't offer any details on that, but it's certainly in our, you know, certainly in our sites and we hope to add it.
Unidentified AnalystAnalyst, William Blair
That's great.
Rex GevedenPresident and Chief Executive Officer
Thanks for the color there, Rex.
Unidentified AnalystAnalyst, William Blair
Switching gears to the other fuel, Chrysler. Congrats on the Antares win. And so you'll be supporting Antares, Project Pele, Project Janus, all from the Lynchburg facility. So can you remind us what capacity increases are needed today to meet those commitments? And what level of fuel contracting do you need to see to require an expansion past Lynchburg?
Rex GevedenPresident and Chief Executive Officer
yeah i'll offer some some details there mark um we were able to produce you know a couple hundred kilograms a year on that lynchburg line and that's enough capacity for fully fueling the core the pale a reactor and some other things that we did the ontari's demo and a couple of other customers that we actually haven't that we haven't disclosed um you know through some technology changes and some capacity we can add and from some operational improvements we can at least quadruple the output of that facility. That's our Lynchburg plant that I'm talking about, not the Greenfield. So that gives us quite some capacity for the near term. I think in terms of making the larger investment decision and getting to, you know, multiple megatons of, sorry, multiple metric tons of capacity, say at a Wyoming plant, we're going to need to see two things.
We're going to need to see, you know, larger demand precipitate, first with our partner, with our partner Kairos for the Hermes reactor. That one, as an anchor tenant, will consume a lot of triso, and then others, right, multiple banner orders, for example. So we need the precipitation of concrete, significant demand in the future. And we also need to see HALU become available commercially.
And those are two important gates, and we'll get to that decision as that becomes clearer.
Unidentified AnalystAnalyst, William Blair
Appreciate the details.
Rex GevedenPresident and Chief Executive Officer
Thanks, Rex.
Your next question comes from the line of Lawrence Alexander with Jeffries Please go ahead Good morning Just a simple one on commercial operations The margins improvement expected for 27 How important is that? I mean, given the range of the growth opportunities you're evaluating and the incremental investments to support that, do you need that, is that sort of a flexible part of your bridge for next year?
Unidentified AnalystAnalyst, Jefferies
Yeah, I'm sorry. I'm not sure I follow.
Unidentified Management
So, from a, you know, we are seeing some margin improvement as we look into 2027. You know, that's, there's a large mix. If you kind of remember what commercial we have, kind of a services business component that we have ultimately the components margin. So that's just on the components manufacturing. And then we also will have kind of the contribution of PCG that would continue. So different margin mix profiles. I think we're seeing, you know, some substantial growth in the underlying revenue base for the components business.
That is offsetting some of the headwinds that were associated with the divestiture of medical, which was a higher kind of margin business as well. So I think when you blend all that together, I mean, we're not seeing anything unusual. The margin continues to perform well, and we're seeing a slight uptick primarily as a result of just kind of overall mix and growth in different aspects of the business.
Unidentified AnalystAnalyst, Jefferies
Thank you.
Your next question comes from the line of Andre Madrid with BTIG. Please go ahead.
Andre MadridAnalyst, BTIG
Yep. Thanks for squeezing me in. Good afternoon. You know, you had mentioned it before that maybe the gating factor and seeing more commercial orders convert was, you know, kind of the allocation of risk. Do you expect tomorrow's midterm elections to potentially, I guess, complicate those conversations any further or is that not really a concern?
Rex GevedenPresident and Chief Executive Officer
I don't think it's a big concern, Andre, because those deals are constructed outside the framework of congressional appropriations and authorization, and they don't come through the president's budget request. So in some ways, it's outside that whole system. It obviously relates to the tariff deals that were done and the sovereign investments that were made to offset the threat of tariffs.
So I think those deals go forward regardless. And all that said, and I've said this often, you know, I've been in this seat for 10 years and through multiple administrations and support for nuclear has only gotten stronger and stronger. It's bicameral. It's bipartisan. It makes sense for so many different reasons. And so just about everyone lines up behind nuclear now. So I don't expect a lot of impedance here.
Andre MadridAnalyst, BTIG
Got it, Rex. That's helpful. And staying on that point of commercial order flow, I mean, You said that you were expecting some of these to start picking up in the latter part of this year, but definitely no later than the first half of next year. I mean, given the back-end weighted nature of your 2030 targets, I mean, at what point does the pace of commercial order flow start to become a concern? If we don't see, I guess, a specific number of awards come in in the first half of next year, does that kind of put risk on the long-term guidance that you guys outlined?
Rex GevedenPresident and Chief Executive Officer
I don't think so, Andre. I think we've got multiple ways of achieving that guidance, as we've said, and we've mapped in some modest success and commercial orders for new builds. And, yeah, we've got multiple ways to win, and we intend to do so.
Unidentified Management
Yeah, I fully agree.
Andre MadridAnalyst, BTIG
Awesome. Appreciate it, gentlemen. I'll leave it there. Thanks.
Unidentified Management
Thanks, Andre.
Your next question comes from the line of Pete Skabitsky with Alembic Global. Please go ahead.
Pete SkibitskiAnalyst, Alembic Global
Hey, good afternoon, guys.
Unidentified Management
Good afternoon, Pete.
Pete SkibitskiAnalyst, Alembic Global
Hey, Rex, I'd love to get a sense for the revenue opportunity with this New Brunswick prodigy win, I guess we can call it. You know, it looks like, my simplistic math, it looks like it could be maybe two or three banner reactors. But can you give us a sense maybe for what a contract will be signed and maybe there's a way you could size it or put a framework around it?
Rex GevedenPresident and Chief Executive Officer
Yeah, maybe I'll be a little bit coy here, Pete, because if you look at the way – so just backing up a little bit, if you look at the way that Janus program is structured by the Army and DIU, what they're intending to do is create a commercial opportunity for micro-reactors, even though in that case you're selling into the government market.
And this one in Canada, of course, is a purely commercial endeavor, and we've got multiple other commercial opportunities around Banner. So we're certainly not intending to disclose any pricing details because of competitive sensitivities.
But yes, I mean, if you think about selling three micro-reactors, and it is a significant revenue opportunity for us and has the potential to be an exciting business for us. But it's super early days on that one, right? We've been selected for technology. The financing's got a lineup behind it. New Brunswick has committed to an MOU for a power purchase agreement, so there's some government strength behind it, but there's a long road ahead on this one. And I'd like to offer you more details, but I just can't right now.
Pete SkibitskiAnalyst, Alembic Global
Understood. So is it a timeline? So you do Fort Campbell first, and then would Tata be the first kind of commercial deployment, and maybe then New Brunswick?
Rex GevedenPresident and Chief Executive Officer
You know, I mean, certainly Fort Campbell's first in line. But, yeah, opportunities in, you know, opportunities in Wyoming, opportunities in Poland, Canada, Those are all kind of, to me, sort of running in parallel for second place.
Pete SkibitskiAnalyst, Alembic Global
Okay. Okay, got it. If I could ask one last one, because it just popped up. Obviously, Army and Janice is together, but now the Navy is talking about micro-reactors. I was wondering if you guys are going to do the reactor for the Navy at NSWC Crane in Indiana.
Rex GevedenPresident and Chief Executive Officer
No, that's a smaller micro-reactor and being done by one of our competitors.
Pete SkibitskiAnalyst, Alembic Global
Okay. Okay. Okay. Thanks for all the color.
Rex GevedenPresident and Chief Executive Officer
And by the way, Pete, if I could just add a footnote to this whole discussion. You know, a lot of these micro-reactors are out there in the sort of megawatt range, let's call it. There's one five-megawatt reactor. And what we have, of course, with our product, the Banner reactor on the Janus program and elsewhere, is a 20-megawatt electrical output, 22 actually, 75 megawatts thermal. And it's a very high-temperature reactor. So it's suitable for some large-scale applications, even though it's a micro-reactor. You can run large military bases with that. You could provide industrial heat at a large chemical plant, for example. And so we're seeing a range of opportunities that are completely unavailable to our competitors in that space because of the scale of that reactor.
That said, it still fits on a train. This is a rail-shippable, actually modular reactor. When we talk about small modular reactors, those are not small, and frankly, they're not modular. They're built in the field. These things are actually literally built in the factory just as our naval reactors are. And so we've got the largest-scale microreactor that's capable of addressing some very big problems, and that's one of the reasons why we're bullish on it.
Pete SkibitskiAnalyst, Alembic Global
That's great. Thanks so much.
Rex GevedenPresident and Chief Executive Officer
Thanks, Pete.
Your next question comes from the line of David Strauss with Wells Fargo. Please go ahead.
Unidentified AnalystAnalyst, Wells Fargo
Good afternoon. It's Josh Korn on for David. Wanted to ask about the free cash flow guidance. I guess what's weighing on cash in the fourth quarter? And then you seem to be implying a pretty big working capital headwind into next year. Just kind of anything you could provide there. Thanks.
Mike FitzgeraldSenior Vice President and Chief Financial Officer
Yeah, I think, you know, so fourth quarter is just the timing. You know, we had a really strong third quarter, so you're seeing some of that just on overall timing coming into the third quarter. But, you know, we feel good about, you know, where we're guiding for the year, and I think we have a great opportunity to execute on that. When you look at 2027, you know, there's a couple things that are going on. One, you know, we get about a $10 million headwind to pension contributions.
This is normal course primarily associated with the Conetrix acquisition. We have a little bit of working capital investment for some of the growth opportunities, and there is some timing of just overall milestones specifically on, you know, the HPDU and kind of our newer enrichment programs. But, you know, I think at the end of the day, we're seeing, if you look at kind of the underlying true performance from an OCF perspective, we're still seeing good conversion on our core businesses. So a little bit of headwind as we invest for growth and some other kind of unique items, but we still ultimately feel good about where we're going to land for the year.
Unidentified AnalystAnalyst, Wells Fargo
Okay, thank you. I'll stick to one.
Your next question comes from the line of Peter Armitz with Baird. Please go ahead.
Peter ArmentAnalyst, Baird
Yeah, good afternoon, Rex, Mike. Chase. A lot of questions asked. Rex, maybe just a quick one on the budgets. You know, if we don't have any budgets resolved, you know, post-midterms here and things linger into next year, does that have any impact on your thoughts on 27 or is that not really an issue regarding for you guys?
Rex GevedenPresident and Chief Executive Officer
Peter, historically we've been able to work through those continuing resolutions in pretty good shape because almost everything in our portfolio is a program of record and those get funded at 95% of the prior year or whatever. and we typically have some uncoasted carryover that's able to sustain us. We sort of got to the end of our rope on some TSG programs last year when that one ran extra long. But broadly speaking, we've been a little bit immune to CRs, and so I don't think it certainly does influence how we think about the forecast right now.
Peter ArmentAnalyst, Baird
Got it. I'll leave it at one. Thanks, guys. Appreciate it.
Rex GevedenPresident and Chief Executive Officer
Yeah, see you next week, Peter.
And our final question comes from the line of Michael Ciamoli with Guggenheim Securities. Please go ahead. As a reminder, if your line is locally muted, please unmute now.
Unidentified AnalystAnalyst, Guggenheim Securities
Sorry about that. Can you hear me, guys?
Unidentified Management
Evening.
Unidentified AnalystAnalyst, Guggenheim Securities
Thanks for taking the question. And hey, Rex, we get this question a lot from investors on the AP1000, the Westinghouse. And, you know, you guys have, I guess, sized it already as a couple hundred million dollars of content. But just given the comments you made, I mean, how much blood are you willing to lose on that content? You know, if risk is going to be spread around. And I guess I think about it from a margin standpoint. Are there any terms or any potential content or undertaking that would be too risky for you guys?
Rex GevedenPresident and Chief Executive Officer
I think, so, Mike, component manufacturing is something that we understand very, very well, right? And the opportunities we'll go after would be things like RPVs and steam generators and those kind of components that we understand how to make. I think that's a very, very different category of risk than delivery risk. Project delivery risk is what it's all about. And, you know, I've been saying of late that we need more innovation on the delivery side because these final investment decisions ultimately in the commercial sense are driven by the capital cost and the cost of capital. So we, the industry, have to deliver these reactors more quickly and more reliably. So it's not – yeah, I don't see that component manufacturing bears the same kind of risk as delivery.
Now, we'll certainly experience price pressure. We always do that. But we know how to make steam generators, heat exchangers, control rod drive mechanisms, reactor pressure vessels. Just bring it on, right? We can accept that risk, and we do every day.
Unidentified AnalystAnalyst, Guggenheim Securities
Got it. And presumably that's all contemplated in your 2030 forecast in terms of a margin profile?
Rex GevedenPresident and Chief Executive Officer
Absolutely.
Unidentified AnalystAnalyst, Guggenheim Securities
Okay, perfect. I'll keep it there, guys. Thanks a lot.
Rex GevedenPresident and Chief Executive Officer
Thanks, Mike.
And with no further questions in queue, I will now hand the call back to Chase Jacobson for closing remarks.
Chase JacobsonVice President of Investor Relations
Thank you to everyone for joining us today. We look forward to seeing and speaking with many of you at upcoming investor events. you can all feel free to reach out to us at investors at bwxt. com. And we look forward to talking to you and seeing you soon. Thanks for the support.
Thank you again for joining us today. This does conclude today's conference call. You may now disconnect.
Other BWX Technologies earnings calls
- Q2 2026 earnings call
Management framed BWXT as positioned for a multidecade nuclear growth cycle, prioritizing capacity investment and core nuclear markets over near-term margin expansion.
Aug 03, 2026Confident0.78 - Q1 2026 earnings call
Management framed the quarter as evidence that execution and capacity expansion can convert nuclear demand into growth, while stressing delivery risks across the broader industry.
May 04, 2026Confident0.78 - Q4 2025 earnings call
Management framed 2026 as a year of broad-based growth, with new government contracts initially diluting margins and commercial demand driving capacity investment.
Date n/aConfident0.72 - Q3 2025 earnings call
Management framed the quarter as execution-led, with unusually strong demand and a preliminary 2026 outlook above medium-term targets.
Nov 03, 2025Confident0.79 - Q1 2024 earnings call
Management framed the quarter as operationally on plan, with long-term nuclear demand supporting capacity investment despite near-term labor, schedule and funding variability.
May 06, 2024Positive0.65 - Q4 2023 earnings call
Management framed 2023 as a strong operational year and 2024 as a continuation of growth, with improving cash conversion and broad demand across markets.
Date n/aConfident0.72 - Q3 2023 earnings call
Management framed the call around durable growth from core franchises and emerging nuclear markets, with execution and cash conversion central to the outlook.
Nov 01, 2023Confident0.72 - Q2 2023 earnings call
Management framed the call around accelerating nuclear demand, while stressing that hiring-related margin pressure should ease by Q4 and capital spending remain disciplined.
Aug 03, 2023Confident0.72 - Q1 2023 earnings call
Management framed the quarter as a strong but timing-driven start, reaffirmed annual targets, and emphasized labor execution and back-half earnings growth.
May 08, 2023Positive0.65 - Q4 2022 earnings call
Management framed 2023 as a growth year with labor and financing drag masking potential, while new nuclear markets offer longer-term upside.
Date n/aPositive0.65 - Q3 2022 earnings call
Management framed 2022 operations as resilient despite labor and pension headwinds, while emphasizing long-term nuclear demand and a gradual recovery rather than near-term labor normalization.
Nov 07, 2022Positive0.45 - Q2 2022 earnings call
Management framed the quarter as strengthening 2022 confidence while highlighting execution bottlenecks and investments in emerging growth platforms.
Aug 08, 2022Positive0.55 - Q1 2022 earnings call
Management framed the quarter as resilient execution amid COVID absences, while emphasizing strategic growth and a longer-than-planned Tech 99 qualification process.
May 09, 2022Positive0.68
About this transcript
The summary, guidance, analyst focus, and tone are automated and should be checked against the call before being relied on. Names and figures can be misheard. Listen to the replay.